ML20070B516
| ML20070B516 | |
| Person / Time | |
|---|---|
| Site: | University of Utah |
| Issue date: | 05/25/1988 |
| From: | UTAH, UNIV. OF, SALT LAKE CITY, UT |
| To: | |
| Shared Package | |
| ML20070B459 | List: |
| References | |
| NEL-008, NEL-8, NUDOCS 9101310208 | |
| Download: ML20070B516 (1) | |
Text
__ _ _ _ _ _ . _ . _ _ _ _ . _ _ _ _ _ _ - _ _ _ _ _ _ _ . _ . . _ . - . _ _ . _ _ _ _ .
. .. Form NEL 008 RSC Approvd: 57548
, o PROCEDURE FOR ADDING WATER TO THE REACTOR TANK
- 1. Measure water level from the top of tank. L-3 cm
- 2. Measure water conductivity. Pre mho/cm Post - pmho/cm
- 3. Measure pump flow rate, gpm
- 4. Turn off pump, connect hose to demineralizer inlet, close pump side valve, and open hose valve. Be certain hose water is free from visible contaminants before connectir:g the hose to the system.
- 5. Adjust the hose flow rate to about 5 gpm and fill the tank to approximately 15 centimeters from the top of the tank. (Do not overfill the tank.)
- 6. Measure water level from the top of the tank. (215 cm). L= cm 2
- 7. Return valves to their original positions (open pump side, close hose side),
and disconnect hose. - -
- - ~'
- 8. Restart pump. ~ ~~
- 9. Calculate volume of water adc;ed. gal (LrL j)11.6 - '
- 10. Calculate evaporation rate (gallons / day) gpd
- 11. Operator performing procedure:
- 12. Date completed: Julian Day:
i L
'l 1.
Form approved by Reactor safaty committee:
Reactor Administrator: 2 4' ate: May 25.1988
! 9101310208 PDR 880831
- j. 0 ADOCK 05o00407 4 PDR
- _ _ _ , _ _ _ ,._ _ _ . _ . -_ ,___ _ _ . - - - _ . . _ _ _