Requests Exemptions from Observation Training Requirements for Personnel W/Min 36 Months Total Nuclear Plant Experience.Completed Operating Experience Data Sheets for All Current License Candidates Encl
ML20098F765
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/28/1984
From: John Marshall
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
9246N, GL-84-10, NUDOCS 8410030349
Download: ML20098F765 (12)


Text

~4- '9 g~l Commonwealth Edison

[ w ")) one First Nation't Plaza. Chicago, litmois Address Reply ta: P:st Offica Box 767

\

(,/ Chicago, Illinois 60690 September 28, 1984 J.

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission

' Washington, DC 20555 Sub ject: Braidwood Station Units 1 and 2 Request for Examples from Observation Training Per 10 CFR 55.7 NRC Docket Nos. 50-456 and 50-457 References (a): Administration of Operating Tests Prior to Initial Criticality (Generic Letter No. 84-10).

(b): April 13, 1984 letter from E. D. Swartz to H. R. Denton concering Braidwood Operating Shift Experience.

Dear Mr. Denton:

Reference (a) required Observation Training for individuals without " extensive : actual operating experience at a comparable

-facility." In accordance with reference (a) and 10 CFR 55.7, Commonwealth Edison requests exemptions from Observation Training for selected individuals who have accumulated experience levels that may permit. waiver of this requirement.

Operating experience data sheets have been completed and are enclosed for all current license candidates. The data has been determined in the same manner as previous Byron Station submittals.

Exemptions from the Observation Training requirements are requested for those personnel with a minimum 36 months total nuclear P plant. experience as. calculated by the conservative methods on the data sheets. This level of experience was chosen because we feel it satisfies the. intent of the requirement for such a - program.

Two additional exemptio,is for people who do not meet the 36 month minimum are requested for the individuals listed below.

Amplifying rational is also provided.

Suo2B8FS8% 3 v #

it \

ec - -

3 w .

H. R. Denton- September 28, 1984 NAME' RATIONALE Sanborn Over.seven years Navy nuclear experience plus EWS qualification for 15 months have given him

- significant operating experience-at power reactors.

Weber Has previously held an FM) license at an operating PWR and has thus gained actual operating experience

in the control rocm.

The name of each individual for whom an exemption is requested has a triangle (Jk) above it. A response from the NRC by

December 1,-1984 will enable Braidwood Station to schedule people from Observation Training on the basis of whether or not they are exempted from that requirement. We would appreciate a response by then.-

Please direct any questions you may have concerning this

~ matter.to this office.

One signed original and fifteen copies of this letter and its-attachment are provided for your-use.

Very truly yours, g.n wd6L J. G. Marshall Nuclear Licensing Administrator 1m cc: Joe-Millan - Region III Don Beckham - NRR, Operating License Branch

' Attachment _(1): Lperating Shift Experience Data Sheets (10 pages) 9246N

a DATE P/31/84 PLANT NAME Braidwood CPERATING SHIFT EXPERIENCE ,

UTILITY . Commonwealth Edison g 3, g 0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)

FOR OPERATING SHIFT POSITIONS (NOTE 1)

ENTER DATA: MONTHS / MONTHS X WEIGHTING FACTOR WEIGHTING MAXIMUM A A g A A TYPE OF EXPERIENCE FACTOR CREDIT Masters McGee Cretens Schuman Jackenn Funka

1. SAME TYPE COPf1ERCIAL SRO 1.00 NO LIMIT-

\

2. OTHER CCM1ERCIAL SRO .75 NO LIMIT
3. SAME TYPE COPHERCIAL R0 1.00 NO LIMIT N '
4. OTHER COMMERCIAL R0 .75 NO LIMIT R E 6m 3m Ma 35 m 15 m 13.5ii

) .50 OTHER) .25 "

72 m 6m 60 m 70 m 4 m %e

6. SIMULATOR 12 MONTHS 3.5 r 3.5 e 3m N (REFERENCE FLANT) 5.00 (12 MONTHS) 3w 3" 3w 4w (SIMILAR) 3.00 (9 MONTHS) 4w .
7. NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT) 24 MONTHS 3" \

(LESS THAN 1h YEARS PRIOR TO F.L.)

(NORE THAN 1% YEARS PRIOR TO F.L.)

.75

.50 (12 MONTHS)

(12 MONTHS) 0" \N

8. LICENJED CLASSROOM TRAINING ANO EXAM .50 9 MONTHS
9. PARTICIPATION AT OPERATING PLANT .75 12 MONTHS \ \ \ \ \ \ \ \
10. OTHER NUCLEAR PLANT EXPERIENCE .25 12 MONTHS h("

\ '

\

11. CON 00CTIhd LICENSE TRAINING .25 9 MONTHS
12. OEGREE (ENGIN ERING, APPLIED SCIENCE OR \

N' 12 m 12 m 12 m \ 12 m 12 m EQUIVALENT) 12 MONTHS g (BACHELORS DEGREE) (12 MONTHS)

BSEE  %-MAT 8SEE BS BSNE (ASSOCIATESCEGREE) (6 MONTHS)

TOTAL NUCLEAR PLANT EXPERIENCE:

HOT PARTICIPATIod EXPERIENCE TIME 20 PWR/8WR (WKS) 15 w (BWR 52w (BWR)

STARTUP & SHUT 00WN (YES/NO) yes (SWR { yes (BWR)

MONTHS ON SHIFT i m (BWR) 24 m (BW -

NOTE 1: SEE *!NSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)" CHECK ONE OF THE FOLLOWING:

NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (SS), SHIFT SRO'S, REACTOR OPERATORS (RO)

ANO SHIFT TEHCNICAL A0 VISORS (STA).

O a-g,g,$og5g,p,y g,y,t,13,y,y ***

O b. Shift advisors iii Probabir be reautred. at least for some sairts.

O c. Do not plan to use shift advisors unless some unforeseen circumstance arises

e ATE 8/31/84 PLAlO NAME Braldwood ' OPERATING SHIFT EXPERIENCE UTILITY Commionwealth Edison 0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)

FOR OPERATING SHIFT POSITIONS (NOTE 1)

ENTER DATA: MONTHS / MONTHS X WEIGHTING FACTOR WEIGHTING MAXItt21 &' & &

TYPE OF EXPERIENCE FACTOR CREDIT Herbert Chovan Bowers P. Smith McCue Petro

1. SAME TYPE CO M RCIAL SRO 1.00 NO LIMIT
2. OTHER COPHERCIAL SRO .75 NO LIMIT *

\

3. SAME TYPE COPNERCIAL R0 1.00 NO LIMIT N '
4. OTHER COPHERCIAL R0 .75 NO LIMIT
5. NAVY (MILITARY) NUCLEAR 36 MCNTHS (RO. L.S. E00W. PPWS) .50 6.

(OTHER) .25

\

$1MULATOR 12 MONTHS 3.5 m 3.5 m 3.5 m 3.5 m (REFERENCE PLANT) 5.00 (12 MONTHS) 3, 3, 3, 3, (SIMILAR) 3.00 (9 MONTHS) N

7. NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT)

.75 24 MONTHS J.5 b t.5 m 3.5 (LESS THAN 1% YEARS PRIOR TO F.L.) (12 MONTHS) 5m 5m 5m (HORE THAN 1 YEARS PRIOR TO F.L.) .50 (12 MONTHS) 22 m

8. LICENSED CLASSROOM TRAINING AND EXAM .50 9 MONTHS

\

9. PARTICIPATION AT OPERATING PLANT .75 12 MONTHS

\ \ \ \

10. OTFER NUCLEAR PLANT EXPERIENCE .25 12 MONTHS
11. CONDUCTING LICENSE TRAINING .25 9 MONTHS

\

12. DEGREE (ENGINEERING. APPLIED SCIENCE OR N

,, 12 m 12 m 12 m 12 m 12 m 12 m EQUIVALENT) 12 MONTHS A $ )

BSME BSNE BSNE BSNE BSEE olo TOTAL NUCLEAR PLANT EXPERIENCE: 52 m 30.5 m =0 , 30.5 a 24 m 38 m HOT PARTICIPATION EXPERIENCE TIME 20 PWR/BWR (WKS) 66 w (BWR *26 w 63 w (BWR >

STARTUP & SHUTDOWN (YES/NO) yes (SWR) yes yes (BWR)

MONTHS ON SHIFT P4 m(BWR 6m 23 m (BW t) .

NOTE 1: SEE

  • INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EX'ERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)= CHECK ONE OF THE FOLLOWING:

1' c g

NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (55). SHIFT SRO'S, REACTOR OPERATORS (RO)

AND SHIFT TEHCNICAL ADVISORS (STA).

O ' g,",,gcjPggtp,1 f,,",,%,t1,7 ""*

u-

  • This tire is based on 100% availability of Ceco's Zion Nuclear Power Station
c. Do not plan to use shift advisors unless some unforeseen circumstance arises

DATE 8tJI/84 PLANT NAME Braidwood 08ERATING SHIFT EXPERIENCE . .

UTILITYCommonwealth Edison

- JOB TITLE: Shift Control Room Engineer 0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)

FOR OPERATING SHIFT POSITIONS (NOTE 1)

ENTER DATA: MONTHS / MONTHS X WEIGHTING FACT;A WEIGHTING MAXIMlM A A TYPE OF EXPERIENCE F8rTOR CREDIT Shim Malewajka Maher Anderson Cooper Stiller Peterson Malkswin

1. SAKE TYPE COP 91ERCIAL SRO 1.00 NO LIMIT
3. OTHER COPHERCIAL SRO .75 NO LIMIT
3. SSX TYPE COPMERCIAL R0 1.00 NO LIMIT
4. OTHER COPMERCIAL R0 .75 NO LIMIT
5. NAVY (MILITARY) NUCLEAR 36 MONTHS 24 m 12 m (RO.EWS.E00W.PPWS) .50 (OTHER) .25 48 m 48 m
6. $1MULATOR 12 MONTHS 3.5 a 3.5 a 3.5 m (REFERENCE PLANT) 5.00 (12 MONTHS) 3w a (SIMILAR) 3.00 (9 MONTHS) 3.w 3w ,

4w ,

7. NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT) 24 MONTHS 3.5 m 0.5 a 5m (LESS THAN 1% YEARS PRIOR TO F.L.) .75 (12 MONTHS)

(MORE TH#N 1% YEARS PRIOR TO F.L.) .50 (12 MONTHS) 5m Im 10 m

8. LICENSED CLASSROOM TRAINING AND EXAM .50 9 MONTHS
9. PARTICIPATION AT OPERATING PLANT .75 12 MONTHS

\ \

10. OTHER NUCLEAR PLANT EXPERIENCE
11. CONDUCTING LICENSE TRAINING

.25

.25 12 MONTHS 9 MONTHS

\

12. DEGREE (ENGINEERING. APPLIED SCIENCE OR EQUIVALENT) ,12 MONTHS

\ 12 m 12 m 12 m 12 m 12 m 12 m 12 m 12 m g g$, g$.

fA OC ES G ) Physi 85ME BSME Biolo BSME BSME BSME

) BSME \

TOTAL NUCLEAR PLANT EXPERIENCE:

26 m 43 m 17.5 m 16.5 m 46.5 m 22.5 m 14 m 17 m HOT PAFTICIPATION EXPERIENCE TIME 20% PWR/BWR (WKS)

STARTUP & SHUT 00WN (YES/NO)

MONTHS ON SHIFT -

NOTE 1: SEE " INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTGAS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)= CHECK ONE OF THE FOLLOWING:

NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (SS). SHIFT SRO'S. REACTOR OPERATORS (RO)

AND SHIFT TEHCNICAL ADVISORS (STA).

O

  • g,1,*,gggy,g g,gg,t1,7 , ***=

O b. Shift advisors will probably be required, at least for some shifts.

Q . c. Do r:ot plan to use shift advisors unless some unforeseen circumstance arises

a PLANT NAME Braidwood OPERATING SHIFT EXPERIENCE .-

UTILITY Conssonwealth Edison JOB TITLE: Shift Foreman O.t. wu_ Amaim ,,, g - gg g g;I g ,,  : tm 2); c ENTER DATA: . MONTHS / MONTHS X WE!GHTING FACTOR WEIGHTING MAXIPRM & .4 A A A A A A A. /5'

- TYPE OF EXPERIENCE FACTOR CREDIT Hidinbotham Bush Meents McCow Rest Chafnicki Sufft Weber Raer thhel

1. SAME TYPE ComEECIAL SRO 1.00 NO LIMIT
2. OTHER Ca mERCIAL SRO .75 NO LIMIT
3. SAME TYPE CO MERCIAL R0 1.00 NO LIMIT N e
4. OTHER ComERCIAL R0 .75 NO LIMIT u
5. NAVY (MILITARY) NUCLEAR 36 MONTels (RO.EWS.E00W,PPWS) 21 m 36 m 12 m 6m

.50 12 m ,

(OTHER) 9

.25 42 m 120 m 48 m 48 m ga

-6. SIMULATOR 12 MONTHS 3.5 a 3.5 m 3.5 a 3m 3m 3m (REFERENCE PLANT) 5.00 (12 MONTHS)

(SIMILAR) 3.00 (9 MONTHS) 3w 3w 3w 4w 4w _

4w

7. NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT) 24 MONTHS *'$, '

(LESS THAN 1 YEARSPRIORTOF.L.) .75 (12 MONTHS) 6m 2a 2m

.50 38 m 45 a 25 m (HORE THAN 1% YEARS PRIOR TO F.L.) (12 MONTHS) 3,

8. LICENSED CLASSROOM TRAINING AND EXAM .50 9 MONTHS 6
9. " "

PARTICTPATION AT OPERATING PLANT .75 12 MONTHS

10. OTHER NUCLEAR PLANT EXPERIENCE .25 12 MONTHS
11. CONOUCTING LICENSE TRAINING .25 9 M0r:THS
12. DEGREE (ENGINEERING, APPLIED SCIENCE OR N EQUIVALENT) 12 MONTHS

' 1m 6m 6m 5m 6m 55 (BACHELORS DEGREE) (12 MONTHS)

(ASSOCIATES DEGREE) (6 MONTHS) 13 hr AS AAS sem AS hrs TOTAL NUCLEAR PLANT EXPERIENCE:

45.5 m 36.5 m 55.5 m 45 m 43.5 m 32.5 m 48 m 34 m 61 m . 51 m HOT PARTICIPATION EXPERIENCE l TIME 20*. PWR/BWR (WKS) 54 w (BWR, 134 w (BUR)

  • 93 w **33 w 107 w (BH)

STARTUP & SHUTDOWN (YES/NO) yes (SWR) yes (BWR yes yes yes (BWR)

MONTHS ON SHIFT 20 M (BWR; 49 m (BWU) 34 m 12 m 52 m (BWR) -

NOTE 1: SEE " INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)" CHECK ONE OF THE FOLLOWING:

NOTE 2: INCLUDE aLL SHIFT SUPERVISORS (SS), SHIFT SRO'$ REACTOR OPERATORS (RO)

AND SHIFT TEHCNICAL ADVISORS (STA).

O a-g,*,dQ" gg,g g,1,g,t1,y We*

c ,,q ,

  • This time is based on 75% availability of CECO's Zion Nuclear Power Station
    • This time is based on 75% availability of Witrantin Electric Power's Point Beach' O b. Shire advisors wiii Probabir be required, at least ro sor- shirts.

l Mucipac Pow r Station O c- Do not Plaa to use shirt advisors unless some unforeseea cirra= stance arises P f

O

' ~ ^ ' ~ - -

DATE 8/31/84 '

PLANT NME Braidwood OPERATING SHIFT EXPERIENCE

  • UTILITY Commonwealth Edison 0.L. DATE August 1985 JOS TIE W t For m NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)

FOR OPERATING SHIFT POSITIONS (NOTE 1)

ENTER DATA: MONTHS / MONTHS I WEIGHTtMG FACTOR WEIGHTING MAXIPRM A A A A TYPE OF DPr1ttENCE FACTOR CREDIT schert, rehert trin Jan un Pame w Receveur

1. SAME TYPE COPttERCIAL SRO 1.00 NO LIMIT N
2. OTHER C0 mERCIAL SRO .75 NO LIMIT
3. SAME TYPE ComERCIAL R0 1.00 NO LIMIT ' '

N '

4. OTHER COPf4ERCIAL RO .75 NO LIMIT
5. NAVY (MILITARf) NUCLEAR 36 MONT<iS (RO. EWS. E00W. PPWS) .50 14 m 36 a 24 m 2.5 m (OTHER) .25 57 a 120 m 48 m 45 a
6. SIMULATOR 12 MONTHS 3a 3m 3a 3m (REFERENCE PLANT) 5.00 (12 MONTHS) 4, 4, 4, 4, (SIMILAR) 3.00 (9 MONTHS)
7. NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT) 24 MONTHS 12 m \ 12 m 4.5 m 12 m \

(LESSTHAN1%YEARSPRIORTOF.L.) .75 (12 MONTHS) 0 II " -

.50 30 m 40 m 42 a 43 m (NORE THAtt 15 YEARS PRIOR TO F.L.) (12710MTHS)

8. LICENSED CLASSROOM TRAINING A M EIAM .50 9 MONTHS ,
9. PARTICIPATION AT OPERATING PLANT .75 12 MONTHS
10. OTHER NUCLEAR PLANT EXPERIENCE .25 12 NONTHS 4 y \

II. CONDUCTING LICENSE TRAINING .25 9 MONTHS

12. DEGREE (ENGINEERING. APPLIED SCIENCE OR , \

EQUIVALENT) 12 MONTHS \ 0" \

(SACHELORS CEGREE) (12 MONTHS)

(ASSOCIATES DEGREE) AS (6 MONTHS) \

TOTAL NUCLEAR PLANT EXPERIENCE: 41 a 35.5 a 32 a 63 a 30 m 53.5 m NOT PARTICIPATICM EXPERIENCE TIME 20% PWR/ SWR (WKS)

  • 26 w STARTUP & SHUTDOWN (YES/NO) I'5 PONTHS ON SHIFT 6m NOTE 1: SEE
  • INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EIFERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)= CHECK CNE OF THE FOLLOWING:

NOTE 2: INCLUCE ALL SHIFT SUPERVISORS ($$). SHIFT SRO'S, REACTOR OPERATORS (RO)

AND SHIFT TEHCNICAL ADVISORS (STA).

O a-g,1,* g ,,, ym 3g,p,y g,1,g,t1,y *** ,

L

  • Th t s based on 100% availability of Ceco's Zion Nuclear O b. Saire savisors witi Preeabir de re2=ir e. at ieast for so m sairts-Q c. Do not plan to use shif t advisors emless sore uforeseen circestance artses

e DATE 8/31/84 PLANT NAME Braftwood e OPERATING SHIFT EXPERIENCE UTILITY Commonwealth Edison 0.L. DATE August 1985 JOB TITLE: Nuclear Station Operator NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)

FOR OPERATING SHIFT POSITIONS (NOTE 1)

WEIGHTING MAXIMUM ENTER E.ATA: MONTHS / MONTHS X WEIGHTIhG FACTOR TYPE OF EXPERIENCE A A A FACTOR CREDIT Waaner Hamilton Pallentt1e B. Smith Royston Yurtcvich Kropp Cooley Lambert Rahriq

1. SAME TYPE COPttERCIAL SR0 1.00 NO LIMIT
2. OTHER COPitERCIAL SRO .75 y

NO LIMIT

3. SAME TYPE COPf4ERCIAL R0 1.00 NO LIMIT '
4. OTHER COPf1ERCIAL R0 .75 NO LIMIT
5. NAVY (MILITARY) NUCLEAR 36 MONTHS (RO. EWS. E00W. PPWS) .50 9m 3a 21 m (OTHER) 25 36 m 12 m
6. SIMULATOR y 42 m 12 MONTHS 3.5 m 3.5 m 3.5 m 3.5 m .5 m 3.5 m 3.5 m 3.5 a 3.5 a 3.5 a 3" 3" 3" 3" N 3" 3" 3" 3" 3"
7. 4.5 s' 4.5 m 4.5 m 4.5 m 6m '

4.5 a 2.5 m. 12 m 2. 3 m NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT) 24 MONTHS 2m 6.5 m 2m

e. 3 m (LESS THAN lh YEARS PRIOR TO F.L.) .75 5m Fm (12 MONTHS) 5m 6m 6m 6m 12 m 6m 5m $1 5m 5 (HORE THAN 1 YEARS PRIOR TO F.L.) .50 (12 MONTHS) 4m 13 a 4m 10 m 14 m
8. LICENSED CLASSROOM TRAINING AND EXAM .50 9 MONTHS 5
9. PARTICIPATION AT OPERATING PLANT "

.75 12 MONTHS " " "

10. OTHER NUCLEAR PLANT EXPERIENCE .25 12 MONTHS

} )

I

\

11. CCNDUCTING LICENSE TRAINING .25 9 MONTHS
12. DEGREE (ENGINEERING. APPLIED SCIENCE OR N EQUIVALENT) 12 MONTHS 3m 7m 6m (BACHELORS DEGREE) 2m 6m (12 MONTHS) 30 70 (ASSOCIATES DEGREE) 24 (6 MONTHS) sem hr sem hr ASS see hr ASS TOTAL huCLEAR PLANT EXPERIENCE:

28 m 43 a 25 m 36 m 20.5 m 30 m 22 m 59.5 e 28.5 m 15 m HOT PARTICIPATION EXPERIENCE TIME 20S PWR/BWR (WKS)

STARTUP & SHUTDOWN (YES/NO)

MONTHS ON SHIFT L.

NOTE 1: SEJ " INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)* CHECK ONE OF THE FOLLOWING:

NOTE 2:

t IttCLUDE ALL SHIFT SUPERVISORS (SS). SHIFT SR3'S. REACTOR OPERATOPS (RO)

AND SHIFT TEHCNICAL ADVISORS (STA), O * ,g,adj!agg,p,y g,y,g,q,ty,y **Ma

,c O b. Shift advisors w*ii Predabir be required. at ienst for some shirts.

O c. Do not plan to use shift advisors unless serie un'oreseen circumstance arises.

as . o _. . . _ . . . . _ . _ _ . . . . _ . . _ . . -

OATE 8/31/84 ,

OPERATING SHIFT EXPEPIENCE PLANT NAME Braldwood UTILITY Comonwealth Edison g g 0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)

FOR OPERATING SHIFT POSITIONS (NOTE 1)

ENTER DATA: MONTHS /HONTHS X WEIGHTING FACTOR WEIGHTING MAXIMJM & A Braq11a Andrews Stefan RWeki 7andem..A Hett Va uerhevden Cuintu FACTOR CREDIT TYPE OF EXPERIENCE 1.00 NO LIMIT

1. SAME TYPE C0tt1ERCIAL SRO

.75 NO LIMIT

3. OTHER COMMERCIAL SRO
3. SAME TYPE CCFNERCIAL R0 1.00 NO LIMIT
4. OTHER COPHERCIAL R0 .75 NO LIMIT
5. NAVY (MILITARY) NUCLEAR 36 MONTHS 21 m 10.5 a

.50 42 m (RO.EWS.E00W.PPWS) .25 42 m (OTHER) 3m

6. SIMULATOR 5.00 12 MONTHS (12 MONTHS)

\ 4, 3m 4,

3m 4,

(REFERENCE PLANT) \ .

($1MILAR) 3.00 (9 MONTHS)

~

24 MONTHS e m '5 m "n

7. NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT) 6m 6m (LESS THAN 1% YEARS PRIOR TO F.L.)

.75 (12 MONTHS) 34 m 38 m 6mA 6m 6m

.50 (12 MONT' 5) 6m \ 17 m 14 m (3 m .

7m (HORE THAN 15 YEARS PRIOR TO F.L.)

8. LICENSED CLA55R00M TRAINING AND EXAM .50 9 MONTHS \
9. PARTICIPATION AT OPERATING PLANT .75 12 MONTHS M* * " "
10. OT;iER NUCLEAR PLANT E;.PERIENCE, .25 12 HONTHS
11. CONOUCT!hG LICENSE TRAINING .25 9 MONTHS \

\

12. DEGREE (ENGINEERING. APPLIED SCIENCE OR 'N . O g 6m 12 NONTHS EQUIVALENT) 0 (BACHELORS DEGREE) (12 MONTHS) AAS (ASSOCIATES DEGREE) (6 MONTHS) semh\

TOTAL NUCLEAR PLANT EXPERIENCE: 48 m 46.5 m 13.5 a 34 m 23.5 23 a 21.5 m 14.5 m HOT PARTICIPATION EXPERIENCE TIME 20% PWR/BWR (WKS)

STARTUP & SHUTDOWN (YES/NO)

MONTHS ON SHIFT NOTE 1: SEE "!NSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR CHECK ONE OF THE FOLLOWING:

OPERATING SHIFT POSITIONS (OL APPLICANTS)*

NOTE 2: INCLUDE ALL SHIFT SUPERh SORS (SS). SHIFT SRO'S, REACTOR OPERATORS (RO)

O a-g,",,al,yg,yg,g g,ag,t1,y ***

AND SHIFT TEHCNICAL ADVISORS (STA).

c. Do not plan to use shift advisors unless some unforeseen circumstance arises.

Q

.n CATI 8/31/84 PLANT NAME Brath ,

l OPERATING SHIFT EXPERIENCE Y UTILITT Commonwealth Edison 1 JOB TITLE: Equipment Operator l 0.L. DATE A89ust 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)

FOR OPERATING SHIFT POSITIONS (NOTE 1) l ENTER DATA: MONTHS / MONTHS X WEIGHTING FACTOR TYPE OF EXPERIENCE A Ot E Carlson Pempe Nordland Spangler Scharf D'Orazio

- 1. SAME TYPE C0f9ERCIAL SRO 1.00 - NO LIMIT -

2. OTHER C0petERCIAL SRO - .75 NO LIMIT , N \ { ,
3. SAME TYPE COP 9tERCIAL R0 1.00 NO LIMIT N gN
4. OTHE' COPeqERCIAL R0 .75 NO LIMIT
5. NAVT (MILITART) NUCLEAR

{

36 MONTE (RO. EWS. E00W. PPWS) .50 \

(OTHER) .25 N 6.

N N SIMULATOR 12 MONTHS 3,$ ,

(REFERENCE PLANT) 5.00 (12 MONTHS)-

(SIMILAR) 3.00 (9 MONTHS) 3W N

7. NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT) 24 MONTHS *"

(LESS THAN 1 TEARS PRIOR TO F.L.) .75 (12 MONTHS)

(MORETHAN14VEARSPRIORTOF.L.) .50 (12 MONTHS) g" \N N

8. LICENSED CLASSROOM TRAINING AND EXAM .50 9 MONTHS

\

9. PARTICIPATION AT OPERATING PLANT .75 12 MONTiS X ,

] ] 2 i l

10. OTHER NUCLEAR PLANT EXPERIENCE .25 12 MONTHS f f lh f
11. CONDUCTING LICENSE TRAINING
12. DEGREE (ENGINEERING, APPLIED SCIENCE

.25 9 MONTHS

\

\

f\l h i EQUIVALENT) 12 MONTHS 6* 6* \\

(BACHELORS DEGREE) (12 MONTHS) \ g$ g5 (ASSOCIATES DEGREE) (6 MONIH3)

\ \

TOTAL NUCLEAR PLANT EXPERIENCE:

9. 5 m_ 20 m 23 m 15 m 15 m 14 m HOT PARTICIPATION EXPERIENCE TIME 20% PWR/BWR (WKS)

STARTUP & SHUTDOWN (YES/NO)

MONTHS ON SHIFT l

NOTE 1: SEE "!NSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR' OPERATING SHIFT POSITIONS (OL APPLICANTS)* CHECK ONE OF THE FOLLOWING:

NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (SS), SHIFT SRO'S, REACTOR OPERATORS (RO)

AND SHIFT TEHCNICAL ADVISORS (STA).

O a-

,y,1,*gg,yg,g g,3,gy,y pa***

O '. Shift ae isors ili oroeabi> ee m

  • e . *: iew. 9r so* sai'u o

O = k m o'v = u w" v --- ~ ~-- '"-

DATg 8/31/84 PLANT NAME B ralhd OPERATING SHIFT EXPERIENCE UTILITY Commonweaith Edison 0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)

FOR OPERATING SHIFT POSITIONS (NOTE 1)

ENTER DATA: MONTHS / MONTHS X WEIGHTING FACTOR WEIGHTING MAXDUt TYPE OF EXPERIENCE FACTOR CREDIT unit, mneuen Acker Biskie seeman Schumacher Kurmuk

1. SAME TYPE Cott1ERCIAL SRO 1.00 NO LIMIT N N_
2. OTHER ComtERCIAL SRO .75 NO LIMIT
3. SAME TYPE Cort 1ERCIAL R0 1.00 NO LIMIT N '
4. OTHER C0rttERCIAL R0 .75 NO LIMIT
5. NAVY (MILITAr.Y) NUCLEAR 36 MONT<ts (RO,EWS,E00W,PPWS) .50 24 m

.25 (OTHER) 48 m N f N MONTH

7. NUCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT) 24 MONTHS 5m (LESSTHANI%YEARSPRIORTOF.L.) .75 (12 MONTHS)

(HORE THAN 1% YEARS PRIOP TO F.L.) .50 (12 MONTHS) 10 m

8. LICENSED CLASSROOM TRAINING AND EXAM .50 9 MONTHS
9. PARTICIPATION AT OPERATING PLANT .75 12 MONTHS Qm
10. OTHER NUCLEAR PLANT EXPERIENCE .25 0 0 12 MONTHS
11. CONDUCTING LICENSE TRAINING .25 9 MONTHS

\

12. DEGREE (ENGINEERING, APPLIED SCIENCE OR \' 6m 9m EQUIVALENT) 12 MONTHS 92 (BACHELORS DEGREE) (12 MONTHS)

AS see (ASSOCIATES DEGREE) (6 MONTHS) hrs.

TOTAL NUCLEAR PLANT EXPERIENCE:

13.5 m 17 m 31.5 m 11 m 1.5 a 2m 2m HOT PARTICIPATION EXPERIENCE TIME 20 PWR/EWR (WKS)

STARTUP & SHUTOOWN (YES/NO)

L_

PME 1: SEE " INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR lMONTHSONSHIFT OPERATING SHIFT POSITIONS (OL APPLICANTS)"

NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (55), SHIFT SR0'$. REACTOR OPERATORS (RO)

AND SHIFT TEHCNICAL ADVISORS (STA).

