JAFP-04-0101, Operator Licensing Examination Data
| ML042020026 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 07/12/2004 |
| From: | Ted Sullivan Entergy Nuclear Northeast, Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| JAFP-04-0101 | |
| Download: ML042020026 (2) | |
Text
Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
James A. Fitzpatrick NPP h Entergy RO. Box 110 Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 T.A. Sullivan Site Vice President - JAF July 12, 2004 JAFP-04-01 01 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Operator Licensing Examination Data Please find the enclosed submittal of James A. FitzPatrick's Operator Licensing Exam Data (NRC Form 536) as requested in NRC Regulatory Issue Summary (RIS) 2004-10, Preparation and Scheduling of Operator Licensing Examinations.
If you have any questions, please contact Patrick Berry, Training Manager 315-349-6240.
Very truly yours, T.A. SULLIVAN TAS/PJB/SR/Ils Enclosure CC: USNRC Regional Administrator, Region 1 Exam File JAFP RMS JTRG File 30
Attachment 1 RIS 2004-10 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315040131 EXPIRES: 0713112005 5-2003) Estimated burden per response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden O PERA^TOR LICEN SING RCommission, estimate to the Records Management Branch (T4 ES), U.S. Nucear Regulatory Washington. DC 20555-00011 or by Internet e-mail to EXAMINATION DATA Infocollectsenrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washingtorn DC 20503. If a means used to Impose an Infhrmation collection does not display a currently valid OMB contrd number, the NRC may not conduct or sponsor, and a person is not required to respond to, the kinfmation collection.
- ACLrrY NRC REGIN James A. FitzPatrick Nuclear Power Plant NRC Region I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 05 CY 06 CY'07 CY 08 ESTIMATED NUMBER OF LICENSEE-PREPARED I I 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 05 CY 06 CY 07 Cy 08 NUMBER OF REACTOR OPERATORS 0 5 5 NUMBER OF SENIOR REACTOR 9 2 2 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS- UPGRADE 3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED - _
PROPOSED DATES PRIMARY DATE 5-16-2005 5-15-2006 4-7-2008 ALTERNATE DATE 5-22-2006 4-14-2008 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 05 CY 06 PROPOSED _
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBE DECEMBER ESTIMATEDI NUMBER OF 9 CANDIDATES NRCFORM SM (5-2C03) PRINTEDON RECYCaEDPAPER