IR 05000346/2005018

From kanterella
Revision as of 00:05, 8 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
IR 05000346-05-018, on 10/17/2005 - 10/21/2005; Davis-Besse Nuclear Power Station; Supplemental Inspection; IP 95001, Inspection for One or Two White Inputs in a Strategic Performance Area.
ML053400088
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/05/2005
From: Pederson C
Division of Reactor Safety III
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
EA-04-231, EA-04-232 IR-05-018
Download: ML053400088 (26)


Text