ML031600972

From kanterella
Revision as of 09:06, 22 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Cycle 19 Core Operating Limits Report
ML031600972
Person / Time
Site: Surry Dominion icon.png
Issue date: 05/21/2003
From: Funderburk C
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
03-357
Download: ML031600972 (7)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 May 21, 2003 United States Nuclear Regulatory Commission Serial No.: 03-357 Attention: Document Control Desk NLOS/MM Washington, DC 20555-0001 Docket No.: 50-280 License No.: DPR-32 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 1 CYCLE 19 CORE OPERATING LIMITS REPORT Pursuant to Surry Technical Specification 6.2.C, attached is a copy of the Virginia Electric and Power Company's (Dominion) Core Operating Limits Report for Surry Unit 1 Cycle 19 Paftern EM, Revision 0.

If you have any questions or require additional information, please contact us.

Very truly yours,

. L.Funderburk, Director Nuclear Licensing and Operations Support Attachment Commitment Summary: There are no new commitments as a result of this letter.

Serial No.: 03-357 Docket No. 50-280 cc: U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 Mr. C. Gratton U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9 Rockville, MD 20852 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station

Serial No.: 03-357 Docket No.: 50-280 Attachment CORE OPERATING LIMITS REPORT Surry 1 Cycle 19 Pattern EM Revision 0 May 2003 Virginia Electric and Power Company (Dominion)

1.0 INTRODUCTION

This Core Operating Limits Report (COLR) for Surry Unit 1 Cycle 19 has been prepared in accordance with the requirements of Technical Specification 6.2.C.

The Technical Specifications affected by this report are:

TS 3.1 .E and TS 5.3.A.6.b - Moderator Temperature Coefficient TS 3.12.A.2 and TS 3.12.A.3 - Control Bank Insertion Limits TS 3.12.B.1 and TS 3.12.13.2 - Power Distribution Limits 2.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in section 1.0 are presented in the following subsections. These limits have been developed using the NRC-approved methodologies specified in Technical Specification 6.2.C.

2.1 Moderator Temperature Coefficient (TS 3. .E and TS 5.3.A.6.b) 2.1.1 The Moderator Temperature Coefficient (MTC) limits are:

+6.0 pcm/F at less than 50 percent of RATED POWER, or

+6.0 pcm/°F at 50% of Rated Power and linearly decreasing to 0 pcm/°F at Rated Power 2.2 Control Bank Insertion Limits (TS 3.12.A.2) 2.2.1 The control rod banks shall be limited in physical insertion as shown in Figure 1.

SlC19 COLR Rev 0 Page 2 of 5

2.3 Heat Flux Hot Channel Factor-FO(z) (TS 3.12.B.1)

FQ(z) < K(z) for P > 0.5 FQ(z) < K(z) for P <0.5

0.5 whzere

P=ThermalPower Rated Power 2.3.1 CFQ = 2.32 2.3.2 K(z) is provided in Figure 2.

2.4 Nuclear Enthalpy Rise Hot Channel Factor-FAHN) (TS 3.12.B.1)

FAH(N) < CFDHx {1+ PFDH(1-P)}

where: P-=ThermalPower Rated Power 2.4.1 CFDH=1.56 for SurryImproved Fuel (SIF) 2.4.2 PFDH=0.3 SlC19 COLR Rev 0 Page 3 of 5

Figure 1 S1C19 ROD GROUP INSERTION LIMITS Max w/d position = 230 steps 230 (0.4938, 230) 220 210 200

_____C-BA K 190 (1.0, 113) 180 170 160 150 (0, 151)

B 140 C,

Cn 130 o 120

._2 cn D-B NK o 110 0.

O 100 cL CDoo 0 50 90 0

70 80 70 60 50 40 30 20 (0,23) =

10 0 F + 4- F * + F t 4-0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Fraction of Rated Thermal Power SlC19 COLR Rev 0 Page 4 of 5

Figure 2 K(Z) - Normalized FO as a Function of Core Height 1.2 1.1

6,1.0 1.0 0.9 (12, 0.925 0.8 0 7 C

N .

0 N

<0.6 0

z N

0.5 0.4 0.3 0.2 0.1 0.0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 CORE HEIGHT (FT)

SlC19 COLR Rev 0 Page 5 of 5