IR 05000298/2017005
| ML17242A212 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 08/28/2017 |
| From: | Kozal J W NRC/RGN-IV/DRP |
| To: | Dent J Nebraska Public Power District (NPPD) |
| JASON KOZAL | |
| References | |
| IR 2017005 | |
| Download: ML17242A212 (5) | |
Text
August 28. 2017 Mr. John Dent, Jr. Vice President-Nuclear and CNO Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue P.O. Box 98 Brownville, NE 68321
SUBJECT: UPDATED INSPECTION PLAN FOR COOPER NUCLEAR STATION (REPORT 05000298/2017005)
Dear Mr. Dent:
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Cooper Nuclear Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 817-200-1144 with any questions you have regarding this letter.
Sincerely,/RA/ Jason Kozal, Chief Division of Reactor Projects Docket No. 50-298 License No. DPR-46
Enclosure:
Inspection Plan for Cooper Nuclear Station