UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I V 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005 August 30, 2005 Joseph E. Venable Vice President Operations Waterford 3 Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751
SUBJECT:
MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
WATERFORD 3 STEAM ELECTRIC STATION
Dear Mr. Venable:
On August 4, 2005, the NRC staff completed its performance review of the Waterford 3 Steam Electric Station for the first half of the calendar year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIS)for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility in order for you to inform us of any planned inspections that may conflict with your plant activities.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIS indicating performance at a level requiring no additional NRC oversight (Green). Although plant performance was within the Licensee Response Column, the significance of findings that occurred during the refueling outage involving reactor coolant system configuration control issues that resulted in a vacuum being drawn during a reactor coolant system inventory reduction is still under review as part of Significance Determination Process which, when finalized, may change our assessment of your plants safety performance.
The enclosed inspection plan details the inspections, except those related to physical protection, scheduled through March 31, 2007. The inspection plan is provided to minimize the resource impact on your staff and to allow for the early resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.
Entergy Operations, Inc. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at httg://www.nrc.nov/readina-rmladams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8147 with any questions you may have regarding this letter or the inspection plan.
Sincerely, David N. Graves, Chief Project Branch E Division of Reactor Projects Docket: 50-382 License: NPF-38
Enclosure:
Waterford 3 Inspection/Activity Plan cc w/enclosure:
Senior Vice President and Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Vice President, Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, MS 39205 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751
Entergy Operations, Inc. Manager - Licensing Manager Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Chairman Louisiana Public Service Commission P.O. Box 91154 Baton Rouge, LA 70821-9154 Director, Nuclear Safety &
Regulatory Affairs Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box4313 Baton Rouge, LA 70821-4313 Parish President St. Charles Parish P.O. Box 302 Hahnville, LA 70057 Winston & Strawn LLP 1700 K Street, N.W.
Washington, DC 20006-3817 Institute of Nuclear Power Operations (INPO)
Records Center 700 Galleria Parkway SEI Suite 100 Atlanta, GA 30339
v) v) v) v ) v ) v) v) v) v)
C c C c c
.-
c 0 .-c0 .-c0 . P .o c c C
.-
0 c
I c
-5 5
.-
c K
.-
c 0
O 0 a,
a a,
O a, $ 8 O a,
a 0
a, 0
a, a
0 a,
% p.
2 % p.
-a, -a, -a , a-, - -a, -a, -%
(0 v) v) v) v)
[I: _. K C C C c C C C a, a, a,
-
.-
C
-C
.- .-
_.
C .-C .-C 5 5
-
.-C -
.-c -
.-c -
.-
C 8 ti $
m $ 8 8 8m 8 a, v) cn" m m m m cn" m cn" cn" m m m ( D W (D (D co (D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 e? e?!
.
2 co 0
?!
0 r?
0, 0
?
-
b B
0
!
z -
&
0 0
%
?!
m
?!
(D 0
?!
7
?!
co 0
?!
m B
.r
?!
0
?!
z m m m ( D W (0 co (D (D 0 0 0 0 0 0 0 0 0 0 8 0
2s 0 0
-
0 0 0 Q?
m T
W 0
?!
(D
?!
m 0
?!
m B
z 53 0 0
.
?
m 0
0
!
.
?!
2 W
0 2
B 0
7
.
?!
Ir!
-
0 l- l - F I
I-O C
.-a, I,
m 0 m m m m m m m m m m m m m m m m m m m m
b b b b 0 0 0 0 0 0 0 0 N C U N N aaaa ssss 0 0 0 0 a,
I-C
>
a, 0
.c.
a P
U C
m C
.-
c 0
c a
C E2 c
-C ffl 0
a, 0
C
.-
C m ij
.-
c E K
8K E Y
.-0 c
C i7j m c 5 ma, d I a m '
m 8 0 0 6
-
7 2
b N C U si2 K K
.-
7 F
b a lala rn a i n n.
b l w LT $!
m m m m m m m m
Entergy Operations, Inc. Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (KMK)
Senior Resident Inspector (MCH)
Branch Chief, DRP/E (DNG)
Senior Project Engineer, DRP/E (VGG)
Team Leader, DRP/TSS jRLN1)
RITS Coordinator (KEG)
V. Dricks, PA0 (VLD)
W. Maier, RSLO (WAM)
C.Gordon (CJG)
DRS Branch Chiefs (LJS, MPSl, REL, NFO)
S. Richards, Chief, NRWDIPMAIPB (SAR)
M. Case, Deputy Dir. for Inspection and Programs (MJC)
B. Sheron, Associate Dir. for Project Licensing and Technical Analysis (BWS)
T. Bergman, Chief, TRPS/OEDO (TAB)
H. Berkow, Director, LPD4, NRWDLPM (HNB)
D. Terao, Chief, PDIV-1, NRR/DLPM (DXT)
N. Kalyanam, NRR Project Manager (NXK)
SlSP Review Completed: -dng ADAMS: mYes No Initials: -dng-E Publicly Available 0 Non-Publicly Available 0 Sensitive E Non-Sensitive OFmClAL RECORD COPY T=Telephone E=E-mail F=Fax