March 9, 2011

Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT: TURKEY POINT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000250/2010503 AND 05000251/2010503

Dear Mr. Nazar:

On December 31, 2010, the NRC staff completed its annual inspection of the Emergency Preparedness Program at the Turkey Point Nuclear Station. This inspection began on January 1, 2010. Issuance of this letter closes Inspection Report 05000250/2010503 and 05000251/2010503. Inspection activities charged to these reports include conducting mid-cycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, and, in some cases, performing traditional enforcement activities. Any observations and findings in this area were provided to you via separate correspondence. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-250, 50-251 License No.: DPR-31, DPR-41

cc w/encl.: (See page 2)

FP&L 2 cc w/encl: Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution Larry Nicholson, Director Licensing Florida Power & Light Company Electronic Mail Distribution Michael Kiley Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Niel Batista Emergency Management Coordinator Department of Emergency Management and Homeland Security Electronic Mail Distribution Robert J. Tomonto Licensing Manager Turkey Point Nuclear Plant Florida Power & Light Company Electronic Mail Distribution Paul Rubin Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Mitch S. Ross Vice President and Associate General Counsel Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Ruben D. Almaguer Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Mano Nazar Executive Vice President and Chief Nuclear Officer Nuclear Division Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission 9760 SW 344th St. Florida City, FL 33035 Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050 Mike A. Shehadeh, P.E. City Manager City of Homestead Electronic Mail Distribution County Manager of Miami-Dade County 111 NW 1st Street, 29th Floor Miami, FL 33128 Gene St. Pierre Vice President, Fleet Support Florida Power & Light Company Electronic Mail Distribution Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT: TURKEY POINT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000250/2010503 AND 05000251/2010503

Dear Mr. Nazar:

On December 31, 2010, the NRC staff completed its annual inspection of the Emergency Preparedness Program at the Turkey Point Nuclear Station. This inspection began on January 1, 2010. Issuance of this letter closes Inspection Report 05000250/2010503 and 05000251/2010503. Inspection activities charged to these reports include conducting mid-cycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, and, in some cases, performing traditional enforcement activities. Any observations and findings in this area were provided to you via separate correspondence.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/

Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-250, 50-251 License No.: DPR-31, DPR-41

cc w/encl.: (See page 2) Distribution w/encl: C. Evans, RII EICS (Part 72 Only)

L. Douglas, RII EICS (Linda Douglas)

OE Mail (email address if applicable)

RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER: ML110730814 X SUNSI REVIEW COMPLETE OFFICE RII: DRS RII: DRP SIGNATURE RA RA NAME B. BONSER D. RICH DATE 03/09/2011 03/08/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\PSB1\EMERGENCY PREPAREDNESS\ANNUAL CLOSEOUT LETTERS\TURKEY POINT ANNUAL CLOSEOUT 2010.DOCX