QTP 300-532 Revision 2 QUA0 CITIES REFUELING October 1989 INFORMATION REQUEST 1
Unit: 41 Reload: 11 Cycle: __ __12
- 2. Scheduled date for next refueling shutdown: 9-5-92 - - _ .
3.
Scheduled date for restart following refueling: 12-5-92 4.
Will refueling or resumption of operation thereaf ter require a Technical '
Specification change or other license amendment:
UOT AS YET DETERMINED.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information: !
NOT AS YET DETERMINED. r
~
6.
Important licensing considerations associated with refueling e.g., new or different fuel design or supplier, unreviewed design or pe,rformance analysis methods, significant changes in fuel design, new operating procedures:
NONE AT PRESENT TIME.
i t
- 7. The number of fuel assemblies,
- a. Number of assemblies in core: 724
- b. Number of assemblies in spent fuel pool: !
1405 8.
.The present licensed spent fuel pool storage capacity and the size of any increase in-licensed storage capacity that has been requested or is planned in number of fuel assemblies:
L j~ a.- Licensed storage capacity for spent fueli 3657
- b. Planned increase in licensed storage: 0 9.
~The projected date of the last refueling that can be discharged to the
! spent fuel pool assuming the present _Ilcensed capacity: 2009, APPROVED-14/0395t
('""
1- OCT 3 01949 kbk21{gg{gyggggjg4 g,c,o,g,g, R_ PDR
- - _ - , - ~ . _ . _ _ - . . _ _ . , _ _ . _ . _ _ _ . _ _ _ . _ _ . . - . . _ _ . . _ _ _ _ . . _ _ . _ _ _ . . _ _ _ . . . _ _ . .
'O l QTP 300-S32 Revision 2 QUAD CITIES REFUELING October 1989 INFORMATION REQUEST
- 1. Unit: 02 Reload: 10 Cycle: 11
- 2. Scheduled date for next refueling shutdown: 01/01/92
- 3. Scheduled date for restart following refueling: 03/11/92
- 4. Hill refueling or resumption of operation thereafter require a Technical Specification change or other Ilcense amendment: Yes, as listed below:
- 1. Remove Table 3.7-2
- 2. Modification to turbine control valve fast acting solenoid valve.
- 3. Modification to llPCI turbine exhaust steam line.
- 4. IIPC1/RCIC 94-hour shutdown action provision.
- 5. Scheduled date(s) .'or submitting proposed licensing action and supporting informatism:
- 1. 01/15/92
- 2. 04/18/91
- 3. 06/28/91
- 4. 12/31/91
- 6. Important licensing considerations associated with refueling, e.g.. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
NONE AT PRESENT TIME.
- 7. The number o# fuel assemblies,
- a. Number of assemblies in core: 724
- b. Number of assemblies in spent fuel pool: 2287*
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned in number of fuel assemblies:
- a. Licensed storage capacity for spent fuel: 3697
- b. Planned increase in licensed storage: 0
- 9. The projected date of the last refue.ing that can be discharged to the spent fuel pool assuming the present 'icensed capacity: 2009
- 152 new fuel assemblies in new fuel vault.
APPROVED
. I
( '"
14/0395t _" OCT 3 01989 l Q.C.O.S.R.
v VIII. GLOSSARY 4
The following abbreviations which may have been used in the Monthly Report, are defined below:
ACAD/ CAM - Atmospheric Containment Atmospheric .
Dilution / Containment Atnospheric Monitoring l
- American National Standards Institute ANSI APRM - Average Power Range Monitor ATHS - Anticipated T1ansient Without Scram BHR - Soiling Hator Reactor CRD - Control Rod Drive EHC - Electro-Hydraulic Control System i EOF - Emergency Operations facility l GSEP - Generating Stations Emergency Plan HEPA - High-Efficiency Particulate filter
- HPCI - High Pressure Coolant Injection System HRSS - High Radiation Sampling System IPCLRT - Integrated Primary Containment Leak Rate Test j IRH - Intermediate Range Monitor i ISI- - Inservice Inspection i
- Licensee Event Report LER LLRT - Local Leak Rate Test LPCI - Low Pressure Coolant Injection Mode of RHRs LPRM - Local Power Range Monitor HAPLHGR - Maximum Average Planar 1.1near Heat Generation Rate MCPR - Minimum Critical Power Ratio HTLCPR - Hax1 mum Fraction Limiting Critical Power Ratto '
HPC - Maximum Permissible Concentration .
MSIV - Main Steam Isolation Valve >
NIOSH - National Institute for Occupational Safety and Health PCI - Primary Containment Isolation PCIOMR - Preconditioning Interim Operating Management Recommendations RBCCH - Reactor Building Closed Cooling Hater System i RBH - Rod Block Honitor RCIC. - Reactor Core Isolation Cooling System RHRS - Residual Heat Removal System RPS - Reactor Protection System RHH - Rod Horth Minimizer SBGTS - Standby Gas Treatment System SBLC - Standby Liquid Control SDC - Shutdown Cooling Modelof RHRS SDV - Scram Discharge Volume SRM - Source Range Monitor-TBCCH - Turbine Bu11 ding Closed Cooling Hater System TIP - Traversing Incore Probe TSC - Technical Sepoort Center i
l TS 14