Mr. Michael UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406*1415 November 2, 2010 Senior Vice President, Exelon Generating Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd Warrenville, IL 60555
SUBJECT: OYSTER CREEK GENERATING STATION -NRC INTEGRATED INSPECTION REPORT 05000219/2010004
Dear Mr. Pacilio:
On September 30,2010, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Oyster Creek Generating Station. The enclosed integrated inspection report documents the inspection findings, which were discussed on October 19, 2010, with Mr. M. Massaro, Oyster Creek Generating Station Site Vice President, and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.govlreading-rm/adams.html(the Public Electronic Reading Room). We appreciate your cooperation. Please contact me at (610) 337-5200 if you have any questions regarding this letter. Docket No. License No.
Enclosure:
50-219 DPR-16
Sincerely,Projects Branch 6 Division of Reactor Projects Inspection Report 05000219/2010004
w/Attachment:
Supplemental Information cc: Distribution via ListServ
SUMMARY OF FINDINGS
REPORT DETAILS
1.
1R01 1R04 1R05 1R06 1R11 1R12 1R13 1R15
REACTOR SAFETY
Adverse Weather Protection Equipment Alignment Fire Protection Flood Protection Measures Licensed Operator Requalification Program Maintenance Effectiveness Maintenance Risk Assessments and Emergent Work Control Operability Evaluations 4 5 6 6 6 7 7 8 8 9 9 1 R 18 Plant Modifications 10 1 R19 Post-Maintenance Testing 11 1 R22 Surveillance Testing 11 1 EP2 Alert and Notification System (ANS) Evaluation 12 1EP3 Emergency Response Organization (ERO) Staffing and Augmentation System 12 1EP4 Emergency Action Level (EAL) and Emergency Plan Changes 1 EP5 Correction of Emergency Preparedness Weaknesses
OTHER ACTIVITIES
lOA] 40A 1 Performance Indicator Verification 40A2 Identification and Resolution of Problems 40A3 Event Followup 40A6 Meetings, Including Exit 40A7 Licensee-Identified Violations Enclosure 12 13 13 13 14 14 14 15 3 ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
LIST OF DOCUMENTS REVIEWED
LIST OF ACRONYMS
Enclosure 15 A-1 A-1 A-1 A-1 A-9
- OF [[]]
- FINDIN [[]]
- GS [[]]
- LLC , Oyster Creek Generating Station; Integrated report. The report covered a 3-month period of inspection by resident inspectors, and an emergency preparedness inspector. No findings were identified. Enclosure
- REPORT [[]]
- DETAIL [[S Summary of Plant Status The Oyster Creek Generating Station (Oyster Creek) began the inspection period operating at 100% (full power). On twenty-four occasions during the summer months operators performed unplanned power reductions of less than or equal to 20% power in accordance with operating procedures to maintain Oyster Creek's circulating water discharge temperatures below the environmental discharge permit requirements or to perform condenser backwash procedures to address degrading condenser vacuum conditions. These power reductions were of short duration and the plant returned to 100% power in each instance. On four occasions during the summer months operators performed unplanned power reductions of greater than 20% power in accordance with operating procedures to maintain Oyster Creek's circulating water discharge temperatures below the environmental discharge permit requirements or to perform condenser backwash procedures to address degrading condenser vacuum conditions. These power reductions were of short duration and the plant returned to 100% power in each instance. On August 1, operators performed a planned power reduction to 80% power to perform a rod pattern adjustment. The plant returned to full power later that day. On August 10, operators performed an unplanned power reduction to 80% power to maintain the plant's circulating water discharge temperatures below Oyster Creek's environmental discharge permit requirements due to a trip of the #1 dilution pump. The plant returned to 100% power on August 10, following the start of the standby dilution pump. On September 3, operators performed a planned power reduction to 80% power to perform a rod pattern adjustment and turbine valve testing. The plant returned to full power on September 4. On September 13, operators performed a planned power reduction to 61% power to perform troubleshooting for a ground indication on the]]
- 125VDC , "A" non-safety related bus. The reason for the power reduction was for As Low as Reasonably Achievable (
- ALARA [[) occupational dose considerations when conducting troubleshooting in the condenser bay, which is a high radiation area during plant operations. The plant returned to full power on September 14. On September 16, operators performed a planned power reduction to 64% power to perform repairs on grounds identified on the]]
ALARA occupational dose considerations when conducting repairs in the condenser bay, which is a high radiation area during plant operations. The plant returned to full power on September 17. Oyster Creek operated at full power for the remainder of the inspection period. Enclosure
1.
