ML20082P187
| ML20082P187 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 09/04/1991 |
| From: | PENNSYLVANIA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17157A838 | List: |
| References | |
| NUDOCS 9109100226 | |
| Download: ML20082P187 (5) | |
Text
,
4 EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQ' J IREMENTS (Continued) 2.
~ w --s_.p, grean.rthan or c al 4 24$
For the HPCI system, verifying that the system develop a flow of
-)
at least 5000 gpa against a test line pressure of r _ % psig when steam is being supplied to the turbine at 150 1 15 psig.a
- 3. Performing a CHANNEL CALIBRATION of the CSS header SP instru-mentation and verifying the setpoint to be i 1 psid.
- 4. Verifying that the suction for the HPCI system is automatically transferred from the condensate storage tank to the suppression chamber on a condensate storage tank water level - low signal and on a suppression chamber - water level high signal.
- 5. Performing a CHANNEL CALIBRATION of the condensate transfer pump (ischarge low pressure alarm instrumentation and verifying the ow pressure alarm setpoint to be > 113 psig.
- d. . . the ADS:
- 1. At least once per 31 days, performing a CHANNEL FUNCTIONAL TEST of the accumulator backup compressed gas system low pressure alarm system.
- 2. At least once per 18 months:
a) Performing a system functional test which includes simulated automatic actuation of the system throughout its emergency operating sequence, but excluding actual valve actuation, b) Manually"* opening each ADS valve when the reactor steam dome pressure is greater than or equal to 100 psig" and observing that either:
- 1) The control valve or bypass valve position responds accordingly, or
- 2) There is a corresponding change in the measured steam flow, c) Performing a CHANNEL CALIBRATION of the accumulator backup compressed gas system low pressure alarm systems and veri-fying air alarm setpoint of 2070 + 35 psig on decreasing pressure.
l
- e. At least every 18 months the following shall be accomplished by any series of sequential, overlapping or total channel steps such that the entire channel is tested:
l L
- The provisions of Specification 4.0.4 are not applicable provided the surveillance is performed within 12. hours after reactor steam pressure is adequate to perform the test.
~
SUSQUEHANNA - UNIT 1 3/4 5-5 Amendment No.112 9109100226 910904 PDR ADOCK 05000387 .
P PDR
( EMERGENCY CORE COOLING SYSTEMS --
)
ycega M er egust de 245 SURVElt. LANCE REQUIREMENTS (Continued) A*#
2.8 For the HPCI system, verifying that the sy;,tes develops a flow of-at least 5000 gpa against a test line pressure of O_': p;5 psig when steam is being supplied to the turbine at 150 2 15 psig."
- 3. Performing a CHANNEL CALIBRATION of the CSS header AP instru-mentation and verifying the setpoint to be < 1 psid.
- 4. Verifying that the suction for the HPCI system is automatically transferred from the condensate storage tank to the suppression chamber on a condensate storage tank water level - low signal and on a suppression chamoer water level high signal.
- 5. Performing a CHANNEL CALIBRATION of the condensate transfer pump discharge low pressure alarm instrumentation and verifying the low pressure alarm setpoint to be > 113 psig,
- d. For the ADS:
- 1. At least once per 31 days, performing a CHANNEL FUNCTIONAL TEST of the accumulator backup compressed gas system low pressure alarm system.
- 2. At least once per 18 months:
a) Performing a system functional test which includes simulated automatic actuation of the system throughout its emergency operating sequence, but excluding actual valve 3
actuation.
b) Manually ** opening each ADS valve when the reactor steam dome pressure is greater than or equal to 100 psig* and observing that either:
- 1) The control valve or bypass valve position responds accordingly, or
- 2) There is a corresponding change in the measured steam flow.
"The provisions of Specification 4.0.4 are not applicable provided the surveillance is performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure is adequate to perform the test.
- For the startup following the Third Refueling and Inspection Outage, this surveillance shall read as follows:
For the HPCI System, verifying that the system develops a flow of at least 4850 gpm against a test line pressure of 600 psig when steam is being supplied to the turbihe at 150 2 15 psig.*
l SUSQUEHANNA - UNIT 2 3/4 5-5 Amendment No.62 DEC 181989
.