D.C. Cook Nuclear Power Plant, Unit 1, Information Request for a NRC Post-Approval Site Inspection for License Renewal 05000315-14-007
ML14024A476
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 01/23/2014
From: Sheldon S N
NRC/RGN-III/DRS/EB2
To: Weber L
Indiana Michigan Power Co
Caroline Tilton
References
IR-14-007
Download: ML14024A476 (5)


See also: IR 05000315/2014007

Text

January 23, 2014

Mr. Larry Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106

SUBJECT: D. C. COOK NUCLEAR POWER PLANT, UNIT 1 - INFORMATION REQUEST FOR A NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL 05000315/2014007

Dear Mr. Weber:

On April 28, 2014, the U.S. Nuclear Regulatory Commission (NRC) will begin a Post-Approval Site Inspection for License Renewal at D. C. Cook Nuclear Power Plant. This inspection will be performed in accordance with NRC Inspection Procedure (IP) 71003. This inspection will focus on verifying that license conditions added as part of your renewed license and a sample of license renewal commitments have been implemented. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The information request has been divided into two groups: The first group lists information necessary for our initial inspection scoping and in-office preparation activities. During the in-office preparation activities, the team will identify as much as possible the information and activities to be reviewed during the inspection. This information should be provided to the lead inspector by April 11, 2014. The second group includes the additional information required for the team to review selected activities. This information should be available to the team onsite April 28, 2014. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated. The lead inspector for this inspection is Ms. Caroline Tilton. We understand that our licensing contact for this inspection is Richard Wynegar of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at (630) 829-9718 or via e-mail at Caroline.Tilton@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/

Stuart Sheldon, Acting Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-315 License Nos. DPR-58

Enclosure:

Post-Approval Site Inspection License Renewal Request for Information cc w/encl: Distribution via ListServŽ POST-APPROVAL SITE INSPECTION LICENSE RENEWAL REQUEST INFORMATION 1 Enclosure Inspection Report: 05000315/2014007 Inspection Dates: April 28, 2014 - May 16, 2014 Inspection Procedure: Inspection Procedure 71003 "Post-Approval Site Inspection for License Renewal" Lead Inspector: Caroline Tilton, Lead Inspector (630) 829-9718 Caroline.Tilton@nrc.gov I. Information Requested Prior to the On-site Inspection Week on April 11, 2014 The following information is requested by April 11, 2014, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the team leader as soon as possible. (Please provide the information electronically in "pdf" files, Excel, or other searchable formats, preferably on some portable electronic media (e.g., CDROM, DVD, flash drive, etc.). The portable electronic media should be identified by unit, contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to be easily understood by someone who has knowledge of light water reactor technology). 1. Provide a list of your license renewal commitments with an approximate completion status of each. 2. Provide a list of your Aging Management Programs (AMPs), copies of the program basis documents for each, and a listing of the action tracking items for each. 3. For AMPs that are one-time inspection programs, provide a list of completed work order numbers for inspections that have been completed. This may be incorporated with the previous item and should include identification of the inspected component. 4. Provide current management and license renewal organizational charts. 5. Provide electronic copies of Updated Final Safety Analysis Report, Technical Specifications, Technical Specifications Bases, and Technical Requirements Manual. 6. Provide copies of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection.

2 II. Information Requested to be Available When the Inspectors Arrive On-Site on April 28, 2014 1. Documentation demonstrating completion of license renewal commitments completed as of the inspection date. For example, this may be in the form of a binder for each commitment which includes the implementing documentation and references. III. Information Requested to be Provided Throughout the Inspection 1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection. 2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member). If you have questions regarding the information requested, please contact the lead inspector.