- SAFETY "Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity 1 R01 Adverse Weather Protection ([[Inspection procedure" contains a listed "[" character as part of the property label and has therefore been classified as invalid.) a. Inspection Scope (2 samples) The inspectors performed two site specific weather-related condition inspections. The inspectors reviewed Exelon's preparations for Hurricane Earl from August 31 through September 2. The inspectors performed walkdowns of areas that could be potentially impacted by the weather conditions, such as the intake structure, diesel structure, and transformers, and verified that station personnel secured loose materials staged for outside work prior to the forecast high winds. The inspectors verified that Exelon monitored the approach of the storm according to applicable procedures and took appropriate actions as required. The inspectors reviewed Exelon's response to the declaration of a tornado watch on September 28. The inspectors verified that Exelon monitored the approach of the storm according to applicable procedures and took appropriate actions as required. Documents reviewed for this inspection activity are listed in the Supplemental Information attachment to this report. b. Findings No findings of significance were identified. 1 R04 Equipment Alignment (71111.04) a. Inspection Scope (3 samples) The inspectors performed three partial equipment alignment inspections. The partial equipment alignment inspections were completed during conditions when the equipment was of increased safety significance such as would occur when redundant equipment was unavailable during maintenance or adverse conditions, or after equipment was recently returned to service after maintenance. The inspectors performed a partial walkdown of the following systems, and when applicable, the associated electrical distribution components and control room panels, to verify the equipment was aligned to perform its intended safety functions: * Containment spray system 2 with containment spray system 1 unavailable for surveillance testing on July 7; * #1 Emergency Diesel Generator (EDG) with #2]]
IC) while 'A' IC unavailable for surveillances on September 27. Enclosure
Documents reviewed for this inspection activity are listed in the Supplemental Information attachment to this report. b. Findings No findings of significance were identified.
- 1 ROS [[Fire Protection (71111.05) a. Inspection Scope (71111.05A 1 sample; 71111.050 6 samples) The inspectors observed one plant fire drill and performed a walkdown of six plant areas to assess their vulnerability to fire. The inspectors observed an unannounced fire drill on September 29 to assess the readiness of Exelon's fire brigade to respond to fires within the plant. The drill scenario involved a simulated fire in the 'C' safety related battery room. The inspectors attended Exelon's drill critique to evaluate its adequacy in assessing personnel performance in responding to the postulated fire. During plant walkdowns, the inspectors observed combustible material control, fire detection and suppression equipment availability, visible fire barrier configuration, and the adequacy of compensatory measures (when applicable). The inspectors reviewed "Oyster Creek Fire Hazards Analysis Report" and "Oyster Creek Pre-Fire Plans" for risk insights and design features credited in these areas. Additionally, the inspectors reviewed corrective action program condition reports documenting fire protection deficiencies to verify that identified problems were being evaluated and corrected. Documents reviewed for this inspection activity are listed in the Supplemental Information attachment to this report. The following plant areas were inspected: *]]
FZ-11D, "Turbine Building Basement South End" on September 17. b. Findings No findings of significance were identified. 1 R06 Flood Protection Measures (71111.06) a. Inspection Scope (2 samples) The inspectors performed one internal flood protection inspection activity and one internal flood protection inspection activity associated with bunkers and manholes. The inspectors performed an internal flood protection inspection activity in the northeast corner room of the reactor building which contains the containment spray system 1 pumps and heat exchangers. The inspectors performed a walkdown of the flood Enclosure
barriers, floor drains, and floor sumps. The inspectors evaluated these items to determine if internal flood vulnerabilities existed and to assess the physical condition of the equipment and components in the northeast corner room. The inspectors reviewed preventative maintenance activities associated with flood protection equipment. The inspectors also reviewed Exelon's procedures related to flooding of the northeast corner room. The inspectors performed an internal flood protection inspection associated with bunkers and manholes. Inspections of the startup transformer cable vault and four station blackout cable vaults were performed as they are subject to flooding and contained significant cables. The inspectors performed walkdowns of these vaults to verify found water levels in the vaults and reviewed Exelon's photographs and documentation to verify the physical condition of the cables and cable supports. The inspectors also reviewed Exelon's actions to monitor cable degradation and actions to minimize water accumulation and submergence of medium voltage cables contained in these areas. Documents associated with these reviews are listed in the Supplemental Information attachment to this report. b. Findings No findings of significance were identified. 