ML070860235
| ML070860235 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 03/21/2007 |
| From: | NRC/RGN-III |
| To: | |
| References | |
| Download: ML070860235 (23) | |
Text
Perry Confirmatory Action Letter Closure Meeting Nuclear Regulatory Commission - Region III Lisle, Illinois March 21, 2007 1
Meeting Agenda
- Meeting Purpose and Introductions
- Review of Perry Performance
- CAL Closure Discussion
- White Findings Closure Discussion
- Multiple/Repetitive Degraded Cornerstone Column Transition
- Licensee Response and Remarks
- NRC Closing Remarks
<Break>
- Public Comments and Questions of NRC 2
Purpose of Todays Meeting A public forum for the discussion of recent NRC actions NRC will discuss the March 2, 2007 letter that closed the Perry CAL, closed long-standing White findings, and removed Perry from the Multiple/Repetitive Degraded Cornerstone column of the NRCs Action Matrix Licensee will be given the opportunity to respond to the information in the letter 3
NRC Representatives
- James Caldwell, Region III Administrator Phone: (630) 829-9657
- Eric Duncan, Branch Chief, DRP Phone: (630) 829-9628
- Thomas Wengert, Project Manager, NRR Phone: (301) 415-4037
- Mark Franke, Perry Senior Resident Inspector Phone: (440) 259-3610
- Mark Wilk, Perry Resident Inspector Phone: (440) 259-3610
- Paul Zurawski, Reactor Engineer Phone: (630) 829-9621 4
Perry Annual Assessment Results January 1 - December 31, 2006
- Perry operated in a manner that preserved public health and safety
- Perry categorized within the Multiple/Repetitive Degraded Cornerstone column of the NRCs Action Matrix
- Two White findings remained open
- Substantive cross-cutting issues in Human Performance and Problem Identification and Resolution were closed 5
Review of Perry Performance
- August 2004 - Perry entered Multiple/Repetitive Degraded Cornerstone Column of Action Matrix
- January - May 2005 - IP 95003 Inspection
- September 2005 - NRC Issued Perry CAL 6
Perry Confirmatory Action Letter September 28, 2005 - Perry CAL Issued 3/4 Acknowledged FENOC Commitment to Improve Performance at Perry 3/4 Advised Perry of NRCs Plans to Conduct CAL Followup Inspections 3/4 Advised Perry that CAL Would Remain Open Pending Sustained Improved Performance 7
Completed NRC CAL Followup Inspections at Perry Completed CAL Followup Inspections 3/4 PII Phase 2 Review 3/4 IP 95002 Issues - Action Item Implementation 3/4 Corrective Action Program - Action Item Implementation 3/4 Emergency Preparedness - Action Item Implementation and Effectiveness 8
Completed NRC CAL Followup Inspections at Perry Completed CAL Followup Inspections 3/4 Human Performance - Action Item Implementation 3/4 IP 95002 Issues - Action Item Effectiveness 3/4 Human Performance - Action Item Effectiveness 3/4 Maintenance Procedure Adequacy - Action Item Effectiveness 3/4 Corrective Action Program - Action Item Effectiveness 9
CAL Closure Basis 9 All CAL Commitments Implemented 9 All CAL Closure Inspections Completed 9 Sustained Performance Improvement 3/4 Human Performance - Effective 3/4 Corrective Action Program Implementation - Effective 3/4 IP 95002 Issue Followup - Effective 3/4 Emergency Preparedness - Effective Confirmatory Action Letter Closed 10
Long-Standing Open White Findings Two White Findings 3/4 Air-Bound LPCS/RHR A Waterleg Pump
- August 14, 2003 - Following LOOP, LPCS/RHR A waterleg pump air bound; LPCS/RHR A inoperable 3/4 Failed ESW A Pump Coupling
Corrective actions to address first failure inadequate 11
Closure of Open White Findings Supplemental Inspection Results 9 Revised Quality Control hold point procedure 9 Quality Control hold points properly applied 9 Upgraded key maintenance procedures Long-Standing White Findings Closed 12
IMC 0305 Multiple/Repetitive Degraded Cornerstone Exit Criteria 3/4 New plant events or findings do not reveal similar significant performance weaknesses 3/4 NRC and licensee performance indicators do not indicate similar significant performance weaknesses that have not been adequately addressed 3/4 The licensees performance improvement program has demonstrated sustained improvement 3/4 NRC supplemental inspections show license progress 3/4 No issues led the NRC to take additional regulatory actions. Significant progress on actions imposed 13
IMC 0305 Multiple/Repetitive Degraded Cornerstone Exit Criteria 3/4 New plant events/findings do not reveal similar significant performance weaknesses 9 Recent plant events - no similar significant performance weaknesses 9 New plant findings - no similar significant performance weaknesses 14
IMC 0305 Multiple/Repetitive Degraded Cornerstone Exit Criteria 3/4 NRC/licensee PIs do not indicate similar significant performance weaknesses that have not been adequately addressed NRC PIs do not indicate similar weaknesses 9 All 4Q06 NRC PIs Green 9 All PIs Green in previous 10 quarters except Emergency AC Power System MSPI - 2Q06 Perry PIs do not indicate similar weaknesses 9 NRC inspections confirmed KPI implementation and results 9 Perry KPIs demonstrate measurable improvement 15
IMC 0305 Multiple/Repetitive Degraded Cornerstone Exit Criteria 3/4 The licensees performance improvement program has demonstrated sustained improvement 9 All PII Commitments/Action Items completed 9 Perry/FENOC assessments identified sustained performance improvements 9 Perry Excellence Plan to ensure continued improvement 9 Independent Assessment of Corrective Action Program planned for 3Q06 16
IMC 0305 Multiple/Repetitive Degraded Cornerstone Exit Criteria 3/4 NRC inspections show license progress 9 NRC supplemental inspections identified measurable improvements in all CAL areas 9 All areas of the CAL effectively addressed 17
IMC 0305 Multiple/Repetitive Degraded Cornerstone Exit Criteria 3/4 No issues led NRC to take additional actions.
Significant progress on actions imposed 9 No additional regulatory actions implemented beyond IMC 0305 9 Significant CAL progress realized with all Commitments and Action Items completed 18
Summary of Actions
- Perry Confirmatory Action Letter dated September 28, 2005 closed
- Long-standing White findings closed
- Substantive cross-cutting issues in Human Performance and Problem Identification and Resolution closed
- Perry transitioned out of Multiple/Repetitive Degraded Cornerstone column of Action Matrix 19
Licensee Response and Remarks FENOC 20
Contacting the NRC z Report an emergency (301) 816-5100 (call collect) z Report a safety concern:
(800) 695-7403 Allegation@nrc.gov z General information or questions www.nrc.gov Select What We Do for Public Affairs 21
Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z Public Document Room 1-800-397-4209 (Toll Free) 22
Summary of Actions
- Perry Confirmatory Action Letter dated September 28, 2005 closed
- Long-standing White findings closed
- Substantive cross-cutting issues in Human Performance and Problem Identification and Resolution closed
- Perry transitioned out of Multiple/Repetitive Degraded Cornerstone column of Action Matrix 23