ML051320298

From kanterella
Revision as of 14:48, 9 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Response to Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections
ML051320298
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/27/2005
From: Nerses V
NRC/NRR/DLPM/LPD1
To: Christian D
Dominion Nuclear Connecticut
Nerses V, NRR/DLPM, 415-1484
References
GL-04-001, TAC MC4829
Download: ML051320298 (3)


Text

May 27, 2005 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

MILLSTONE POWER STATION, UNIT NO. 2, RESPONSE TO GENERIC LETTER 2004-01, REQUIREMENTS FOR STEAM GENERATOR TUBE INSPECTIONS (TAC NO. MC4829)

Dear Mr. Christian:

On August 30, 2004, the Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2004-01, Requirements For Steam Generator Tube Inspections. The purpose of GL 2004-01 was to obtain information that would enable the NRC staff to determine whether licensees steam generator (SG) tube inspection programs comply with the existing tube inspection requirements (the plant Technical Specifications in conjunction with Appendix B to Title 10 of the Code of Federal Regulations Part 50).

By letter dated October 29, 2004, Dominion Nuclear Connecticut, Inc. responded to GL 2004-01 for Millstone Power Station, Unit No. 2 (MP2). The staffs review of your response to the GL did not identify any concerns with the inspection practices employed at MP2. The staff, therefore, concludes that your SG tube inspection practices are in compliance with the existing tube inspection requirements.

If you have any questions regarding this matter, please contact me at (301) 415-1484.

Sincerely,

/RA/

Victor Nerses, Senior Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-336 cc: See next page

ML051320298 OFFICE PDI-2/PM PDI-2/LA PDI-2/SC NAME VNerses CRaynor JBoska for DRoberts DATE 5/20/05 5/19/05 5/27/05

Millstone Power Station, Unit No. 2 cc:

Lillian M. Cuoco, Esquire Mr. John Markowicz Senior Counsel Co-Chair Dominion Resources Services, Inc. Nuclear Energy Advisory Council Building 475, 5th Floor 9 Susan Terrace Rope Ferry Road Waterford, CT 06385 Waterford, CT 06385 Mr. Evan W. Woollacott Edward L. Wilds, Jr., Ph.D. Co-Chair Director, Division of Radiation Nuclear Energy Advisory Council Department of Environmental Protection 128 Terry's Plain Road 79 Elm Street Simsbury, CT 06070 Hartford, CT 06106-5127 Ms. Nancy Burton Regional Administrator, Region I 147 Cross Highway U.S. Nuclear Regulatory Commission Redding Ridge, CT 00870 475 Allendale Road King of Prussia, PA 19406 Mr. Chris L. Funderburk Director, Nuclear Licensing and First Selectmen Operations Support Town of Waterford Dominion Resources Services, Inc.

15 Rope Ferry Road Innsbrook Technical Center Waterford, CT 06385 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Charles Brinkman, Director Washington Operations Nuclear Services Mr. David W. Dodson Westinghouse Electric Company Licensing Supervisor 12300 Twinbrook Pkwy, Suite 330 Dominion Nuclear Connecticut, Inc.

Rockville, MD 20852 Building 475, 5th Floor Rope Ferry Road Senior Resident Inspector Waterford, CT 06385 Millstone Power Station c/o U.S. Nuclear Regulatory Commission P.O. Box 513 Niantic, CT 06357 Mr. J. Alan Price Site Vice President Dominion Nuclear Connecticut, Inc.

Building 475, 5th Floor Rope Ferry Road Waterford, CT 06385