1 R11 Licensed Operator Requalification Program (71111.11) a. Inspection Scope (1 sample) The inspectors observed one simulator training scenario to assess operator performance and training effectiveness on September 1. The inspectors observed training scenario "2612.CREW.1 0-5.01 ". The inspectors assessed whether the simulator adequately reflected the expected plant response, operator performance met Exelon's procedural requirements, and the simulator instructor's critique identified crew performance problems. Documents reviewed for this inspection activity are listed in the Supplemental Information attachment to this report. b. Findings No findings of significance were identified. 1R12 Maintenance Effectiveness (71111.12) a. Inspection Scope (2 samples) The inspectors performed two maintenance effectiveness inspection activities. The inspectors reviewed the following degraded equipment issues in order to assess the effectiveness of maintenance by Exelon: * Control Room/Cable spreading room
IR 759293) on August 6: and * Drywell equipment drain tank (IR 1110290) on September 9. Enclosure
The inspectors also verified that the systems or components were being monitored in accordance with Exelon's maintenance rule program requirements. The inspectors compared documented functional failure determinations and unavailable hours to those being tracked by Exelon. The inspectors reviewed completed maintenance work orders and procedures to determine if inadequate maintenance contributed to equipment performance issues. The inspectors also reviewed applicable work orders, corrective action program condition reports, operator narrative logs, and vendor manuals. Documents reviewed for this inspection activity are listed in the Supplemental I nformation attachment to this report. b. Findings No findings of significance were identified. 1 R13 Maintenance Risk Assessments and Emergent Work Control (71111.13) a. Inspection Scope (5 samples) The inspectors reviewed five on-line risk management evaluations through direct observation and document reviews for the following plant configurations: * Risk evaluation on core spray system check valves due to missed surveillances on August 26; * #2 emergency diesel generator inoperable due to an overspeed trip on August 9; * Master automatic recirculation speed control unavailable due to unplanned maintenance on August 19; . * Core spray system #2 unavailable due to planned maintenance and receipt of spurious half-scrams on reactor protection system #2 on August 23; and * Declaration of tornado watch with 0-1029 offsite power line unavailable for Jersey Central Power and Light (JCPL) planned maintenance on September 28. The inspectors reviewed the applicable risk evaluations, work schedules, and control room logs for these configurations to verify the risk was assessed correctly and reassessed for emergent conditions in accordance with Exelon's procedures. Exelon's actions to manage risk from maintenance and testing were reviewed during shift turnover meetings, control room tours, and plant walkdowns. The inspectors also used Exelon's on-line risk monitor (Paragon) to gain insights into the risk associated with these plant configurations. Additionally, the inspectors reviewed corrective action program condition reports documenting problems associated with risk assessments and emergent work evaluations. Documents reviewed for this ins'pection activity are listed in the Supplemental Information attachment to this report. b. Findings No findings of significance were identified. 1 R15 Operability Evaluations (71111.15) a. Inspection Scope (4 samples) The inspectors reviewed four operability evaluations for degraded or non-conforming conditions associated with: Enclosure
- Water in the turbine building radioactive gaseous environmental monitoring system (RAG
- IR 1091519); * Average power range monitor (APRM) #1 did not insert half-scram during surveillance testing on August 7 (IR 1099066); * #1
- IR [[1078312); and * Core spray system check valves past surveillance dates on August 13 (lR 1097964). The inspectors reviewed the technical adequacy of the operability evaluations to ensure the conclusions were technically justified: The inspectors also walked down accessible portions of equipment to corroborate the adequacy of Exelon's operability evaluations. Documents reviewed for this inspection activity are listed in the Supplemental Information attachment to this report. b. Findings Introduction. The inspectors identified an unresolved item (URI) to review Exelon's equipment apparent cause evaluation (EACE) for the #1]]
