Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY System: Conduct of Operations JTA Task #: (New)
Task
Title:
Determine Pressurizer Heater Operability KSA Ref: 2.1.33 PEO: RO: 3.4 SRO: 4.0 Operators Name:
Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature: Date:
Comments (list all steps not satisfactorily completed):
References:
Tools, Equipment, Job Aids, etc:
IPO-001A Plant Heatup from Cold Selected parameters from the plant, captured on Shutdown to Hot Standby Attachment 1 of this JPM, and a calculator.
Page 1 of 5 Rev Date: 1/19/05
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:
- Peer checking
- Three-way communications
- Phonetic alphabet
- Self checking
- ALM use
- Unit designators
- Conservative decision making
- Procedure place keeping
- Procedure rules of usage Comments:
Instructions:
You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:
The plant is ready to enter Mode 3. The Unit Supervisor has directed you to determine the operability of the Pressurizer Heaters by performing step 5.3.1 of IPO-001A, Plant Heatup from Cold Shutdown to Hot Standby. Plant data is provided.
Terminating Conditions:
Calculations are complete and an Operability determination has been made.
Page 2 of 5 Rev Date: 1/19/05
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY STEP# SAT/
- Critical ELEMENT STANDARD NOTES UNSAT 1 Provide the candidate with the Note Start time.
initiating cue, the plant data sheet, and a copy of IPO-001A step 5.3.1.
2 Candidate correctly transfers See Attached Key data to the procedure.
3 Candidate performs See Attached Key calculations.
- 4 Candidate determines B/U Heater Groups A, operability B and Control Heater Group C are OPERABLE. B/U Heater Group D is INOPERABLE TASK COMPLETE. Note Completion time.
Page 3 of 5 Rev Date: 1/19/05
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY INITIATING CUE:
The plant is ready to enter Mode 3. The Unit Supervisor has directed you to determine the operability of the Pressurizer Heaters by performing step 5.3.1 of IPO-001A, Plant Heatup from Cold Shutdown to Hot Standby. Plant data is provided.
Plant Data Parameter Value from Last Reading Current Value Sheets (OPT-XXX) 1/1-PCPR1 Amps 580 580 1/1-PCPR Amps 0 200 1/1-PCPR2 Amps 565 565 1/1P-CPR3 Amps 0 176 1B1 Volts 474 468 1B2 Volts 483 476 1B3 Volts 476 470 1B4 Volts 485 480 PC point V6303A 487.2 486.9 PC point V6302A 488.1 487.1 PC point V6301A 487.2 486.9 PC point V6304A 488.3 487.1 PC point A6801A 571.2 570.1 PC point A6802A 0 193 PC point A6803A 559.8 560 PC point A6804A 0 176 1EA1 Amps 282.7 261.4 1EA2 Amps 358.5 423.7 NOTE: The candidate can use either the MCB meter amperages or the plant computer values for heater amperages. The IPO allows both and there is no significant difference.
NOTE: The shaded parameters should NOT be used. The following problems exist with the shaded data:
- 2. 1EA1/2 amperage is not necessary to complete the calculations.
- 3. Data from the last set of logs should NOT be used for the Operability determination. Plant conditions could have changed significantly since the readings were taken. The IPO wants current plant data to determine Operability.
Page 4 of 5 Rev Date: 1/19/05
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Circle the correct status for each Bank of Pressurizer Heaters Heater Bank Status Status B/U Heater Grp. A Operable Inoperable B/U Heater Grp. B Operable Inoperable Control Grp. C Operable Inoperable B/U Heater Grp. D Operable Inoperable Example of the completed procedure:
5.3 Heatup And Pressurization For MODE 3 Entry
[C]
This section describes steps for heatup and pressurization to enter MODE 3.
5.3.1 Verify at least two groups of pressurizer heaters have a capacity of at least 150KW each.(TS SR 3.4.9.2)
A. Energize each group of heaters, as required, to measure current. _____
B. Record voltage and current AND calculate power for each group of heaters.
(Voltage x current x 0.001732 = power)
- Backup Heater Group A 1EB3 1-II-PCPR1or Or 486.9__x or _570.1 _ x 0.001732 = 480.77 KW _____
V6303A A6801A
- Backup Heater Group B 1EB2- 1-II-PCPR2 or 487.1 x or _193 _ x 0.001732 = 162.8 KW _____
V6302A A6803A
- ! Control Heater Group C 1EB1 1-II-PCPR or 486.9 x or __560 x 0.001732 = _472.54_ KW _____
V6301A A6803A
- ! Backup Heater Group D 1EB4 1-II-PCPR3 or 487.1 x or _176 x 0.001732 = __148.5__ KW _____
V6304A A6804A C. Operate pressurizer heaters as needed for plant conditions. _____
D. IF any group(s) of pressurizer heaters does NOT have a capacity of > 150KW, THEN initiate a LCOAR per ODA-308. _____
Page 5 of 5 Rev Date: 1/19/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY System: Conduct of Operations JTA Task #: (New)
Task
Title:
Calculate RCS Leakrate KSA Ref: 2.1.23 PEO: RO: 3.9 SRO: 4.0 Operators Name:
Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature: Date:
Comments (list all steps not satisfactorily completed):
References:
Tools, Equipment, Job Aids, etc:
ABN-103 Excessive Reactor Coolant Leakage Selected parameters from the plant, captured on Attachment 1 of this JPM, and a calculator.
Page 1 of 5 Rev Date: 1/24/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:
- Peer checking
- Three-way communications
- Phonetic alphabet
- Self checking
- ALM use
- Unit designators
- Conservative decision making
- Procedure place keeping
- Procedure rules of usage Comments:
Instructions:
You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:
The plant is operating at 100% power, BOL. The crew is responding to the indications of a Reactor Coolant System leak. The Unit Supervisor has directed you to determine the size of the leak by performing Attachment 1 of ABN-103, Excessive Reactor Coolant Leakage. Plant data is provided.
Terminating Conditions:
Calculations are complete and a RCS Leak Rate determination has been made.
Page 2 of 5 Rev Date: 1/24/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY STEP# SAT/
- Critical ELEMENT STANDARD NOTES UNSAT 1 Provide the candidate with the Note Start time.
initiating cue, the plant data sheet, and a copy of ABN-103 Attachment 1.
2 Candidate correctly transfers See Attached Key data to the procedure.
3 Candidate performs See Attached Key calculations.
- 4 Candidate determines Leak rate is determined operability to be approx 5 gpm.
See key for allowed variances in parameters TASK COMPLETE. Note Completion time.
Page 3 of 5 Rev Date: 1/24/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY INITIATING CUE:
Parameter Value at 1429 Value at 1446 CHG FLO (F6138A) 140.7 143.8 LTDN FLO (F6134A) 130.9 130.9 FR-157 (RCP 1 Leak Off) 2.8 2.8 FR-156 (RCP 1 Leak Off) 2.8 2.8 FR-155 (RCP 1 Leak Off) 2.8 2.8 FR-154 (RCP 1 Leak Off) 2.8 2.8 VCT LVL (L6112A) 52.8 50.4 T0400A (Loop 1 Tave) 589.8 589.8 T0420A (Loop 2 Tave) 588.6 588.6 T0440A (Loop 3 Tave) 589.7 589.7 T0460A (Loop 4 Tave) 588.7 588.7 L6480A (PZR Level 1) 60 59.5 L6481A (PZR Level 2) 60 59.5 L6482A (PZR Level 3) 60 59.5 NOTE: There was no VCT auto make-up. There were no diversions of letdown flow during this period.
Page 4 of 5 Rev Date: 1/24/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Attachment 1 CPSES UNIT 1 AND 2 PROCEDURE NO.
