Power-Operated Valves
From kanterella
Revision as of 09:05, 4 March 2020 by
StriderTol
(
talk
|
contribs
)
(Created page with "{{topic-Nav}}")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation
Jump to search
v
t
e
Topic
<List of ENS (0)>
|
<List of Findings (1)>
|
<List of Inspection (211)>
Region 1
Beaver Valley
(27)
Calvert Cliffs
(26)
FitzPatrick
(22)
Ginna
(28)
Hope Creek
(15)
Limerick
(18)
Millstone
(32)
Nine Mile Point
(37)
Peach Bottom
(20)
Salem
(16)
Seabrook
(17)
Susquehanna
(21)
Crane
(20)
Haddam Neck
(10)
Indian Point
(20)
Maine Yankee
(2)
Oyster Creek
(12)
Pilgrim
(9)
Saxton
(0)
Shippingport
(0)
Shoreham
(1)
Vermont Yankee
(19)
Yankee Rowe
(4)
Zion
(4)
Region 2
Browns Ferry
(33)
Brunswick
(11)
Catawba
(12)
Clinch River
(0)
Farley
(13)
Harris
(14)
Hatch
(17)
Lee
(1)
McGuire
(12)
North Anna
(15)
Oconee
(26)
Robinson
(12)
Saint Lucie
(26)
Sequoyah
(10)
Summer
(15)
Surry
(13)
Turkey Point
(18)
Vogtle
(42)
Watts Bar
(5)
Crystal River
(11)
Parr
(0)
Region 3
Braidwood
(30)
Byron
(38)
Clinton
(14)
Cook
(12)
Davis Besse
(20)
Dresden
(15)
Fermi
(14)
LaSalle
(31)
Monticello
(26)
Palisades
(24)
Perry
(14)
Point Beach
(26)
Prairie Island
(11)
Big Rock Point
(11)
Duane Arnold
(11)
Elk River
(0)
Kewaunee
(5)
La Crosse
(4)
Region 4
Arkansas Nuclear
(19)
Callaway
(23)
Columbia
(16)
Comanche Peak
(19)
Cooper
(24)
Diablo Canyon
(27)
Grand Gulf
(23)
Kemmerer
(0)
Palo Verde
(17)
Quad Cities
(16)
River Bend
(18)
South Texas
(35)
Sundesert
(0)
Victoria
(0)
Waterford
(25)
Wolf Creek
(27)
Fort Calhoun
(4)
Fort Saint Vrain
(1)
Hallam
(0)
Humboldt Bay
(1)
Rancho Seco
(7)
San Onofre
(17)
Trojan
(9)
10 CFR
10 CFR 52 Appendix C, Appendix C to Part 52-Design Certification Rule for the Ap600 Design
10 CFR 52 Appendix D, Appendix D to Part 52-Design Certification Rule for the Ap1000 Design
10 CFR 52 Appendix E, Appendix E to Part 52-Design Certification Rule for the Esbwr Design
All by date
Start date
Site
Title
ML25290A158
17 October 2025
October 21 2025 Reactor Oversight Process (ROP) Public Meeting
ML25268A175
26 September 2025
Hatch
Authorization of Alternative Request RR-V-4 - Sixth Inservice Testing Interval
Inspection Manual Change Notice 25-032, Table of Contents for Inspection Manual Change Notice 25-032
24 September 2025
Table of Contents for Inspection Manual Change Notice 25-032
Inspection Manual Change Notice 25-030, Table of Contents for Inspection Manual Change Notice 25-030
22 September 2025
Table of Contents for Inspection Manual Change Notice 25-030
Inspection Manual Change Notice 25-029, Table of Contents for Inspection Manual Change Notice 25-029
3 September 2025
Table of Contents for Inspection Manual Change Notice 25-029
Inspection Manual Change Notice 25-027, Table of Contents for Inspection Manual Change Notice 25-027
6 August 2025
Table of Contents for Inspection Manual Change Notice 25-027
ML25206A061
25 July 2025
2025 OM Symposium NRC Staff Presentation (Scarbrough) Final
Inspection Manual Change Notice 25-025, Table of Contents for Inspection Manual Change Notice 25-025
10 July 2025
Table of Contents for Inspection Manual Change Notice 25-025
Inspection Manual Change Notice 25-023, Table of Contents for Inspection Manual Change Notice 25-023
27 June 2025
Table of Contents for Inspection Manual Change Notice 25-023
Inspection Manual Change Notice 25-022, Table of Contents for Inspection Manual Change Notice 25-022
27 June 2025
Table of Contents for Inspection Manual Change Notice 25-022
... further results
Category
:
Topic
Navigation menu
Personal tools
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
View source
View history
More
Search
Navigation
Main page
Recent changes
Random page
Community
Help
Patreon
Databases
ENS
LER
Findings
Inspections
TSTF
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
Browse properties