ML030760057
| ML030760057 | |
| Person / Time | |
|---|---|
| Issue date: | 03/14/2003 |
| From: | Pierson R NRC/NMSS/FCSS |
| To: | Killar F Nuclear Energy Institute |
| References | |
| Download: ML030760057 (2) | |
Text
March 14, 2003 Mr. Felix M. Killar, Jr.
Director, Materials Licensees Nuclear Energy Institute 1776 I St. N.W.
Suite 400 Washington, DC 20006
SUBJECT:
FINAL INTERIM COMPENSATORY MEASURES FOR CATEGORY III FUEL CYCLE FACILITIES
Dear Mr. Killar:
This letter documents our approval of your request to receive a copy of the final interim compensatory measures (ICMs) for Category III fuel cycle facilities for the purpose of coordinating the preparation of an implementation guidance document for the industry. We concluded that you are serving as an agent for the Category III fuel cycle licensees and you have a need to know the information. The ICMs have been prepared for pick up at our office per your request.
The ICMs are safeguards information and must be protected pursuant to the requirements in 10 CFR Part 73.21. Violation of the protection requirements is subject to civil and criminal penalties.
If you have any questions regarding this matter, please contact Kevin Ramsey of my staff at (301) 415-7887 or email at kmr@nrc.gov.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Robert C. Pierson, Director Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards
March 14, 2003 Mr. Felix M. Killar, Jr.
Director, Materials Licensees Nuclear Energy Institute 1776 I St. N.W.
Suite 400 Washington, DC 20006
SUBJECT:
FINAL INTERIM COMPENSATORY MEASURES FOR CATEGORY III FUEL CYCLE FACILITIES
Dear Mr. Killar:
This letter documents our approval of your request to receive a copy of the final interim compensatory measures (ICMs) for Category III fuel cycle facilities for the purpose of coordinating the preparation of an implementation guidance document for the industry. We concluded that you are serving as an agent for the Category III fuel cycle licensees and you have a need to know the information. The ICMs have been prepared for pick up at our office per your request.
The ICMs are safeguards information and must be protected pursuant to the requirements in 10 CFR Part 73.21. Violation of the protection requirements is subject to civil and criminal penalties.
If you have any questions regarding this matter, please contact Kevin Ramsey of my staff at (301) 415-7887 or email at kmr@nrc.gov.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Robert C. Pierson, Director Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards Distribution: Accession #:ML030760057 FCFB r/f ARayland, NSIR C:\ORPCheckout\FileNET\ML030760057.wpd OFC FCFB* FCFB OGC NSIR FCFB FCFB FCSS NAME KRamsey JMuszkiewicz JGoldberg MWeber LRoché DGillen RPierson DATE 03/10/03 03/10/03 03/11/03 03/12/03 03/13/03 03/13/03 03/14 /03
- See previous concurrence OFFICIAL RECORD COPY