ABNORMAL CONDITIONS PROCEDURES MANUAL ABN-103 EXCESSIVE REACTOR COOLANT LEAKAGE REVISION NO 8 PAGE 22 OF 28 ATTACHMENT 1 PAGE 2 OF 2 PARAMETER INITIAL VALUE FINAL VALUE AVERAGE VALUE TIME (-) __1429____ + __1446____ = ____17___ t
- CHRG FLO __140.7____ + ___143.8___
(F6138A) ( __________284.5____________) = __142.25___ GPM 2
- LTDN HX OUT FLOW ___130.9__ + ___130.9___
(F6134A) (__________261.8______________) = __130.9__ GPM 2
- RCP SEAL LKOFF FLO ___11.2______ + ____11.2____
(FR-157, 156, 155 (___________5.6______________.) = ___11.2___ GPM
& 154) 2
- VCT LVL (_52.8___ - __50.4___)(19.4gal/%)
(L6112A) (_________46.56__________________) = __2.74___ GPM
(__17____)t in MIN)
RC LOOP 1-4 TAVE (________ - ________)(93gal/°F)
(T0400A,T0420A,T0440A ( _____________0__________________) = ____0___ GPM OR T0460A) (_____17_____)t in MIN)
PRZR LVL (_60___ - ___59.5__)(65gal/%)
(L6480A,L6481A OR ( _________32.5___________________) = ___1.9___ GPM L6482A) (__17_____)t in MIN)
Shaded areas NOT REQUIRED CALCULATION FORMULA Flow adjust method:
(+) ________ -________ -________ -( )_________ +( )________ = ______GPM CHRG FLO LTDN FLOW SEAL LKOFF TAVG ADJUST PRZR LVL RCS LEAKAGE FLO ADJUST OR VCT level adjust method
( )__2.74___ -( )_0___ +(+ )__1.9__ = __4.65_GPM Allowed (4.1 VCT LVL ADJUST TAVG - 5.2)
Allowed (2.5-3.0) ADJUST PRZR LVL RCS LEAKAGE ADJUST Allowed (1.6 -
2.2)
- Either Chrg Flo, Ltdn Flow, and RCP Seal Lkoff Flo (Flow adjust method) OR VCT Lvl (VCT level adjust method) should be used, but NOT both.
Page 5 of 5 Rev Date: 1/24/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 6 of 5 Rev Date: 1/24/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 System: Equipment Control JTA Task #: (New)
Task
Title:
Check Completed Surveillance Procedure for Accuracy KSA Ref: 2.2.12 PEO: RO: 3.0 SRO: 3.4 Operators Name:
Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature: Date:
Comments (list all steps not satisfactorily completed):
References:
Tools, Equipment, Job Aids, etc:
OPT-207A Service Water System Selected parameters from the plant, captured on Attachment 1 of this JPM..
Page 1 of 13 Rev Date: 1/25/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:
- Peer checking
- Three-way communications
- Phonetic alphabet
- Self checking
- ALM use
- Unit designators
- Conservative decision making
- Procedure place keeping
- Procedure rules of usage Comments:
Instructions:
You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:
The plant is operating at 100% power, BOL. You are the CPC RO. The Unit Supervisor has directed you to review the just completed OPT-207 A, Service Water System, for accuracy. Circle any mistakes in the OPT and return the marked up copy to the Lead Examiner.
Terminating Conditions:
The OPT has been reviewed and 2 of the three errors have been correctly identified.
Page 2 of 13 Rev Date: 1/25/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 STEP# SAT/
- Critical ELEMENT STANDARD NOTES UNSAT 1 Provide the candidate with the Note Start time.
initiating cue.
2 Candidate reviews completed See Attached Key data sheet.
- 3 Candidate determines the Two of the three errors NOTE: The errors in the completed OPT. are identified. See vibration alert Attached Key for the error should be three errors. noted in 4 places.
It is critical that the ODA -308 Tracking LOCAR be noted. The others are less TASK COMPLETE. Note Completion time. important.
