Annual Assessment Letter - FitzPatrick
ML040630156
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/02/2004
From: Meyer G
Division Reactor Projects I
To: Ted Sullivan
Entergy Nuclear Northeast
References
IR-04-001
Download: ML040630156 (6)


Text

March 2, 2004 Mr. Theodore Sullivan Vice President - Operations Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093

SUBJECT:

ANNUAL ASSESSMENT LETTER - JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2004001)

Dear Mr. Sullivan:

On February 5, 2004, the NRC staff completed its end-of-cycle plant performance assessment of the James A. FitzPatrick Nuclear Power Plant. The end-of-cycle review for FitzPatrick involved the participation of all technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1, 2003 through December 31, 2003. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.

Overall, FitzPatrick operated in a manner that preserved public health and safety, and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the previous three quarters, was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to perform only reactor oversight process (ROP) baseline inspections at your facility through September 30, 2005.

The enclosed inspection plan details the inspections scheduled through September 30, 2005. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last twelve months of the inspection plan are tentative and may be revised at the mid-cycle review meeting.

As you are aware, the NRC has issued several Orders and threat advisories to enhance security capabilities and improve guard force readiness since the terrorist attacks on September 11, 2001.

We have conducted inspections to review your implementation of these requirements and have monitored your actions in response to changing threat conditions. For calendar year 2004, we plan to continue inspections of order implementation combined with newly developed portions of the security baseline inspection program.

Mr. Theodore Sullivan 2 In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5211 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Glenn Meyer, Chief Projects Branch 3 Division of Reactor Projects, Region 1 Docket No. 50-333 License No. DPR-59

Enclosure:

FitzPatrick Nuclear Power Plant Inspection/ Activity Plan

Mr. Theodore Sullivan 3 cc w/encl:

G. Taylor, CEO, Entergy Operations K. Mulligan, General Manager, Plant Operations B. OGrady, VP Operations Support M. Colomb, Director of Oversight A. Halliday, Manager, Regulatory Compliance M. Kansler, President, Entergy D. Pace, VP Engineering J. Fulton, Assistant General Counsel Supervisor, Town of Scriba S. Lyman, Oswego County Administrator C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law P. Eddy, Electric Division, Department of Public Service, State of New York P. Smith, President, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority S. Lousteau, Treasury Department T. Judson, Central New York Citizens Awareness Network Institute of Nuclear Power Operations (INPO)

Mr. Theodore Sullivan 4 Distribution w/encl: (VIA E-Mail)

Region I Docket Room (with concurrences)

RidsNrrDipmIipb L. Cline, DRP - NRC Senior Resident Inspector D. Dempsey, Resident Inspector H. Miller, RA J. Wiggins, DRA G. Meyer, DRP S. Barber, DRP C. ODaniell, DRP N. Sheehan, PAO W. Lanning, DRS R. Crlenjak, DRS R. Conte, DRS J. White, DRS R. Lorson, DRS J. Rogge, DRS L. Doerflein, DRS J. Joliceur, OEDO R. Laufer, NRR G. Vissing, PM, NRR R. Clark, NRR P. Tam, NRR DOCUMENT NAME: G:\BRANCH3\ROP4 Annual Assess Ltrs\Fitz AA Letter .wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP R1/DRP NAME LCline/GWM GMeyer/GWM for for DATE 03/04/04 03/02/04 OFFICIAL RECORD COPY

Page 1 of 2 FitzPatrick 03/02/2004 12:49:46 Inspection / Activity Plan Report 22 01/01/2004 - 09/30/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7111111B - LO REQUALIFICATION PROGRAM 2 1 IP 7111111B Licensed Operator Requalification Program 04/26/2004 04/30/2004 Baseline Inspections 7112103 - OCC RAD SAFETY - INSTRUMENTATION 1 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 05/24/2004 05/28/2004 Baseline Inspections 71152B - PROBLEM IDENTIFICATION AND RESOLUTION 4 1 IP 71152B Identification and Resolution of Problems 07/19/2004 07/23/2004 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems 08/02/2004 08/06/2004 Baseline Inspections 71114 - EP PROGRAM INSPECTION & PI VERIFICATION 1 1 IP 7111402 Alert and Notification System Testing 08/23/2004 08/27/2004 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 08/23/2004 08/27/2004 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/23/2004 08/27/2004 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/23/2004 08/27/2004 Baseline Inspections 1 IP 71151 Performance Indicator Verification 08/23/2004 08/27/2004 Baseline Inspections 71130 - SECURITY 2 1 IP 7113001 Access Authorization 08/23/2004 08/27/2004 Baseline Inspections 1 IP 7113002 Access Control 08/23/2004 08/27/2004 Baseline Inspections 1 IP 7113008 Fitness For Duty Program 08/23/2004 08/27/2004 Baseline Inspections 1 IP 71151 Performance Indicator Verification 08/23/2004 08/27/2004 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 08/30/2004 09/03/2004 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 08/30/2004 09/03/2004 Baseline Inspections 7111108 - INSERVICE INSPECTION 1 1 IP 7111108G Inservice Inspection Activities - BWR 10/04/2004 10/08/2004 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 10/04/2004 10/08/2004 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 10/04/2004 10/08/2004 Baseline Inspections 1 IP 71151 Performance Indicator Verification 10/04/2004 10/08/2004 Baseline Inspections 7112102 - OCC RAD SAFETY - ALARA 1 1 IP 7112102 ALARA Planning and Controls 12/13/2004 12/17/2004 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 02/14/2005 02/18/2005 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 02/14/2005 02/18/2005 Baseline Inspections 71111.05 - TRIENNIAL FIRE PROTECTION INSPECTION 3 1 IP 7111105T Fire Protection 03/07/2005 03/11/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 FitzPatrick 03/02/2004 12:49:46 Inspection / Activity Plan Report 22 01/01/2004 - 09/30/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71111.05 - TRIENNIAL FIRE PROTECTION INSPECTION 3 1 IP 7111105T Fire Protection 03/21/2005 03/25/2005 Baseline Inspections 7111401 - EXERCISE & EP PI INSPECTION 1 1 IP 7111401 Exercise Evaluation 03/07/2005 03/11/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 03/07/2005 03/11/2005 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 03/21/2005 03/25/2005 Baseline Inspections 5/16 EXM - OPERATOR LICENSING INITIAL EXAMS 3 1 U01525 FITZPATRICK INITIAL EXAM (8/23-27/04) 04/18/2005 04/22/2005 Not Applicable 1 U01516 FITZPATRICK INITIAL EXAM (2/23-3/1/04) 05/16/2005 05/20/2005 Not Applicable 7112202 - PUB RAD SAFETY - RADWASTE 1 1 IP 7112202 Radioactive Material Processing and Transportation 05/02/2005 05/06/2005 Baseline Inspections 7111107B - HEAT SINK 1 1 IP 7111107B Heat Sink Performance 06/13/2005 06/17/2005 Baseline Inspections 7111121 - SSDI 6 1 IP 7111121 Safety System Design and Performance Capability 08/01/2005 08/05/2005 Baseline Inspections 1 IP 7111121 Safety System Design and Performance Capability 08/15/2005 08/19/2005 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 08/29/2005 09/02/2005 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 08/29/2005 09/02/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 08/29/2005 09/02/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.