ML20070H022

From kanterella
Revision as of 23:29, 27 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests Schedule for Insp of Core Shroud for Cracks at Plant
ML20070H022
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/11/1994
From: Downing L, Gagne C
AFFILIATION NOT ASSIGNED
To: Selin I, The Chairman
NRC COMMISSION (OCM)
References
NUDOCS 9407210074
Download: ML20070H022 (1)


Text

- s uu- 4 e . nun m;o4 ,

I

.l' i

i i

i i l l I i  !

l Ivan Sellin, NRC commissioner

US Nuclear Regulatory Commission l i 11555 Rockville Pike l i Rockville, MD 20852 f

i July 11, 1994 i Ret Power Authority State of New York Power, J.A. FitzPatrick l

Nuclear Plant  ;

i

Dear Mr. Sellin,

i We are requesting the schedule for the inspection of the core l

i ehroud for cracts at the Power Authority State of New York Power, l J.A. FitsPatrick Nuclear Plant.

5 In addition, we are requesting the schedule and inspection f- program for the reactor internals at J.A. FitsPetrick Nuclear Plant because the NRC is now studying the vulnerability of l

l' cracking of the twenty-four othar reactor internals. If there is  ;

l not a schedule available for the~other reactor internals for-i inspection, piemoo indicate why this is not important et this

. time.

Sincerely,  ;

- /

l' Cindy gne' 510 W. First St. So.

Fult n N.Y. 13039

$+ '

Linda Downing

! l R.D.#2 Box 395 5

  • Mexico, N.Y. 13126 T

~

j Ronald Scrudato, Ph.D.

~

l  ;

Raymond Peterson, Ph.D.

Kevin Bond Oswego County CARE (Conservation and Renewable Energy) 9407210074 940711 PDR ADOCK 05000333 Ic.

uv, r

P* PDR

  • L.

Q

_ >