A OPERATING DATA REPORP D0uurr NO. 50-244 DATE Augu_st ,6, 1982 COMPLE*IED BY (m 3m_y* J ,M---f_%
Andrew E. McNamara L
'IELEPIKNE 1 (315) 524-4446
~
OPERATING STA'IUS Ext. 293 or 501 at Ginna.
- 1. Unit Name: GINNA STATION, UNIT #1 Notes: %e reactor power level
- 2. Reporting Period: July, 1982 averaged 100% for the majority of the
- 3. Licensed hermal Power (PWt): 1520 report nonth, the exceptions being
- 4. Nameplate Rating (Gross MWe): 490 detailed on page 4.
- 5. Design Electrical Rating (Net MWe): 470
- 6. Maximum Dependable Capacity (Gross PMe): 490
- 7. Maximm Dependable Capacity (Net MWe): 470
- 8. If Changes Occur in Capacity Ratings (Items Ntaber 3 through 7) Since Last Repor.t, Give Reasons:
- 9. Power Level to Wich Restricted, If Any (Net PMe):
- 10. Reasons Ibr Restrictions, If Any:
h is Month Yr.-to-Date Ctmuulative
- 11. Ilours In Reporting Period 744 5,087 111,143.00
- 12. Ntaber of ikx1rs Reactor Was Critical 744 2,214.00 83,856.62
- 13. Reactor Reserve Shutdown flours 0 0 1,631.32*
- 14. Ilours Generator On-Line 744 2,145.00 81,9723T
- 15. Unit Reserve Shutdown flours 0 0 8. D
- 16. Gross h ermal Energy Generated (MMI) 1,118,424 3,165,480 112,071,034
- 17. Gross Electrical Energy Generated (MWil) 368,647 1,045,668 36,480,633
- 18. Net Electrical Energy Generated (MNEI) 350,580 994,363 34,572,436
- 19. Unit Service Factor 100% 42.17% 73.75%
- 20. Unit Availability Factor 100% 42.17% 73.76%
- 21. Unit Capacity Factor (Using POC Net) 100.3% 41.59% 68.80%
- 22. Unit Capacity Factor (Using DER Net) 100.3% 41.59% 68.80%
- 23. Unit Forced Gutage Rate 0% 23.60% 8.85%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Steam Generator Inspection - 9/25/82. Duration - 3 weeks.
- 25. If Shutdown At Fnd Of Report Period, Estimated Date Of Startup:
- 26. Units In 'Ibst Status (Prior to Ccmuercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY C09ERCIAL OPFEATICN
- Ctunulative 'Ibtal Commencing January 1,1975.
h R
0 p
/
AVERAGE DAILY UNIT POWER LEVEL D00ET NO. 50-244 UNIT #1 Ginna Station IRTE Auoust_6, 1982 C01PIRIED BY diem 2_e 2. W F _ w Andrew E. McNamara
'IELEPHNE 1 (315) 524-4446 Ext. 293 or 501 at Ginna.
MONDI July, 1982 DAY AVERPGE DAILY POWER LEVEL DAY AVERAGE IRILY POWER LEVEL (MWe-Net) (PWe-Net)
- 1. 481 17. 474
- 2. 479 18. 471
- 3. , 480 19. 469
- 4. 480 20. 470
- 5. 480 21. 471
- 6. 481 22. 469
- 7. 481 23. 468
- 8. 479 24. 469
- 9. 480 25. 385
- 10. 477 26. 467 -
- 11. 479 27. 467
- 12. 477 28. 470
- 13. 475 29. 468
- 14. 475 30. 469
- 15. 475 31. 470
- 16. 474 INSTRUCTIW S On this format, list the average daily unit power level in PMe-Net for each day in the reporting month. Capute to the nearest whole megawatt.
- s D00ET NO. 50-244 ,
LNIT NAME il Ginna Station
[ NIT SIUTD01@i MD POWER REDUCTI(NS DME August 6, 1982 ONPLETED BY W E. A c 4 . ,__ _ _
Ardrew E. M$amara N REPORT MNIH July, 1982 'IELEPHONE 1 (315) 524-4446 Ext. 293 or 501 Ginna Method of Duration Reason Shutting Licensee System (baponent Cause & Corrective No. Date Type 1 (Ikxirs) 2 Down Event Code 4 Code 5 Action to Reactor 3 Seport # Prevent Recurrence P/R 07/25/82 S 7 B -
('Ibrbin) Reactor power level reduction to approximately 47% to perform a series of turbine valve and trip tests.
1 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-BNipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File D-Regulatory Restriction 4-Other (Explain) (10 REG-0161)
E-Operator Training & License Examination F-Administrative &
G-Operational Error (Explain) 5 8 H-Other (Explain) Exhibit 1 - Same Sour
e NARRATIVE SIDGERY OF OPERATING EXPERIDICE DOCET NO. 50-244 UNIT Ginna Station, Unit #1 IRTE August; 6, 1982 COMPLETED BY k- M W -j -
Andrew E. Mdiamara
'IELeffDfE 1 (315) 524-4446 Ext 293 or 501 Ginna.
M[Nni July, 1982 he reactor power level was maintained at 100% level for the majority of the report month. We major exception was a power reduction to approximately 47% to perform a series of nonthly turbine valve and trip tests.
l l
l l
l l
l l
1 1
GIftpL STATIQi Maintenance kport July, 1982 During July, routine maintenance and inspections were performed. Major safety related maintenance incitded:
- 1. Replacement of a leaking mechanical seal on one of the Residual Heat Removal Pumps.
- 2. Venting twice of the reference leg of the pressurizer level instrtmentation after one channel drifted away from the other channels.
l l
[
i l
l L.