Non-Public Security Inspection Plan For South Texas Project Electric Generating Station, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000498/2014402 and 05000499/2014402)
ML14245A444
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/02/2014
From: Haire M S
Region 4 Engineering Branch 1
To: Koehl D L
South Texas
References
IR-2014-402
Download: ML14245A444 (4)


Text

" " September 2, 2014

Mr. Dennis President and CEO/CNO STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483

SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000498/2014402 AND 05000499/2014402)

Dear Mr. Koehl:

On August 12, 2014, the NRC completed its mid-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The results of that review have been transmitted to you separately in publicly available assessment letter. This letter informs you of the NRC's plans for future security-related inspections at your facility. The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2015. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.

While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.

Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety

Docket Nos.: 50-498; 50-499 License Nos.: NPF-76; NPF-80

Enclosure:

Inspection Plan

cc w/enclosure: Mr. M. Chuck Reddix Manager, Security STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483