- EDG cooling fan shaft block bearing failure to determine whether a performance deficiency exists that was within Exelon's ability to foresee and prevent. The inspectors will review Exelon's
- EACE when it is complete, which had not occurred by the end of this inspection period. Description. During the routine overhaul and inspection of the #1
- EDG [[on June 8, maintenance personnel noticed damage to the cooling fan shaft pillow-block bearing. Exelon removed the bearing for further analysis by an offsite lab and replaced the bearing and shaft with new components on June 9. Exelon entered this issue into their corrective action program as]]
- EACE to review the offsite lab report to determine the cause of the failure and any additional corrective actions. (URI 05000219/2010004-01:
- EDG [[Pillow-Block Bearing) 1 R18 Plant Modifications (71111.18) a. Inspection Scope (1 temporary modification sample) The inspectors reviewed one temporary plant modification that was implemented by Exelon personnel at Oyster Creek. The inspectors reviewed the following modification: * Temporary configuration change package (]]
TCCP) to lift lead to lock in electromatic relief valve (EMRV) open alarm (ECR 10-00284) on August 17. The inspectors reviewed the engineering/procedure change packages, design basis, and licensing basis documents associated with each of the modifications to ensure that the systems associated with each of the modifications would not be adversely impacted by the change. The inspectors walked down portions of the systems associated with the modification when applicable and prudent. The inspectors reviewed the modifications to ensure they were performed in accordance with Exelon's modification process. The inspectors also ensured that revisions to licensing/design basis documents and operating procedures were properly revised to support implementation of the modification. The inspectors also reviewed Exelon's 10 CFR 50.59 screening for this modification. Documents reviewed for this inspection activity are listed in the Supplemental Information attachment to this report. Enclosure
b. Findings No findings of significance were identified. 1 R19 Post-Maintenance Testing (71111.19) a. Inspection Scope (7 samples) The inspectors observed portions of and/or reviewed the results of seven maintenance tests for the following equipment: * V-21-17 stem lubrication and packing retorque on July 7 (R2126779); * Standby gas treatment system #2 filter replacement on August 2 (C2023814); * Replacement of #2
- EDG overspeed trip switch on August 8 (C2024062); * V-28-23 replacement on August 19 (R2119622); * Core spray system 2 relay replacement and oil change on August 25 (R2163871); * V-14-30 stem lubrication and packing retorque on September 29 (R2142502); * 'E'
- EMRV [[pressure switch replacement on September 24 (R2119341). The inspectors verified that the post-maintenance tests conducted were adequate for the scope of the maintenance performed and that they ensured component functional capability. Documents reviewed for this inspection activity are listed in the Supplemental Information attachment to this report. b. Findings No findings of significance were identified. 1 R22 Surveillance Testing (71111.22) a. Inspection Scope (2 In-service test (1ST) samples and 2 routine surveillance samples) The inspectors observed portions of and/or reviewed the results of four surveiliance/lST tests: * Reactor building to suppression chamber self actuating vacuum breaker surveillance test and]]
ST and containment spray pump trip surveillance on July 7; * Reactor coolant system (RCS) leak detection surveillance on July 15; and * Automatic scram contactor surveillance on August 30. The inspectors verified that test data was complete and met procedural requirements to demonstrate that the systems and components were capable of performing their intended function. The inspectors also reviewed corrective action program condition reports that documented deficiencies identified during these surveillance tests. Documents reviewed for this inspection activity are listed in the Supplemental Information attachment to this report. Enclosure
b. Findings No findings of significance were identified. Cornerstone: Emergency Preparedness [EP]
- ANS [[) Evaluation a. Inspection Scope (71114.02 -1 Sample) The inspectors conducted an onsite review to assess the maintenance and testing of the Oyster Creek alert and notification system (ANS). During the inspection, the inspectors reviewed the Federal Emergency Management Agency (FEMA) design report to ensure Exelon's compliance with design report commitments, the system maintenance and test records, and applicable]]
- 10 CFR 50 Appendix E, were used as reference criteria . . b. Findings No findings were identified. 1
- EP [[3 Emergency Response Organization (ERa) Staffing and Augmentation System a. Inspection Scope (71114.03 -1 Sample) The inspectors reviewed Oyster Creek's emergency response organization (ERa) augmentation staffing requirements, training program, and the process for notifying and augmenting the]]
- ER a. This was performed to ensure the readiness of key licensee staff to respond to an emergency event and to ensure Exelon's ability to activate their emergency facilities in a timely manner. The inspectors reviewed Oyster Creek's
