ML20009F015

From kanterella
Revision as of 08:45, 28 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 81-062/03L-0
Date released: 01/23/2020 Download: ML20009F015


LER 81-062/03L-0:on 810630,during Normal Operations, Isolation Valve for drywell-to-torus Sys Differential Pressure Instruments Found Closed,Isolating Instruments. Caused by Personnel Error.Valve Position Corrected
ML20009F021
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/15/1981
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009F021 (2)
Forwards LER 81-062/03L-0
ML20009F014
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/15/1981
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009F014 (1)