IR 05000348/2015403
| ML15167A366 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/16/2015 |
| From: | Desai B B NRC/RGN-II/DRS/PSB2 |
| To: | McGavin S P Southern Nuclear Operating Co |
| Linda K. Gruhler 404-997-4633 | |
| References | |
| IR 2015403 | |
| Download: ML15167A366 (4) | |
Text
June 16, 2015
Mr. Stephen Fleet Security Director Southern Nuclear Operating Co., Inc.
Joseph M. Farley Nuclear Plant 40 Inverness Center Parkway (Bin B042)
Birmingham, AL 35242
SUBJECT: JOSEPH M. FARLEY NUCLEAR PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000348/2015403 AND 05000364/2015403
Dear Mr. McGavin:
On May 21, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Farley Nuclear Plant. The NRC inspectors discussed the results of this inspection with Mr. J. Hutto, and other members of the Farley staff. The inspectors documented the results in the enclosed inspection report (IR).
No NRC-identified or self-revealing findings were identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public inspections, exemptions, requests for withholding," of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,/RA/
Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8
Enclosure:
IR 05000348/2015403 and 05000364/2015403
w/Attachment:
Supplementary Information (OUO)
cc: Distribution via Listserv