PLA-6499, Description of Changes to Revision 5 to Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Security and Contingency Plan, PLA-6499

From kanterella
Revision as of 13:50, 12 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Description of Changes to Revision 5 to Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Security and Contingency Plan, PLA-6499
ML091050465
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/02/2009
From: Spence W
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-6499
Download: ML091050465 (3)


Text

SAFEGUARDS INFORMATION William H. Spence President PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 610.774.3683 Fax 610.774.5019 WHspence@pplweb.com ppI APR 0 2 ?OQR U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OP1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION DECRIPTION OF CHANGES TO REVISION 5 TO THE PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN AND SECURITY AND CONTINGENCY PLAN FOR SUSQUEHANNA :STEAM ELECTRIC STATION Docket Nos. 50-387 PLA-6499 and 50-388

Reference:

1) PLA-6477, Mr. William H. Spence (PPL)to Document Control Desk (USNRC),

"Revision 5 to the Physical Security Plan, Training and QualificationPlan, Safeguards Contingency Plan and Security and Contingency Plan" dated February6, 2009.

Revision 5 to the PPL Susquehanna, LLC (Susquehanna Steam Electric Station) Physical Security Plan was submitted in Reference 1. As a supplement to the plan itself, attached are descriptions of the changes that are contained in Revision 5.

Pursuant to 10 CFR 50.54(p), PPL Susquehanna, LLC has determined that the changes do not decrease the safeguards effectiveness of the plan and may therefore be made without prior NRC approval.

Should you have any questions or require additional information, please contact Mr. Michael R. Sleigh, Manager - Nuclear Security, at (570) 542-3200.

NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."

SAFEGUARDS INFORMATION 2ýod 001-

SAFEGUARDS INFORMATION Document Control Desk PLA-6499 I declare under penalty of perjury that the foregoing is true and correct.

Executed on: 04 .

W. H. Spence Attachment cc: Mr. S. J. Collins, NRC Regional Administrator Mr. F. W. Jaxheimer, NRC Sr. Resident Inspector, w/o attachment Mr. B. K. Vaidya, NRC Project Manager NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION Document Control Desk PLA-6499 bcc: C. E. Manges, Jr. NUCSA4, w/o attachment P. A. Horn (SRC) NUCSB2, w/o attachment M. H. Crowthers GENPL4, w/o attachment M. R. Sleigh NUCNG, w/o attachment R. E. Smith NUCSA4, w/o attachment T. G. Wales (DBD) GENPL5, w/o attachment NRA Files GENPL4, w/o attachment DCS GENPL4, w/o attachment NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."

SAFEGUARDS INFORMATION