Interim Deficiency Rept Re Improper Field Mounting of Agastat 7000/E7000 Series Relays.Initially Reported on 820702.Investigation Underway.Relays Will Be Reworked to Ensure Conformance.Also Reported Per Part 21
ML20055C012
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/03/1982
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
REF-PT21-82 10CFR-050.55E, 10CFR-50.55E, PLA-1223, NUDOCS 8208100038
Download: ML20055C012 (3)


Text

~ _ - _ _ - _

CDR $)- ee s b I ,

' 56-M7

@ Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101
  • 215 / 770 5151 Norman W. Curtis Vice President-Engineering & Construction-Nuclear 215/ 770-5381 August 3, 1982 Mr. R. C. Haynes Director Region I U.S Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 SUSQUEHANNA STEAM ELECTRIC STATION INTERIM REPORT OF A DEFICIENCY ON IMPROPER FIELD MOUNTING OF AGASTAT 7000/E7000 RELAYS ERs 100450/100508 FILES 821-10/840-4 PLA-1223

Dear Mr. Haynes:

This letter serves to provide the Commission with an interim report of a deficiency relating to improper field mounting of Agastat 7000/E7000 series relays. The deficiency was originally reported to Mr. E. C. McCabe of NRC Region 1 by A. R. Sabol of PP&L on July 2, 1982 as potentially reportable.

The information contained in this report is submitted pursuant to the provisions of 10CFR50.55(e).

The attachment to this letter contains a description of the problem, and the information currently available regarding its cause, safety implications, and the corrective action to be taken.

Since the details of this report provide information relevant to the reporting requirements of 10CFR21, this correspondence is considered to also discharge any responsibilities PP&L may have in compliance thereto.

We expect to issue a final report on this condition detailing the cause and final corrective actions by October 10.

Very truly yours, R

N. W. Curtis D Vice President-Engineering & Construction MHC:pvm Attachment 8208100038 820803 PDR ADOCK 05000387 lb'l S PDR k....i.i

^*

.- August 3, 1982 Page 2 SSES PLA-1223 >

. ERs 100450/ Files 821-10/

s 100508 840-4 Mr. R. C. Haynes cc: Mr. Richard C. DeYoung (15)

Director-Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G. Mcdonald, Director (1)

Office of Management Information & Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Gary Rhoads U.S. Nuclear Regulatory Commission P.O. Box 52 Shickshinny, PA 18655 6.... .

c- ce SSES ._PLA-1223 ER2 100450/ Filsa 821-10/

100508 840-4 Mr. R.'C. Haynes INTERIM REPORT 1.0

SUBJECT:

Improper field mounting of Agastat 7000/E7000 series relays.

l

2.0 DESCRIPTION

i In order to comply with seismic criteria, Agastat 7000/E7000 series relays must be mounted with at least 4 corner screws. A preliminary field walkdown of the Agastat's indicated that not all relays were j mounted with 4 corner screws.

. 3.0 CAUSE:

The cause of this deficiency is presently unknown and is under investiga-tion.

t 4.0 ANALYSIS OF SAFETY IMPLICATIONS:

Due to the improper mounting screw configuration, the relay's operability in affected safety related systems is indeterminate under design basis l seismic conditions. Since Agastat timing relays, with the improper mounting screw configuration are used in the control circuits for various safety related systems, a common mode failure and subsequent loss of system function is considered possible. PP&L considers this condition to be reportable under the requirements of 10CFR50.55(e).

5.0 ACTION TO BE TAKEN: ,

i Safety related Agastat series 7000/E7000 relays will be inspected and l

reworked as necessary to ensure that they conform to the required mounting configuration. The corrective action for Unit I will be documented on PP&L NCR 82-769 and will be completed prior to initial criticality. Unit 2 corrective action will be completed prior to system turnover.