August 3,2Q12Docket No. 05000171 License No' DPR-12Michael J. PacilioSenior Vice President, Exelon Generation Company, LLCPresident and Chief Nuclear Officer, Exelon Nuclear4300 Winfield Rd.Warrenville, lL 60555
SUBJECT: EXELON GENERATION COMPANY, LLC, PEACH BOTTOM ATOMIC POWERSTATION UNIT 1 - NRC INSPECTION REPORT NO. O5OOO171I2O12OO8
Dear Mr. Pacilio:
on July 24 - 25,2012, the U.s. Nuclear Regulatory*ommission (NRC) conducted an inspectionat the peach Bottom Atomic power Station Unit 1. The inspection examined activities conductedunder your license as they relate to safety and compliance with the Commission's rules andregulaiions, and the condltions of your license. The inspection consisted of observations by theinjpector, interviews with personn-el, and a review of procedures and records. The results of theinspection were discussed with Gary Stathes, Site Vice President, and other members of yourorganization on July 25,2012, at the conclusion of the inspection. The enclosed report presentsth6 results of this inspection. No findings of safety significance were identified.Current NRC regulations and guidance are included on the NRC's website at www'nrc.qov;select Nuclear Materials; Med, Ind, & Academic Uses; then Regulations, Guidance andGommunications. The current Enforcement Policy is included on the NRC's website atwww.nrc.qov; select About NRC, Organizations & Functions; Office of Enforcement;Enfor;ment documents; then Enforcement Policy (Under'Related lnformation'). You mayalso obtain these documents by contacting the Government Printing Office (GPO) toll-free at1-g66-512-1800. The GPO is open from 8:00 a.m, to 5:30 p.m. EST, Monday through Friday(except Federal holidaYs).please contact Laurie Kauffman at (61 O) 337-5323 if you have any questions regarding thismatter.
Sincerely,w->#-Marc S. Ferdas, ChiefDecommissioning BranchDivision of Nuclear Materials Safety
Enclosure:
lnspection Report No. 0500017112012008cc: Distribution via ListServ August 3,2012Docket No. 05000171 License No.Michael J. PacilioSenior Vice President, Exelon Generation Company, LLCPresident and Chief Nuclear Officer. Exelon Nuclear4300 Winfield Rd.Warrenville. lL 60555DPR.12S. Geibel, FSMES. Kennedy, Rl OEDO
SUBJECT: EXELON GENERATION COMPANY, LLC, PEACH BOTTOM ATOMIC POWERSTATION UNIT 1 _ NRC INSPECTION REPORT NO. O5OOO171I2012AO8
Dear Mr. Pacilio:
On July 24 - 25,2012, the U.S. Nuclear Regulatory Commission (NRC) conducted an inspectionat the Peach Bottom Atomic Power Station Unit 1. The inspection examined activitiesconducted under your license as they relate to safety and compliance with the Commission'srules and regulations, and the conditions of your license. The inspection consisted ofobservations by the inspector, interviews with personnel, and a review of procedures andrecords. The results of the inspection were discussed with Gary Stathes, Site Vice President,and other members of your organization on July 25, 2012, at the conclusion of the inspection.The enclosed report presents the results of this inspection. No findings of safety significancewere identified.Current NRC regulations and guidance are included on the NRC's website at www.nrc.qov;select Nuclear Materials; Med, Ind, & Academic Uses; then Regulations, Guidance andCommunications. The current Enforcement Policy is included on the NRC's website atwww.nrc.qov; select About NRC, Organizations & Functions; Office of Enforcement;Enforcement documents; then Enforcement Policy (Under'Related lnformation'). Youmay also obtain these documents by contacting the Government Printing Office (GPO) toll-freeat 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday(except Federal holidays).Please contact Laurie Kauffman at (610) 337-5323 if you have any questions regarding thismatter.
Sincerely,/RNMarc S. Ferdas, ChiefDecommissioning BranchDivision of Nuclear Materials Safety
Enclosure:
Inspection Report No. 050001 7 1l2O120Oacc: Distribution via ListServDistribution Wencl: (via E-mail)W. Dean, RA (RIORAMAIL Resource)D. Lew. DRA (RIORAMAlL Resource)S. lbarrola, DRP L. Kauffman, DNMSE. Miller, DRP B. Watson' FSMED. Roberts, DRP (RIDRPMAIL Resource) S. Hansell, DRP, SRIJ. Clifford, DRP (RlDRPMail Resource)C. Miller, DRS (RlDRSMail Resource)P. Wlson, DRS (RlDRSMail Resource)P. Krohn, DRPS. Mccarver, DRPA. Ziedonis. DRP. RlS. Schmitt. DRP, AA RidsNrrPMPeachBottom ResourceR. Lorson, DNMS RidsNrrDorlLpll-2 ResourceD. Collins, DNMS ROPreports ResourceM. Ferdas, DNMSD. Bearde. DRSDOCUMENT NAME: G:\WordDocs\Current\lnsp LefteALDPR-1 2.20'l2}08.doc SUNST Review Complete: LKauffmanAfter declaring this document "An Official Agency Record' it will be released to the Public.ML't22224186w/ attach/encl "N" = NoTo receive a copy ofthis document, indicetejnlle lelilg-w/o attach/encl "E,' = Copy W attach/encl "N' =OFFICEDNMS/RI I NDNMS/RINAMELKauffman/lakMFerdas/msfDATE08t03t201208103t2012OFFICIAL lnspection No.Docket No.License No.Licensee:Facility:Address:lnspection Dates:Inspector:Approved By:U.S. NUCLEAR REGULATORY COMMISSIONREGION IINSPECTION REPORT0500017112012008050001 71DPR-12Exelon Generation Company, LLC (Exelon)Peach Bottom Atomic Power Station Unit 1 (PB-1)1848 Lay RoadDelta, Pennsylvania 17 31 4-9032July 24 - 25,2012Laurie A. KauffmanHealth PhysicistDecommissioning BranchDivision of Nuclear Materials SafetyMarc S. Ferdas, ChiefDecommissioning BranchDivision of Nuclear Materials SafetyDocument Name: G:\WordDocs\Current\lnsp Report\RDPR-1 2.201 2008'doc EXECUTIVE SUMMARYExelon Generation ComPanY, LLCPeach Bottom Atomic Power Station Unit 1NRC lnspection Report No. 0500017112012008A routine announced safety inspection was conducted on July 24 and 25, 2012, by a Region Iinspector at PB-1. The inspection included a review of operations, management oversight,maintenance, corrective action program implementation, and plant support activities while insafe storage (SAFSTOR) status. The inspection consisted of observations by the inspector,interviews with Exelon personnel, and a review of procedures and records. The NRC's programfor overseeing the safe operation of a shut-down nuclear power reactor is described inlnspection Manual Chapter (lMC) 256l, "Decommissioning Power Reactor Inspection Program."There are currently no ongoing decommissioning activities being conducted at PB-1. Based onthe results of this inspection, no findings of safety significance were identified.lnspection Report No. 050001 7 1 12012008GlWordDocs\Cu rrent\l nsp Report\RDPR- 1 2.20 1 2008.doc REPORT DETAILSBackgroundPB-1 is a high temperature gas-cooled demonstration power reactor that operated fromFebruary 1966 until October 31,1974, and has been permanently shut down and inSAFSTOR since that time. All fuel has been removed from the reactor and shipped to anoffsite facility. The spent fuel pool has been drained and decontaminated, and allradioactive liquids have been removed.The NRC's program for overseeing the safe operation of a shut-down nuclear powerreactor is described in IMC 2561. The inspection consisted of observations by theinspector, interviews with Exelon personnel, and a review of procedures and records.SAFSTOR Performance and Status Reviewlnspection Scope (lnspection Procedures (lPs) 36801, 37801 . 40801. 71801. 62801,83750, 84750,86750)A routine announced safety inspection was conducted on July 24 and 25,2012, at PB-1.The inspector reviewed the SAFSTOR program as outlined in the Updated Final SafetyAnalysis Report (UFSAR), Technical Specifications (TS), and procedure LS-PB-800,"Unit 1 Process Control Program," to assess the adequacy of management oversight ofSAFSTOR responsibilities for the PB-1 facility. Specifically, the inspector reviewed thedecommissioning management and staff organization and Exelon's implementation ofSAFSTOR activities related to safe storage of radioactive material. The inspectordiscussed any design changes or modifications since the previous inspection, reviewedthe fire protection prograrn, and conducted a tour to assess the material condition of theaccessible areas of the PB-1 facility.The inspector verified that Exelon completed semi-annual surveillance test (ST),ST-H-099-960-2, "Unit 1 Exclusion Area Semi-Annual Inspection." The inspectorreviewed the results of surveillance testing conducted on November 18, 2011 andMay 17, 2012 to ensure exclusion area barriers and personnel access doors to thecontainment building, the radioactive waste building, and the spent fuel pool buildingwere being maintained in accordance with TS 2.19.b.1 ; and that water accumulation inthe containment sump was less than TS 2.1.b.9 limits.The inspector reviewed activities and documentation associated with the followingSAFSTOR programs: occupational exposure, radioactive effluent