ML042960419
| ML042960419 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/01/2004 |
| From: | David Loveless NRC Region 4 |
| To: | Marksberry D Office of Nuclear Regulatory Research |
| References | |
| FOIA/PA-2004-0307 | |
| Download: ML042960419 (1) | |
Text
uay1a LoveieSS - Mie: t-urs ae i i \
raie_1 I
From: David Loveless To: Don Marksberry Date: Thu, Jul 1, 2004 1:20 PM
Subject:
Re: EOPs 40EP-9EO07, "Loss of Offsite Power/Loss of Forced Circulation," Revision 10 The copy I have has no place for a date.
>>> Don Marksberry 07/01/04 12:04PM >>>
David, Just the title and date is all I need for the ASP report.
Thanks.
>>> David Loveless 07/01/04 12:16PM >>>
Don, EOP 9, does direct the operators to start the GTGs and load them. I can send you a portion of the procedure, but I need your fax number again.
David
>>> Don Marksberry 07/01/04 08:48AM >>>
David, Do the EOPs instruct the operators to ensure or request that GTG are started and loaded given an LOOP? I want to make sure that recovery of power is a single action and not two independent actions (i.e., GTG/swtichyard operators and control room operators). If it's in the EOPs, then a single XHE is sufficient.
Do you have the EOPs handy that you could e-mail or send a copy to me?
2HD