Text
FENOC I _
Perry Nuclear Power Plant 10 Center Road FrstEnergy Nuclear Operating Company Perry, Ohio 44081 Richard Anderson 440-280-5579 Vice President-Nuclear Fax: 440-280-8029 July 14, 2005 PY-CEI/NRR-2890L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the June 2005 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
OPERATING DATA REPORT UNIT: EprrY DATE: 7/6/05
- 1. Docket: 50-440
- 2. Unit Name: Perry Nuclear Power Plant
- 3. Reporting Period June 2005
- 4. Utility
Contact:
T. Phelps
- 5. Telephone: 440-280-7660
- 6. Design Electrical Rating (Net MWe): 1260
- 7. Maximum Dependable Capacity (Net MWe): 1235 This Month Yr-to-Date Cumulative
- 8. Hours Reactor was Critical 720.0 2.051.9 122.721.3
- 9. Hours Generator On-Line 720.0 1.946.5 119.837.8
- 10. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 11. Net Electrical Enerav (MWeH) 888.993.0 2.200.275.0 137.556.032.0 Page 1
I in UNIT SHUTDOWNS REPORT MONTH - June 2005 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 716105 CONTACT: T. Phelps Il TELEPHONE: (440) 280-7660 No. Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence LHours 2 3 k
SUMMARY
- The Perry Nuclear Power Plant was on line the entire month of June 2005.
- 1. TYPE: 2. REASON: 3. METHOD:
F: Forced A- Equipment Failure (explain) I - Manual S: Scheduled 8 - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory 4 - Continuation E - Operating Training & 5 - Other License Examination F - Administrative G - Operational Error (explain)
H -Other (explain)
Page 2 I