control, and siteradiological environmental monitoring program (REMP). The inspector reviewedradioactive gaseous effluent release permits, the annual REMP report, and the annualeffluent report, which included a summary of the radioactive waste management andtransportation programs.The inspector reviewed the annual Decommissioning Status Report 'for 2011 (datedMarch 23,2012) and the PB-1 Nuclear Oversight Audit Report (dated November 22,2011). The inspector also reviewed corrective action program (CAP) issue reports (lRs)and assignment reports (ARs) associated with PB-1 to determine if issues were beinglnspection Report No. 050001 7 1 12012008GlWordDocs\Current\lnsp Report\RDPR-1 2.2012008.doc b.properly identified and evaluated, and if corrective actions were appropriately prioritizedin the CAP.Observations and FindinqsThe inspector noted that there were no personnel changes within the Exelonorganization related to the SAFSTOR activities and confirmed that the staff effectivelyimplemented SAFSTOR activities. The inspector confirmed that no design changes, orplant modifications were made since the previous inspection and PB-1 required reportingsubmittals were completed in accordance with TS requirements. The inspector verifiedthat the maintenance and surveillance program for systems and components had beenconducted in accordance with the TS requirements and established procedures. Theinspector also confirmed that no dismantlement or decommissioning activities wereperformed since the previous inspection. The annual radiological effluent andradiological environmental monitoring reports demonstrated that all calculated doseswere below regulatory dose criteria of 10 CFR 50, Appendix l.The inspector determined that issues were entered into the CAP, prioritized andevaluated commensurate with their safety significance. Corrective actions wereimplemented to address identified issues, and were being tracked to closure using theCAP.ConclusionsThere are currently no ongoing decommissioning activities being conducted at PB-1.Based on the results of this inspection, no findings of safety significance were identified.Exit Meeting SummaryOn July 25 2012, the inspector presented the inspection results to Gary Stathes, SiteVice President and other members of Exelon's staff. The inspector confirmed thatproprietary information was not provided or examined during the inspection.lnspection Report No. 050001 7 1 12012008G:\WordDocs\Current\lnsp Report\RDPR-1 2.2012008.docc.3.0 PARTIAL LIST OF PERSONS CONTACTEDLicenseeJ. Armstrong, Regufatory Affairs ManagerD. Dullum, Regulatory Affairs EngineerJ. Dunlap, Radiation ProtectionM. Herr, Operations DirectorS. Hess, Nuclear Oversight ManagerD. Hines, Radiation Protection SupervisorD. Hornberger, Chemistry/Radwaste TechnicianM. Kaminski, Nuclear OversightJ. Koester, Fire MarshalT. Moore, Engineering DirectorP. Navim, Plant ManagerR. Reiner, Chemistry/Environmental/Radioactive Waste ManagerE. Schwarz, RadiochemistR. Shortes, Radiation Engineering ManagerG. Stathes, Site Vice PresidentJ. Stenclik, Chemistry ManagerG. Swayne, Enercon Project Manager Chemistry contractorITEMS OPEN. CLOSED. AND DISCUSSEDNoneLIST OF DOCUMENTS REVIEWEDUFSAR, Revision 7.0, April2Q12TS, Amendment 1 1, dated August 27,2003PBAPS Unit 1 Decommissioning Status Report - 2A11, dated March 23,2012Nuclear Oversight Audit Report, NOSA-PEA-1 1-16 (AR01280941 ), dated November 22, 2011LS-PB-800, Rev. 1, "Unit 1 Process Control Program"CY-PB-200-100, Rev. 0, "Entry into Unit 1 During SAFSTOR Decomrnissioning Status"ST-H-099-960-2, "Unit 1 Exclusion Area Semi-Annual lnspection," Revision 18ST-C-O95-805-2, "Liquid Radwaste Discharge"SE-S Earthquake - Procedure, Rev. 18 (PB Units 2 and 3)Fireline - Contractor Report, June 3, 2011RT-0-037-325-2, Rev. 14, "Monthly Inspection of Outside Area Fire Extinguishers," July 1 0,2012RT-0-037-335-2, Rev. 13, "Annual Inspection of Outside Area Fire Extinguishers," May 26, 2012RT-M-378-320-2, Rev 2, "Verification of Fire Hose Hydrostatic Testing," January 30,2012Radiation Work Permits: PB 1-1 1-10002, Rev 1 , 2011 PB-1-12-10002, Rev 0, 2012Assignment Reports (ARs): 1172342;1274137;1280941;1291466;1291575;1291589;1291591: 1291594; 1291596; 1 291602; 1 3001 37; 1303777; 1307487; 1349573; 1350412;1 353392; 13627 45: 1 385686; 1 291624; 1254563; 1 385686; 1 300 1 37; 1 3627 453 lnspection Report No. 0500017112012004G:\WordDocs\Current\lnsp Report\RDPR-1 2.201 2008.doc LIST OF ACRONYMS USEDARCAPExelontMcIPIRNRCPB-1REMPSAFSTORSTTSUFSARAssignment ReportCorrective Action ProgramExelon Generation CompanY, LLCInspection Manual ChapterInspection Procedurelssue ReportN uclear Regulatory CommissionPeach Bottom Atomic Power Station Unit 'tRad iolog ica I Envi ronmenta I Mon itori ng Prog ramSafe StorageSurveillance TestTechnical Specifi cationUpdate Final Safety Analysis Reportlnspection Report No. 050001 7 1 12012008G:\WordDocs\Current\lnsp Report\RDPR-1 2.2012008.doc