ML20065M986

From kanterella
Revision as of 17:13, 30 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Forwards TS Change Request 213 Which Updates & Clarifies TS 3.4.B.1 to Be Consistent W/Existing Spec 1.39 & 4.3.D Re Five Eletromatic Relief Valves Pressure Relief Function Inoperable or Bypassed During Sys Pressure Testing
ML20065M986
Person / Time
Site: Oyster Creek
Issue date: 04/19/1994
From: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20065M989 List:
References
C321-93-2376, NUDOCS 9404260305
Download: ML20065M986 (3)


Text