ML20005F464
| ML20005F464 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom, Limerick, 05000000 |
| Issue date: | 01/03/1990 |
| From: | Helwig D PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9001160305 | |
| Download: ML20005F464 (2) | |
Text
{{#Wiki_filter:. _ . . _ _. __ 7' t c 10 CFR 26.73(d)
' PHILAD E.LPHIA ELECTRIC COMPANY NU' LEAR GROUP HEADQUARTERS y;
- 955-65 CHESTERBROOK BLVD.
4 ~ WAYNE, PA 19087-5691-(215) 640-6550
' D AVID it. HEL. WIG au$5[[7m' v7e'ai - January 3,_1990 Docket Nos. 50-277 , 278 50-352 50-353.
License Nos. DPR-44 ' DPR NPF-39 ' NPF-85 U. S.: Nuclear Regulatory Commission Attn: -Document-Control Desk Washington, DC .20555' ,
SUBJECT:
' Peach Bottom Atomic Power Station, Units 2 and 3 ,
Limerick' Generating Station, Units 1'and 2 - 10 CFR.26 - Fitness'for Duty Programs
Dear Sir:
The final rule, " Fitness-for-Duty-Programs,"'10CFR26,.was
' issued in the Federal-Register on June 7, 1989 (54FR24468). This rule became effective on July 7,_ 1989 and, in accordance with i 10CFR26.2(c), is required to be implemented no later than January 3, 1990. Furthermore, 10CFR26. 73 (d) requires that each licensee shall certify to-the NRC that it has implemented.a fitness-for-duty- :
program that meets the requirements of 10CFR26, and that the certification shall describe any licensee chemical testing cut-off levels more stringent than those imposed by 10CFR26. To'the best of my knowledge, we have implemented a fitness for Lduty program that meets the requirements of 10CFR26 with one exception. 10CFR26, Appendix A, Subpart B,'section 2.3 requires in
-part that appropriate background checks shall be completed for a: individuals prior'to assigning them any tasks associated with the administration of the fitness-for-duty program. We have not yet completod'the background check for some of the program administrators, but expect to have these background checks completed by January 5, 1990.
5 g11603059001o3 hI - p ADOCK 05000277
- i o PDC
+
4
, .: 9' L
U.SI Nuclear Regulatory Commission January 3, 1990 Document-Control Desk Page 2 l In addition, in order to certify that we have implemented a fitness-for-duty program at~the Philadelphia Electric-Company (PECO) which meets the requirements of 10CFR26, we are performing a confirmatory' review of our program. This confirmatory _ review will be completed by the end of January, 1990. Accordingly, I will certify by January 31, 1990,-that PECO has implemented a
. fitness-for-duty program that meets the requirements of'10CFR26..
With respect to chemical testing cut-off. levels, we have~ included chemical testing 1for barbituates and benzodiazepines,
.c with a cut-off level of 300 ng/ml for_both, in addition to testing
~
for substances at the cut-off11evels specified by 10CFR26. Very truly yours,
/
cc: W.. T. Russell, Administrator, Region 1, USNRC J. ~J. . Lyash, USNRC Senior Resident Inspector, PBAPS T. J. Kenny, USNRC Senior Resident Inspector, LGS
.}}