ML20105A473
| ML20105A473 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 04/14/2020 |
| From: | Mark D. Sartain Dominion Energy South Carolina |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 19-201A | |
| Download: ML20105A473 (4) | |
Text
Dominion Energy Services, Inc.
5000 Dominion Boulevard, Glen Allen, VA 23060 Dominion Energy.com April 14, 2020 Attn: Document Control Desk Serial No.: 19-201A U.S. Nuclear Regulatory Commission VCS-LIC/TS: RO One White Flint North Docket No. : 50-395 11555 Rockville Pike License No.: NPF-12 Rockville, MD 20852-2738 DOMINION ENERGY SOUTH CAROLINA, INC (DESC)
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS), UNIT 1 REVISION TO REGULATORY ISSUE
SUMMARY
, RIS 2019-02 RESPONSE PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS DESC is submitting a revised NRC Form 536, "Operating Licensing Examination Data,"
for VCSNS Unit 1 that replaces the Form 536 previously submitted on May 16, 2019. The NRC Form 536 previously provided by VCSNS Unit 1 is being corrected to account for an operator licensing examination for calendar year 2021 . There will not be an operator licensing examination for calendar year 2022.
Also note that there will be six reactor operators and six senior reactor operator upgrades for 2021 . This is a change from the numbers provided in the May 16, 2019 submittal, which were six reactor operators, four instant senior reactor operators, and two senior operator upgrades for 2022.
The proposed primary date for the operator licensing examination for calendar year 2021 is August 30, 2021, with an alternate date of September 6, 2021 .
Should you have any questions regarding this matter, please contact Tracey Stewart at (803) 931-5663.
Sincerely, Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Dominion Energy Services, Inc. for Dominion Energy South Carolina, Inc.
Commitments contained in this letter: None
Enclosure:
Revision to NRC Form 536
Serial No. 19-201A Docket No. 50-395 Page 2 of 2 cc: U. S. Nuclear Regulatory Commission, Region II A TIN: Operations Branch Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. Shawn A. Williams U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 81-A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector V. C. Summer Nuclear Station G. J. Lindamood - Santee Cooper
Serial No. 19-201A Enclosure Revision to NRC Form 536 Virgil C. Summer Nuclear Station Unit 1 Dominion Energy South Carolina, Inc.
NRC FORM 536 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)
~RREov,c:
.:,V '1,>. Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This
- g
'4~' 0~
"0 OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear
~
i;; EXAMINATION DATA Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov,
~.s, ., . ~o..e, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office
- "" of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Virgil C. Summer Nuclear Station, Unit 1 Ill I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2021 CY 2022 CY 2023 cy2024 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS CY2021 CY2022 CY2023 CY2024 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 6 6 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 0 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 6 6 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED PROPOSED DATES PRIMARY DATE 08/30/2021 08/07/2023 ALTERNATE DATE 09/06/2021 09/04/2023 NRG FORM 536 (11-2017)