Text
-' FPL Energy
- P ~g FPL Energy Seabrook Station
-Seabrook Station P.O. Box 300 Scalbrook, NIl 03874 (603) 773-7000 APR 15 2004 Docket No. 50-443 NYN-04034 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station March 2004 Monthly Operating Report Enclosed please find Monthly Operating Report 04-03. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of March, 2004 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Supervisor, at (603) 773-7776.
Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Station Director cc:
H. J. Miller, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate I-2 G.T. Dentel, NRC Senior Resident Inspector
OPERATING DATA REPORT I OCKET NO. 50-443 UNIT NAME Seabrook 1 DATE Aprie 052004 COMPLETED BY Pete Nardone TELEPHONE (603) 773-7074 REPORTING PERIOD March 2004
- 1. Design Electrical Rating 1 148.00
- 2. Maximum Dependable Capacity (MWe-Net) 1,155.30 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 2,184.00 105,013.80
- 4. Number of Hours Generator On-line 744.00 2,184.00 102,098.29
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWHrs) 861,942.75 2.528,891.82 114,983,223.04 UNIT SHUTDOWNS Type Method of No. Date F: Forced Duration Reason Shutting Cause & Corrective Action S: Scheduled (Hours) Down 2 Comments
SUMMARY
- The unit operated at 100% power for the entire month. This yielded an availability factor of 100% and a capacity factor of 100.28% based on the MDC value of 1155.3 Net MWe.
I 2 Reason: Method:
A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic TriplScram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
Page 1 of 1