O CHECK ONE OF THE FOLLOWING:

O a-b.

g,ajpog,75g,g ,g;g,ty,y me*

Shift aevisors iii probabis be required at ienst for some shirts.

Do not piaa to use shirt ao.isars uniess some unforeseen circtostance arises.

O c-

a DATE 8/31/84 PLANT NAME Braidwood OPERATING SHIFT EXPERIENCE '

UTILITY Ceemonwealth Edison 0.L. DATE August 1985 JOB TITLE: SRos (not on shift)

' NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)

FOR OPERATING SHIFT POSITIONS (NOTE 1)

ENTER DATA: PONTHS/ MONTHS X WEIGHTING FACTOR WEICTING MAXIMUM A Lemke & A & A .A A TYPE OF EXPERTrNCE FACTOR CREDIT Yu& ngk Hertogul Ungeran Sanborn Glaza Krowzack Paquette O'Brien Legner

1. SAME TYPE CONMERCIAL SR0 1.00 NO LIMIT
3. OTHER COPHERCIAL SRO .75 NO LIMIT
3. 1.00 '

N SAME TYPE C0Ft1ERCIAL R0 NO LIMIT

4. OTHER COPYTERCIAL R0 .75 NO LIMIT
5. NAVY (MILITARY) NUCLEAR 36 MONT,G 7.5 a 30 m 3m 21 m (RO. EWS. E00W. PPWS) .50 #"

(OTHER) .25 15 m 60 6m 10. M 59 , 43 , 42 m

6. SIMULATOR 12 MONTHS 3.5 m 3.5 m 3.5 m 3.5 m 3.5 m 3.5 3.5 m 3.5 a 3o 5.00 3w 3" 3w "

3w 3" 3w 38 3w .5m 4, (REFERENCE PLANT) (12 MONTHS) 3w 3w 3w (SIMILAR) 3.00 (9 MONTHS) 4w 4w 4w . 4w 2w

7. NUCLEAR PLANT EXPERIENCE ON SHIFT (OWN PLANT)

(LESS THAN 14 YEARS PRIOR TO F.L.) .75 24 MONTHS (12 MONTHS) 34 m I "

x

\N

.50 (MORETHAN15YEARSPRIORTOF.L.) (12 MONTHS)

\ N \

8. LICENSED CLASSR00ri TRAINING AND EXAM .50 9 MONTHS ,

g

9. .75 PARTICIPATION AT OPERATING PLANT 12 MONTHS

\

10. OTHER NUCLEAR PLANT EXPERIENCE .25 m m N 12 MONTHS x M2 m ,
11. CONOUCTING LICENSE TRAINING .25 9 MCNTHS

\ \

12. OEGREE (ENGINEERING. APPLIED SCIENCE OR , 12 m 12 m 12 m 12 m 6m 12 m 12 m 12 m 12 m EQUIVALENT) 12 MONTHS (BACHELORS DEGREE) (12 MONTHS) BSEE 8SNE MBA BSME AS MSNE BSP'E MSIA MSSM (ASSOCIATES DEGREE) (6 MONTHS) MSNE BSNE MSNE ,BSEE .

TOTAL NUCLEAR PLANT EXPERIENCE:

48.5 a 36.5 m 36.5 51.5 m 32 m 43.5 m 30.5 m 37.5 m 70 m 30 m HOT PARTICIPATION EXPERIENCE TIP1E 205 PWR/BWR (WKS)

  • 42 w **32 w STARTUP & SHUTDOWN (YES/NO) yes yes MONTHS ON SHIFT '

15 16 NOTE 1: SEE " INSTRUCTIONS FOR USE OF NUCLEAR POWER. PLANT EXPERIENCE FACTORS FOR CHECK ONC OF THE FOLLOWING:

OPERATING SHIFT POSITIONS (OL APPLICANTS)

NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (55). SHIFT SRO'S. REACTOR OPERATORS (PO) O a-g ,*,d ,c Q a g g , $ t;,q q ,y , y * *

  • t
  • Th s ti is based n 1 availability of Ceco's Zion Nuclear Station b. Shift advisors will probably be required, at least for some shifts.
    • This time is based on 46% availability of Ceco's Zion Nuclear Station * " " "' * $" "" "" " # "

.