Forwards Project Status Rept,Jul 1979
ML20079R096
Person / Time
Site: Midland, 05000000
Issue date: 09/07/1979
From: Rutgers J
BECHTEL GROUP, INC.
To: Keeley G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20079E080 List:
References
FOIA-83-579 BLC-8128, NUDOCS 8402020061
Download: ML20079R096 (1)


Text

-

$r 0 L efn,c4 9'Mu $(C l: 04 Bechtel Power Corporation 777 East Eisenhower Parkway (O*.Y g Ann Arbor, Mich gan h.yhj

/

. 35 9 . u,uen, P o. 00m 1000. Ann Ardor. Michigan 48In6 C* q q Q,'t ,. $ ,

D ,c Op.d September 7, 1979 9 9L 31GAN so-BLC-8128 #hoo I

Consumers Power Company Mr. G. S. Keeley Project Manager 1945 West Parnall Road Jackson, Michigan 49201 Midland Units 1 and 2 Consumers Power Company Bechtel Job 7220 PROJECT STATUS--July 1979 Files 2620/2801 e

Dear Mr. Keeley:

Enclosed are twelve copies of the Project Status report for July. At the end o'f July we estimated engineering 81 percent complete, construction was 58 per' c ent complete, and overall Project completion at the end of July was 61 percent, based on current trended canhours.

Very tr'ly yours,

/ m

/

John A. Rutger/

Project Mana r JAR /ber Enclosures 12 cc: MrJ T. C. Cooke- (Enc 7)

Mr. D. B. Miller (Enc 1)

?

8402020061 831104 h

'< PDR FOIA PDR ZACK83-579 4' 2 p//