- ER a duty roster, sampling of training records, call-in reports, applicable procedures, and condition reports (CR) related to the
- EP 4 Emergency Action Level lEAl) and Emergency Plan Changes a. Inspection Scope (71114.04 -1 Sample) Since the last
- 10 CFR [[50.54(q), any change made to the plan, and its lower-tier implementing procedures, had not resulted in any decrease in effectiveness of the emergency plan, and that the revised emergency plan continued to meet the standards in 50.47(b) and the reqUirements of 10]]
CFR 50 Appendix E. Enclosure
The inspectors reviewed all
- EAL changes and a sample of emergency plan changes to evaluate any potential decreases in effectiveness of the emergency plan. However, this review by the inspectors was not documented in an
- EP 5 Correction of Emergency Preparedness Weaknesses a. Inspection Scope (71114.05 -1 Sample) The inspectors reviewed Exelon's Corrective Action Program (CAP) procedure for evaluating their
- EP program and performance. The inspectors reviewed a sampling of drill reports, self assessment reports, 10
- CR s from drills and audits. The inspectors assessed Exelon's response to and documentation of two actual declarations of Unusual Events which occurred on February 1, 2009 and July 12,2009. The planning standards contained in
- OTHER [[]]
- ACTIVI [[TIES lOA] 40A1 Performance Indicator Verification (71151) a. Inspection Scope (5 Samples) The inspectors reviewed performance indicator (PI) data associated with five Pis. The inspectors used the guidance provided in Nuclear Energy Institute (NEI) 99-02, Revision 6, "Regulatory Assessment Performance Indicator Guideline" to assess the accuracy and completeness of the]]
- PI [[data reported by Exelon between July 1, 2009 and June 30, 2010. Documents reviewed for this inspection activity are listed in the Supplemental Information attachment to this report. . The inspectors reviewed the following Pis: * Drill and exercise performance (]]
DEP); * Emergency Response Organization (ERO) drill participation; * Alert and notification system (ANS); * Reactor coolant system activity (RCSA); and * Reactor coolant system identified leak rate (RCSL). b. Findings No findings of significance were identified. Enclosure
40A2 Identification and Resolution of Problems (71152) .1 Review of Items Entered Into the Corrective Action Program The inspectors performed a daily screening of items entered into Exelon's corrective action program to identify repetitive equipment failures or specific human performance issues for follOW-Up. This was accomplished by reviewing hard copies of each condition report, attending daily screening meetings, or accessing Exelon's computerized database. Assessment and Observations No findings of significance were identified. 40A3 Event Followup (71153) (1 sample) The inspectors performed one event follow-up inspection activity. Documents reviewed for this inspection activity are listed in the Supplemental Information attached to this report . . 1 Drywell Unidentified Leak Rate Increase a. Inspection Scope On September 7, operators noted that drywell unidentified leak rate (UILR) rose to a peak of 2.63 gpm from its prior value, which had been trending from 0.92 to 1.02 gpm. Exelon determined that the problem was a result of a failed open valve in the drywell equipment drain tank recirculation line and installed a temporary modification (ECR 10-00530) to correct the problem. The
- UILR [[subsequently returned to its previous values. The inspectors verified that operations personnel responded in accordance with procedures and equipment responded as intended by reviewing the completed procedures, control room narrative logs, corrective action program condition reports, and through interviews of operations personnel. The inspectors also reviewed technical specification requirements to ensure that Oyster Creek was operated in accordance with its operating license. The inspectors performed a walkdown of the main control room panels and indications to verify equipment status and plant parameters. The]]
UILR increase is described and evaluated in corrective action program condition report IR 1110290. b. Findings No findings of significance were identified. 40A6 Meetings, Including Exit Resident Inspector Exit Meeting. On October 19, the inspectors presented their overall findings to members of Exelon's management led by Mr. M. Massaro, (Site Vice President), and other members of his staff who acknowledged the findings. The inspectors confirmed that proprietary information was not retained at the conclusion of the inspection period. Enclosure
Commissioner Site Visit. On August 31, a site visit was conducted by Mr. William Magwood, Commissioner for the Nuclear Regulatory Commission and Mr. Martin Virgilio, Deputy Executive Director for Operations. During Mr. Magwood's visit, he toured the plant and met with Exelon managers. Mr. Marc Dapas, Acting Regional Administrator (RA) for the
- NRC Region 1 office, accompanied Mr. Magwood on his visit. 40A7 Licensee-Identified Violations None.
