IR 05000445/2014403

From kanterella
Revision as of 03:15, 23 January 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IR 05000445-14-403 & 05000446-14-403, January 16, 2014, Comanche Peak, Units 1 and 2, NRC Security
ML14055A478
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/24/2014
From: Haire M S
Plant Support Branch-1
To: Flores R
Luminant Generation Co
Walker C
References
IR-14-403
Download: ML14055A478 (3)


Text

" " February 24, 2014 Rafael Flores, Senior Vice President and Chief Nuclear Officer Attention: Regulatory Affairs Luminant Generation Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043

SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000445/2014403 AND 05000446/2014403

Dear Mr. Flores:

On January 16, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Comanche Peak Nuclear Power Plant. On January 16, 2014, the NRC inspector discussed the results of this inspection with Mr. K. Peters, Site Vice President, and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

The NRC inspector did not identify any findings or violations of more than minor significance. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's 2 ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response, "Security-Related Information-Withhold from Public Disclosure Under 10 CFR 2.390," in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,/RA/

Mark S. Haire, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-445; 50-446 License No.: NPF-87; NPF-89

Nonpublic

Enclosure:

NRC Inspection Report 05000445/2014403, 05000446/2014403

w/Attachment:

Supplemental Information 3 ML14055A478 Cover Letter Only SUNSI Review MLC Non Sensitive Sensitive MLC Publicly Available Non-Publicly Available MLCKEYWORD: SUNSI Review Complete Entire Report SUNSI Review MLC Non Sensitive Sensitive MLC Publicly Available Non-Publicly Available MLCKEYWORD: MD 3.4 Non-Public A.3 PSI:PSB1 C:PBA C:PSB1 MChambers WWalker MHaire /RA/ /RA/ R.Alexander for /RA/ 02/20/2014 02/20/2014 02/21/2014 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax