-ffi PILGRIM NUCLEAR POWER STATION - NRC EVALUATED EMERGENCYPREPAREDNESS EXERCISE _ INSPECTION REPORT NO.05000293/2012503
Dear Mr. Smith:
On November 9, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed aninspection of the November 7 , 2012, evaluated emergency preparedness exercise at yourPilgrim Nuclear Power Station. The enclosed inspection report documents the inspectionresults, which were discussed on November 9,2012, with Mr. V. Fallacara, Site Director ofEngineering, and other members of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.The inspectors reviewed selected procedures and records, observed activities, and interviewedpersonnelBased on the results of this inspection, no findings were identified.ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure and your response (if any) will be available electronically for public inspection in theNRC Public Document Room or from the Publicly Available Records (PARS) component of theNRC's document system (ADAMS). ADAMS is accessible from the NRC Web site athttp://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Docket No. 50-293License No. DPR-35mitriadis. ChiefDivision of Reactor Safety Mr. Robert G. SmithSite Vice PresidentEntergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station600 Rocky Hill RoadPlymouth, MA 02360-5508
SUBJECT: PILGRIM NUCLEAR POWER STATION - NRC EVALUATED EMERGENCYPREPAREDNESS EXERCISE _ INSPECTION REPORT NO.05000293/2012503
Dear Mr. Smith:
On November 9, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed aninspection of the November 7,2012, evaluated emergency preparedness exercise at yourPilgrim Nuclear Power Station. The enclosed inspection report documents the inspectionresults, which were discussed on November 9, 2012, with Mr. V. Fallacara, Site Director ofEngineering, and other members of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.The inspectors reviewed selected procedures and records, observed activities, and interviewedpersonnel.Based on the results of this inspection, no findings were identified.ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure and your response (if any) will be available electronically for public inspection in theNRC Public Document Room or from the Publicly Available Records (PARS) component of theNRC's document system (ADAMS). ADAMS is accessible from the NRC Web site athttp://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RNAnthony Dimitriadis, ChiefPlant Support Branch 1Division of Reactor SafetYDocket No. 50-293License No. DPR-35DOCUMENT NAME: G:\DRS\Plant Support Branch 1\Barr\EP Ex12 Pilgrim\Pilgrim EP EX 2012 Report.docxADAMS ACCESSION NUMBER: M112355A076V suNslReviewV Non-Sensitiven SensitiveV Publicly Availablen Non-PubliclyAvailableOFFICERI/DRSRI/DRPRI/DRSNAMESBarr/ECB forRBellamy/TCS forADimitriadisDATE12t19t1212t19t1212t19t12OFFICIAL RECORD COPY R. Smith
Enclosure:
NRC lnspection Report No. 05000293/2012503S. Colman, RAC Chair, FEMA Region Icc w/encl: Distribution via ListServ U.S. NUCLEAR REGULATORY COMMISSIONREGION IDocket No.: 50-293License No.: DPR-35Report No.: 05000293/2012503Licensee: Entergy Nuclear Operations, Inc.Facility:Pilgrim Nuclear Power Station (PNPS)Location: 600 Rocky Hill RoadPlymouth, MA 02360Dates: November 5-9.2012Inspectors: S. Barr, Sr. Emergency Preparedness Inspector, DRS, Region l (Lead)T. Jackson, Sr. Health Physicist, DRS, Region ID. Everhart, Physical Security Inspector, DRS, Region IB. Smith, Resident Inspector, DRP, Region IApproved By: Anthony Dimitriadis, ChiefPlant Support Branch 1Division of Reactor SafetyEnclosure SUMMARY OF FINDINGSI R 0500029312012503i 1 1 l 512012-1 1 191201 2; Pilgrim Nuclear Power Station; ExerciseEvaluation ; Emergency Prepared ness Performance I nd icators.This was an announced inspection conducted by three region-based inspectors and oneresident inspector. The NRC's program for overseeing the safe operation of commercialnuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4,dated December 2006.Cornerstone: Emergency PreparednessA. NRC-ldentifiedandSelf-RevealinoFindinqsNo findings were identified.B. Licensee-ldentified FindinqsNone.Enclosure REPORT DETAILS1. REACTORSAFETYCornerstone: Emergency Preparedness (EP)1EP1 Exercise Evaluation (71114.01- 1 Sample)a. Inspection ScopePrior to the November 7,2012, emergency preparedness exercise, the NRC inspectorsconducted an in-office review of the exercise objectives and scenario, which Entergy hadsubmitted to the NRC, to determine if the exercise would test major elements of thePilgrim Nuclear Power Station (PNPS) emergency plan as required by Title 10 of theCode of