- SUPPLE [[]]
- MENTAL [[]]
- INFORM [[]]
- SUPPLE [[]]
- MENTAL [[]]
- INFORM [[]]
- KEY [[]]
- POINTS [[]]
- OF [[]]
- CONTAC [[T D. Dicello, Director, Work Management J. Dostal, Director, Operations A. Farenga, Emergency Preparedness Manager R. Peak, Director, Engineering R. Reiner, Director, Training P. Colgan, Director, Maintenance J. Barstow, Manager, Regulatory Assurance T. Keenan, Manager, Security R. Wiebenga, Senior Manager, System Engineering H. Ray, Senior Manager, Design Engineering M. McKenna, Shift Operations Superintendent D. Peiffer, Manager, Nuclear Oversight J. Kerr, Manager, Corrective Action Program M. Ford, Manager, Environmental/Chemistry Manager J. Renda, Manager, Radiation Protection K. Barnes, Regulatory Assurance Specialist Others: State of New Jersey, Bureau of Nuclear Engineering]]
- LIST [[]]
- OF [[]]
- ITEMS [[]]
- AND [[]]
- URI [[]]
- LIST [[]]
- OF [[]]
- DOCUME [[]]
- NTS [[]]
- REVIEW [[]]
- ED In addition to the documents identified in the body of this report, the inspectors reviewed the following documents and records. Section 1 R01: Adverse Weather Protection Procedures
ABN-31, "High Winds" Attachment
Condition Reports (IR) 1118951 Section 1R04: Equipment Alignment Procedures 310, "Containment Spray System Operation" 307, "Isolation Condenser System" A-2 609.3.002, "Isolation Condenser Isolation Test and Calibration -A1/B1 Sensors First" Drawings
- FZ -11 B, Oyster Creek Generating Station Pre-Fire Plan, "Turbine Building Basement/Mezzanine (0'-0" Elevation) North End (27' 0" Elevation)"
- FZ -11 D, Oyster Creek Generating Station Pre-Fire Plan, "Basement Floor South End (3' 6" Elevation)
- FA -26, Oyster Creek Generating Station Pre-Fire Plan, '''C' Battery Room" Fire Drill Scenario, "C Battery Room Fire", dated September 29,2010 Section 1 R06: Flood Protection Measures Procedures
- AA -723-500, "Inspection of Non-EQ Cables and Connections for Managing Adverse Localized Environments" 117.3, "Alternate
- GU 3D-153-07, 001, General Arrangement Floor and Equipment Drains -Reactor Building Condition Reports
OR) 852474 828327 828338 890453 373114 1086111 1066334 1076306 1113908 330592 Work Orders (AR) R2095953 R2139427 R2162105 R2103165 A2193092 A2193908 A2193907 A2187171 A2073455 R2116819 R213.9427 R2146232 R2157294 R2153284 Attachment
Other Documents Oyster Creek Nuclear Generating Station
- RB -FZ-1 F4, Oyster Creek Generating Station Pre-Fire Plan, "NE Comer Room" Design and Licensing Basis for Flooding at
- TDR 779, "Evaluation of Possible Internal Flooding of Oyster Creek Nuclear Generating Station Power Plant Buildings" C-1302-822-E61 0-076, "Flooding due to
- HELB s Outside Containment" Oyster Creek Generating Station License Renewal Application Section B.1.36, "Inaccessible Medium-voltage Cables not subject to 10
- NRC Generic Letter 2007-01, "Inaccessible or Underground Power Cable Failures that Disable Accident Mitigation Systems or Cause Plant Transients"", dated May 7, 2007 Exelon Letter, "Exelon Generation Company,
- NRC Generic Letter 2007-01, "Inaccessible or Underground Power Cable Failures that Disable Accident Mitigation Systems or Cause Plant Transients"", dated December 7, 2007 Report # 2009-09, "Cable System Assessment Provided for Exelon Oyster Creek Nuclear Generating Station, Forked River,
- NJ , February 24-March 5, 2009" System Engineer Spreadsheet of Cablewise Testing Results, updated for 2010 Oyster Creek Nuclear Generating Station
- USNRC Letter, "Safety Evaluation -Station Blackout Analysis Oyster Creek Nuclear Generating Station (TAC
- USNRC Letter, "Supplemental Safety Evaluation (SSE) -Oyster Creek Nuclear Generating Station Blackout Rule (TAC
- USNRC Regulatory Guide 1.155, "Station Blackout" Section 1 R11: Licensed Operator Requalification Program Other Documents
- LS [[]]
AB-331-1006, "BWR Reactor Coolant System Leakage Monitoring and Action Plan" Drawings JC 147434, "Sump and Waste Collection System" Attachment
Condition Reports (IR) 744793 749568 967366 1008461 1110762 Work Orders (AR) 754608 1055518 A-4 790158 1080887 804233 1098953 940266 1110290 A0700924 A0705758 C0528074 C2002414 C2019099 C2024198 R0800924 Other Documents
