IR 05000458-12-010, River Bend, Augmented Inspection Team Follow-Up Inspection Planning Letter
ML12229A511
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/16/2012
From: Vincent Gaddy
NRC/RGN-IV/DRP/RPB-C
To: Olson E W
Entergy Operations
Gaddy V G
References
IR-12-010
Download: ML12229A511 (5)


See also: IR 05000458/2012010

Text

August 16, 2012

Mr. Eric Site Vice President Entergy Operations, Inc. River Bend Station 5485 U.S. Highway 61 St. Francisville, LA 70775

SUBJECT: RIVER BEND STATION - NRC AUGMENTED INSPECTION TEAM FOLLOW-UP INSPECTION PLANNING LETTER, INSPECTION REPORT 05000458/2012010

Dear Mr. Olson:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV staff will conduct an augmented inspection team follow-up inspection at your River Bend Station. The inspection will be comprised of resident inspectors and a regional reactor inspector from the NRC Region IV office. The inspection will be conducted in accordance with Inspection Procedure 93800 and multiple reactor oversight process baseline inspection procedures. The schedule for the inspection is as follows: In-office preparation: September 10 - 14, 2012 Onsite inspection: September 17 - 21, 2012 This inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. Please note that the documents are requested to be provided by September 4, 2012. In addition, we request that appropriate personnel knowledgeable of each of the unresolved items documented in NRC Inspection Report 0500458/2012009 be available to support the inspectors during the onsite inspection week. We have discussed this inspection activity with your staff. If there are any questions about this inspection or the material requested, please contact the team lead, Brian Tindell, at 254-897-1500 or by email at brian.tindell@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control No. 3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control No. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Vincent G. Gaddy, Chief Project Branch C Division of Reactor Projects Docket: 05000458 License: NPF-47

Enclosure:

Augmented Inspection Team Follow-up Inspection Document Request cc w/ encl: Electronic Distribution