Updated Inspection Plan for Three Mile Island Station, Unit 1, with Report 22 (Report 05000289/2017005)
ML17240A015
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/28/2017
From: Kennedy S R
NRC/RGN-I/DRP/PB6
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Kennedy S R
References
IR 2017005
Download: ML17240A015 (5)


Text

August 28, 2017

Mr. Bryan Hanson Senior Vice President, Exelon Generation, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: UPDATED INSPECTION PLAN FOR THREE MILE ISLAND STATION, UNIT 1 (REPORT 05000289/2017005)

Dear Mr. Hanson:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Three Mile Island, Unit 1. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. Please contact me at 610-337-5046 with any questions you have regarding this letter.

Sincerely,/RA/

Silas R. Kennedy, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos. 50-289 License Nos. DPR-50

Enclosure:

Three Mile Island Inspection Plan