- NEI 93-01, "Industry Guideline for monitoring the Effectiveness of Maintenance at Nuclear Power Plants" Oyster Creek Generating Station Technical Specification 3.3.0, "Reactor Coolant System Leakage"
- AR ) C2024102 Other Documents 1093256 Oyster Creek Generating Station Technical Specification Section 4, "Surveillance Requirement Applicability"
- SURV -01, "Risk Analysis for Missed Surveillance, Failure to Open and Inspect Core Spray Main Pump Discharge Check Valves" Section 1R15: Operability Evaluations Procedures
RAGEMS II, Turbine Building" Attachment
Condition Reports (lR) 1093256 1056730 1097964 1091519 1099444 658467 814754 1099066 1100447 1093120 1099180 1089395 1103610 1078312 370560 1081766 1078411 Work Orders (AR) A2256877 R2165933 A2255578 C2023739 R2017655 R2085970 R2125850 A2089090 R2096800 R2113198 Other Documents
- NRC Inspection Manual -Part 9900 Technical Guidance, "Operability Determinations & Functionality Assessments for Resolution of Degraded or Nonconforming Conditions Adverse to Quality or Safety"
- NRC Letter, "Safety Evaluation of the Inservice Testing Program Relief Requests for Pumps and Valves, Oyster Creek Nuclear Generating Station", dated September 24,
- ST ) Program Relief Requests for Pumps and Valves, Oyster Creek Nuclear Generating Station", dated August 14,
- 1993 GL 89-04, "Guidance on Developing Acceptable Inservice Testing Programs" Oyster Creek Nuclear Generating Station Technical Specification 4.4, "Emergency Cooling"
- ASME [[]]
- NUREG -1482, "Guidelines for Inservice Testing at Nuclear Power Plants", Revision 1 Oyster Creek Generating Station Technical Specification Table 3.1.1, "Protective Instrumentation Requirements"
- OYS -99753, Exelon PowerLabs report, "Failure Evaluation of the No.1 Emergency Diesel Generator Cooling Fan Shaft Pillow-Block Bearing,
- UFSAR section 6.3.2.2, "Equipment and Component Description" Oyster Creek Nuclear Generating Station
- UFSAR section 7.3.1.3.5, "Automatic Depressurization System" Oyster Creek Nuclear Generating Station
UFSAR section 7.3.5.2, "Non-RPS Systems" Attachment
Section 1R19: Post-Maintenance Testing Procedures A-6
- OC [[-741-101, "Diesel Generator Inspection {24 Month} -Electrical" 636.4.013, "Diesel Generator #2 Load Test" 334, "Instrument and Service Air System" 651.3.002, "SGTS Particulate Filter In-Place Leak Test" 610.4.022, "Core Spray System 2 Pump Operability and Quarterly In-Service Test"]]
- AA -321, "Administrative Requirements for Inservice Testing" 609.4.001, "Isolation Condenser Valve Operability and In-Service Test" 602.3.004, "Electromatic Relief Valve Pressure Sensor Test and Calibration" Drawings
- DG [[]]
- IR ) 794100 1099299 1105435 553984 1062804 Work Order (AR) R2126779 R2146198 C2023814 R2163871 Other 1096095 553996 C2024062 R2119622 1096375 1027679 587926 618201 C2010504 A2256817 R2142502 R2119341 531101354 660529 R2166827 R2119343
- OC [[-0096, "Engine Maintenance Manual -645E4 Turbo Charge Engine (Diesel Generators )" Safety Evaluation 00212-036, "Core Spray System Operability Criteria" Safety Evaluation 00212-046, "Core Spray Main Pump Operability Criteria" Safety Evaluation 00212-061, "Core Spray System 2 Main Pump Operability Criteria"]]
- EMRV [[Setpoint and Tolerance" Oyster Creek Generating Station Technical Specification 2.3{D}, "Limiting Safety System Settings, Reactor High Pressure, Relief Valves Initiation" Section 1 R22: Surveillance Testing Procedures]]
- AA -1000, "Conduct of Maintenance" 604.4.003, "Reactor Building to Suppression Chamber Self Actuating Vacuum Breaker Surveillance Test and
- AA [[-302-1006, "Generic Letter 96-05 Program Motor-Operated Valve Maintenance and Testing Guidelines" 619.4.025, "Automatic Scram Contactor Test" Condition Reports (lR) 1088380 1088608 794100 1088397 1104183 1107302 Work Orders (AR) R2160886 R2146198 R2168080 Other Documents]]
- NRC Inspection Manual Part 9900 Technical Guidance, "Maintenance-Preconditioning of Structures, Systems, and Components Before Determining Operability" C-1302-243-531 0-041, "
