January 16, 2014
Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT: TURKEY POINT NUCLEAR POWER PLANT - NOTIFICATION OF CYBER SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR INFORMATION (NRC INSPECTION REPORT NO. 05000250/2014404 AND 05000251/2014404)
Dear Mr. Nazar:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements specified by the conditions of your operating license at the Turkey Point Nuclear Plant Units 3 &
4, on May 19 - 23, 2014. The inspection team will be led by Mr. Rodney Fanner, Reactor Inspector, of the NRC RII office. The team will be composed of personnel from the NRC RII office and personnel from the NRC office of Nuclear Security and Incident Response (NSIR).
The inspection will be conducted in accordance with Temporary Instruction (TI) 2201/004, "Inspection of Implementation of Interim Cyber Security Milestones 1-7." The TI inspection will be performed to evaluate and verify your ability to meet the interim milestone requirements of the NRC's Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54, "Protection of Digital Computer and Communication Systems and Networks." During a telephone conversation on January 13, 2014, Mr. Fanner confirmed with Mr. P. Czaya of your staff, arrangements for an information-gathering site visit and a one-week onsite inspection. The schedule is as follows: * Information gathering visit: April 29 - May 1, 2014 * Onsite inspection: May 19 - 23, 2014 The purpose of the information gathering visit is to: (1) obtain information and documentation needed to support the TI inspection; (2) become familiar with the Turkey Point Nuclear Power Plant Cyber Security Program and plant layout; and (3) arrange administrative details, such as office space, availability of knowledgeable office personnel and to ensure unescorted site access privileges.
In order to assure a productive TI inspection, we have enclosed a request for documents needed to ensure the inspectors are adequately prepared. These documents have been divided into three groups (I, II, & III). Group I lists information necessary to aid the inspectors in planning for the TI inspection prior to the information gathering visit. It is requested that this information be provided to the lead inspector via mail no later than April 18, 2014. Group II lists information and possible areas for discussion necessary to assist the inspectors during the TI inspection. It is requested this information be available during the information gathering visit April 29, 2014. Group III consists of those items that the inspectors will review, or need access to, during the TI inspection. Group III also lists the information necessary to aid the inspectors in tracking questions and answers identified as a result of the TI inspection. It is requested that this information be provided to the lead inspector as the information is generated during the TI inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the TI inspection.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
Your cooperation and support during this inspection will be appreciated. If you have questions concerning this inspection, or the inspection team's information or logistical needs, please contact Mr. Fanner at (404) 997-4638, or me at (404) 997-4521. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Sincerely,/RA/ Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41
Enclosure:
Document Request For Cyber Security Temporary Instruction (TI) 2201/004 Interim Milestones 1-7 Inspection ( )
cc: (See page 4)