Page 3 of 13 Rev Date: 1/25/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 INITIATING CUE:
The plant is operating at 100% power, BOL. You are the CPC RO. The Unit Supervisor has directed you to review the just completed OPT-207A, Service Water System, for accuracy. Circle any mistakes in the OPT and return the marked up copy to the Lead Examiner.
Page 4 of 13 Rev Date: 1/25/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 . Completed OPT.
NOTE TO EXAMINER: Ensure candidate is provided the filled out OPT. This must be done manually.
Page 5 of 13 Rev Date: 1/25/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 ROUTINE TEST-SURVEILLANCE page 1 WORK ORDER Resp. Group: POSS OPS SHIFT MANAGER WO # : 5-05-505395-AA Tag #: CP1-SWAPSW-01 Unit: 1 Train (Sys) : A See Equipment List System: SW Train (Elect) : NA More Tags and Locations Bldg/Elev : SI 0796 Room: X-275 Tag Desc: STATION SERVICE WATER PUMP 1-01 Compt Quality: Y Safety Class: 3 SEIS CAT: I MOV XI: N PVO: A EQ: M
- SURVEILLANCE
SUMMARY
DESC: OPT-207A, TRN A STATION SERVICE WATER PMP/VLV OPERBILITY TEST Compliance Date/Time : 03/21/2005 10:05 Source Doct : IST Violation Date/Time : 04/05/2005 10:05 Test Section : 8.2 Adj Schedule Date/Time: __/__/____ Test Procedure: OPT-207A Work Week Test Type : FI Frequency : 92 Days Last Performed Date/Time : 01/09/2005 10:005 Last Perf. WO : 5-04-505395-AE
- SPECIAL INSTRUCTIONS***************************************************
Permit-RWP : N #: ____________________ Confined Space : N #: ____________________
Fire Permit : N #: ____________________ Combust. Loading : N #: ____________________
Fire Impair : N #: ____________________ Cleanliness Class: C Housekeeping Zone: IV Clearance/MTD : N #: ____________________ STA-720 Reqd : No Barrier Impair Form: No Postwork Testing Reqt: N Ventilation Pressure Boundary Breach: No
- APPROVAL/AUTHORIZATION TO START***************************************
Ops-Shift Manager Technical : _____________________________ Date: __/__/____
Radiation Protection : _____________________________ Date: __/__/____
Shift Manager : _____________________________ Date: __/__/____
Ops-Shift Manager Safety : _____________________________ Date: __/__/____
Revisions 1 2 3 4 5 6
POSS ______ ______ ______ ______ ______ ______
QC ______ ______ ______ ______ ______ ______
ANII ______ ______ ______ ______ ______ ______
RP ______ ______ ______ ______ ______ ______
Ops SM ______ ______ ______ ______ ______ ______
- INITIAL SURVEILLANCE RESULTS**********************************************
As Found Condition: _____ Unsat (Sign&Date) ____________________________ Date: __/__/____
Shift Manage Informed (Sign&Date) _________________________________ Date: __/__/____
- FINAL SURVEILLANCE RESULTS***************************************************
Duration (Est/Act) 7 / ___ Start Time ____ Date: __/__/____
Test Completed: ___ Sat ___ Unsat Tech Spec Acceptance Checked: ___ Sat ___ Unsat Test Completed by: ________________________________________ Time: ____ Date: __/__/____
- SURVEILLANCE ACCEPTANCE*******************************************************
Tech Spec Acceptance Criteria Met: ___ Sat ___ Unsat Shift Manager: ________________________________________ Date: __/__/____ Time: ____
- SURVEILLANCE REVIEWS********************************************************
Ops-Shift Manager : _____________________________ Date: __/__/____
Ops-Shift Manager : _____________________________ Date: __/__/____
Ops-Shift Manager : _____________________________ Date: __/__/____
Ops-Shift Manager : _____________________________ Date: __/__/____