- RB to Suppression Chamber Vacuum Verification oft est Procedure #604.4.003" Oyster Creek Nuclear Generating Station Technical Specification 3.5.A.4, "Reactor Building to Suppression Chamber Vacuum Breaker System" Section 1
- AA -125-1 001, "EP Performance Indicator Guidance" Other Documents Oyster Creek Alert Notification System, Upgraded System Design Report, April 2005 Section
AA-120-1 001, "10 CFR 50.54(q) Change Evaluation" Attachment
Other Documents 09-57,
- OSC Equipment Test -Software and Reference Document Inventory 10-25, Various Inventory Sheets09-105,
- AA -111, "Emergency Classification and Protective Action Recommendations", Revision 16 Other Documents 988339-02, Oyster Creek
- 2010 NRC [[]]
- NOSA -OYS-10-03 (AR 1045049), Emergency Preparedness Audit Report -Oyster Creek, dated April 19, 2010 -April 23,
- OYS -09-04 (AR 896453896453, Oyster Creek Generating Station Audit Report, dated April 20, 2009 -April 24,
- IIR [[) 00817140 00817140 00832379 01012042 00864370 01081466 00943775 01103095 01103052 01081398 00976430 00955014 00991833 00995622 01031628 00825242 00832454 00864388 00995076 01031660 Section 40A1: Performance Indicator Verification Procedures 01048223 01080731 01081564 00976439 00963878 01039079 00895806]]
AA-125-1 001, "EP Performance Indicators Guidance" Performance Indicator Data, 4th quarter 2009 -2nd quarter 2010 Other Documents NEI 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6 Reactor coolant chemistry logs, dated July 2009 through September 2010 Drywell identified and unidentified leak rate logs, dated July 2009 through September 2010 Attachment
Section 40A3: Event Followup Procedures 351.2, "High Purity Waste System" A-9
- IIR ) 754608 1008461 1110762 Work Orders (AR) 1055518 1110290 790158 1080887 A0700924 C0528074 C2024198 A0705758 C2002414 R0800924 Other Documents
- NEI 93-01, "Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants" Oyster Creek Generating Station Technical Specification 3.3.D, "Reactor Coolant System Leakage"
- ABN [[]]
- ADAMS [[]]
- ALARA [[]]
- APRM [[]]
- ANS [[]]
- ASME [[]]
- CAP [[]]
- CFR [[]]
- CR [[]]
- DEP [[]]
- EACE [[]]
- EAL [[]]
- ECR [[]]
- EDG [[]]
- EMRV [[]]
- ENS [[]]
- EOF [[]]
- EOP [[]]
- EP [[]]
- ESW [[]]
- LIST [[]]
- OF [[]]
ACRONYMS Abnormal Operating Procedure Agency-wide Documents Access and Management System As Low As Reasonably Achievable Average Power Range Monitor Alert and Notification System American Society of Mechanical Engineers Corrective Action Program Code of Federal Regulations Condition Report Drill and Exercise Performance Equipment Apparent Cause Evaluation Emergency Action Level Engineering Change Request Emergency Diesel Generator Electromatic Relief Valve Emergency Notification System Emergency Operations Facility Emergency Operating Procedure Emergency Preparedness Environmental Qualification Emergency Response Organization Emergency Service Water Attachment
Exelon
- FEMA [[]]
- FZ [[]]
- GL [[]]
- GPU [[]]
- HELB [[]]
- HVAC [[]]
- IC [[]]
- IR [[]]
- 1ST [[]]
- JCPL [[]]
- NEI [[]]
- NRC [[]]
- NUREG [[]]
- PI [[]]
- RAG [[]]
- EMS [[]]
- RB [[]]
- RCS [[]]
- RCSA [[]]
- RM [[]]
- TB [[]]
- TCCP [[]]
- TSC [[]]
- UILR [[]]
- URI [[]]
- VDC [[]]
- LLC "Federal Emergency Management Agency Fire Zone Generic Letter General Public Utilities High Energy Line Break Heating Ventilation and Air Conditioning Isolation Condenser Issue Report Inservice Test Jersey Central Power and Light Nuclear Energy Institute Nuclear Regulatory Commission NRC technical report designation (Nuclear Regulatory Commission) Office Building Oyster Creek Generating Station Performance Indicator Radioactive Gaseous Effluent Monitoring System Reactor Building Reactor Coolant System Reactor Coolant System Activity [[system" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Identified Leak Rate Training & Reference Material Turbine Building Temporary Configuration Change Package Technical Support Center Unidentified Leak Rate Unresolved Item Voltage Direct Current Work Order Attachment]]