ML20097J687

From kanterella
Revision as of 03:41, 1 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Final Significant Deficiency Rept SDR-144 Re Improper Clearance Between Rear Brackets & PSA-35 Mechanical Snubber Bodies.Initially Reported on 840726.Spec for Critical Pipe Supports,Hangers & Restraints Revised
ML20097J687
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 08/24/1984
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
OL, SDR-144, NUDOCS 8409210345
Download: ML20097J687 (3)


Text

_

~ a. ,- ,

d U PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET -

P.O. BOX 8699 1881 -1981 PHILADELPHI A. PA.19101 AUG 241984 JOHN S. KEMPFR VIC E-PR ESID E NT ENG5 Nit R4NG AND RESE ARCH Dr. Thomas E. Murley, Director Office of Inspection and Enforcement, Region I United States Nuclear Regulatory Catmission 631 Park Avenue Kirrr of Prussia, PA 19408

Subject:

Limerick Generating Station, Unit 1 Final Significant Deficiency Report No.144 Restricted Swing on Snubbers Paference: Telecon: P.K. Pavlides/PECO to Jane Grant /NRC Dated 07/26/84 File: QUAL 2-10-2 (SDR #144)

Dear Dr. Murley:

In carpliance with 10CFR50.55e, enclosed is the final report on the subject deficiency. Your office was infonned of this matter on July 26, 1984.

Sincerely, W3S/082184/05 Attachment

/08 S N~ f~

Copy to: Director of Inspection and Enforcement United States Nuclear Regulatory Catmission Washington, DC 20555 S. Chaudhary, Resident NRC Inspector (Linerick) 8409210345 840824 PDR ADOCK 05000352 '

S PDR \

JE 7

g g Q \

Limerick Generating Station, Units 1 S' 2  !

Significant Deficiency Report No. 144-Inproper Clearance Between Rear Brackets and PSA-35 Mechanical Snubber Bodies l I. Introduction This is a final report concerning improper clearances between rear brackets and 37 PSA-35 Mechanical Snubber Bodies at Limerick

-Generating Station. PECO has detennined this item to be reportable under 10CFR50.55(e). Twenty-five snubbers are located on Q-listed portions of the Main Steam, High Pressure Coolant Injection, Residual Heat Removal and Emergency Service Water Systems and twelve snubbers are on non-Q listed portions of the Main Steam System outside containment. These snubbers were supplied by Bergen-Paterson Corp. and installed by Bechtel Power Corp., the Architect / Engineer for the Limerick Project.

II. Description of Deficiency On May 17, 1984 it was reported that four snubbers on the Main Steam System had gaps between their rear bracket ends and the snubber bodies which would restrict snubber swing angle to less than 12 . This lack of proper clearances identifies problems associated with design and manufacture from the vendor which allowed components to be built and installed that did not meet the. original specifications for Pipe Hangers Supports, and Restraints (Spec. 8031-P-317, Section 8.2.10).

Bergen-Paterson Corp. has determined that the interference between the rear bracket and the snubber body was caused by brackets supplied with a 3 inch radius instead of the required 2 3/8 inch radius. These units were delivered prior to October, 1979.

III. Corrective Action Bechtel Project Engineering has reviewed the pipe support design, installation, and expected novement/ rotation for each of the supports. This review has shown that 33 Insta11ations are

, acceptable "as is" (based on expected swing angle from the i installed position and the available clearance to swing) and 4 require repair. Repair will consist of fleid trinming 1/4 inch min., 1/2 inch max. from the end of the rear bracket to provide the proper clearances. Additionally, all PSA-35 snubbers will be reviewed as part of~our pre-service examination of snubbers (generic Technical Test TT1.30) to insure that the gap in question is greater than 1/4 inch. The installation l specification for critical pipe supports, hangers and restraints l (Spec. 8031-P-319) has been revised such that all future installations of PSA-35 snubbers will have the proper clearances between the rear bracket and snubber body.

i

~

O O l IV. Sa~ety Im lications Failure of a snubber could result when the snubber is subjected to sufficient bending forces due to pipe movement with inproper rear bracket to snubber clearances. All snubbers are required to be functional to ensure _that the structural Integrity of the reactor coolant system and all other safety related systems is maintained during and following a seismic or other initiating dynamic event for which the systems were designed.

Additionally, failure to provide proper swing angle may overstress the attached system by reducing system flexibility and restricting pipe novement during normal heatup cr cooldown. Because we have Identified the problem with vendor input, evaluated each deficiency and instituted a program for inspection of all PSA-35 snubbers with the appropriate corrective action for Improper clearances, there are no further safety implications. Also, by revising the installation specification, corrective action has been taken to prevent recurrence of this condition.

I KAH/pdO8208401 I

l 4 6 f i

- , - - - ,.