Federal Regulations (10 CFR) 50.47(b)(14). This overall exercise inspectionactivity represented the completion of one sample on a biennial cycle.The exercise evaluation consisted of the following review and assessment:. The adequacy of Entergy's performance in the biennial full-participation exerciseregarding the implementation of the risk-significant planning standards (RSPS)described in 10 CFR 50.47(bX4), (5), (9), and (10), which are: emergencyclassification; offsite notification; radiological assessment; and, protective actionrecommendations, respectively.. The overall adequacy of Entergy's Pilgrim emergency response facilities with regardto NUREG-0696, "Functional Criteria for Emergency Response Facilities," andEmergency Plan commitments. The facilities assessed were the Control RoomSimulator, Technical Support Center (TSC), and Emergency Operations Facility(EOF).o A review of other performance areas, such as: the emergency responseorganization's (ERO's) recognition of abnormal plant conditions; command andcontrol; intra- and inter-facility communications; prioritization of mitigating activities;utilization of repair and field monitoring teams; interface with offsite agencies;staffing and procedure adequacy; and, the overall implementation of the emergencyplan and its implementing procedures.o fi review of past performance issues from the last NRC PNPS exercise inspectionreport and Entergy's Pilgrim EP drill reports, to determine the effectiveness oflicensee corrective actions as demonstrated during the November 7 , 2012, exerciseand to ensure compliance with 10 CFR 50.47(bX14).Enclosure 2. The licensee's posfexercise critiques, to evaluate Entergy's self-assessment of thePilgrim ERO performance during the November 7,2012, exercise and to ensurecompliance with 10 CFR 50, Appendix E, Section lV.F.2.g.The inspectors reviewed the documents listed in the attachment to this report.b. FindinqsNo findings were identified.4. OTHER ACTTVITTES (OA)4OA1 Performance Indicator (Pl) Verification (71151- 3 Samples)a. Inspection ScopeThe inspectors reviewed data for the Pilgrim EP Pls, which are: (1) Drill and ExercisePerformance (DEP); (2) Emergency Response Organization (ERO) Drill Participation;and, (3) Alert and Notification System (ANS) Reliability. The last EP inspection atPilgrim was conducted in the third calendar quarter of 2011, so the inspectors reviewedsupporting documentation from EP drills and tests from the third and fourth calendarquarters of 2Q11, and the first, second and third calendar quarters of 2012, to verify theaccuracy of the reported Pl data. The review of these Pls was conducted in accordancewith NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI99-02, "Regulatory Assessment Performance Indicator Guidelines," Revision 6.This inspection activity represented the completion of three samples.b. FindinqsNo findings were identified.4OAO Meetinqs. includinq ExitOn November 9, 2012, the inspectors presented the results of this inspection toMr. V. Fallacara, the PNPS Director of Engineering, and other members of the Entergystaff. No proprietary information was provided to the inspectors during this inspection.Enclosure A-1ATTACHMENTSUPPLEM ENTAL I N FORMATIONKEY POINTS OF CONTACTLicensee PersonnelV. Fallacara, Director, EngineeringT. White, Manager, Emergency PreparednessLIST OF ITEMS OPENED, CLOSED, AND DISCUSSEDNoneLIST OF DOCUMENTS REVIEWEDSection 1EP1: Exercise EvaluationEP-PP-O1, Pilgdm Nuclear Power Station Emergency Plan (Revision 37)PNPS Emergency Plan lmplementing ProceduresPNPS Emergency Plan Administrative ProceduresPNPS November 7,2012, Emergency Exercise Scenario PackagePNPS Emergency Preparedness Drill Reports, January 2011 - October 2012November 7,2012, NRC EP Evaluated Exercise Report 12-05, describing allCondition Reports from the exerciseSection 4OA1 : Performance lndicator VerificationEN-EP-2O1, Performance Indicators (Revision 12)EN-Ll-114, Performance Indicator Process (Revision 6)DEP Pl data, July 2011 - September 2012ERO Drill Participation Pl data, July 2011 - September 2012ANS Reliability Pl data, July 2011 - September 2012Enclosure A-2LIST OF ACRONYMSADAMS Agencywide Documents Access Management and SystemsANS Alert Notification SystemDEP Drill and Exercise PerformanceCFR Code of Federal RegulationsEAL Emergency Action LevelEOF Emergency Operations FacilityEP Emergency PreparednessERO Emergency Response OrganizationNRC Nuclear Regulatory CommissionPARS Publicly Available RecordsPl Performance IndicatorPNPS Pilgrim Nuclear Power StationRSPS Risk Significant Planning StandardTSC Technical Support CenterEnclosure