HBL-11-007, 2011 Annual Statement of Insurance for Pacific Gas and Electric Company'S Diablo Canyon Power Plant and Humboldt Bay Power Plant
| ML110910330 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon, Humboldt Bay |
| Issue date: | 04/01/2011 |
| From: | Becker J Pacific Gas & Electric Co |
| To: | Document Control Desk, NRC/FSME, Office of Nuclear Reactor Regulation |
| References | |
| DCL-11-028, HBL-11-007 | |
| Download: ML110910330 (2) | |
Text
Pacific Gas and Electric Company James R. Becker Diablo Canyon Power Plant Site Vice President Mail Code 104/5/601
- p. O. Box 56 Avila Beach, CA 93424 April 1, 2011 805.545.3462 Internal: 691.3462 Fax: 805.545.6445 PG&E Letter DCL-11-028 PG&E Letter HBL-11-007 U.S. Nuclear Regulatory Commission 10 CFR 50.54 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Docket No. 50-133, OL-DPR-7 Humboldt Bay Power Plant, Unit 3 2011 Annual Statement of Insurance for Pacific Gas and Electric Company's Diablo Canyon Power Plant and Humboldt Bay Power Plant
Dear Commissioners and Staff:
As required by 10 CFR 50.54(w)(3), listed below is the annual reporting of nuclear property insurance coverage for the Diablo Canyon Power Plant (DCPP) and Humboldt Bay Power Plant (HBPP):
Policy Policy Policy Limits Number Period DCPP NEIL Primary $ 500,000,000 P11-027 04/01/11 to 4/01/12 NEIL II Excess $1,250,000,000 X11-042 04/01/11 to 4/01/12 NEIL Blanket Excess $1,000,000,000 BX11-007 04/01/11 to 4/01/12 TOTAL $2,750,000,000 HBPP NEIL Primary $ 131,100,000 P11-028 04/01/11 to 4/01/12 Pacific Gas and Electric Company makes no regulatory commitments in this letter.
If you have any questions regarding this information, please contact Mr. George Page at (415) 267-7244.
Sin cerely, '--~-" _'
~\ . ":'_-.. """ ' d '
./ i
~ ....,\ /~~
-.". ", '"~ c....-- ~ \ - \. ~
.-(
- \'" / -----
, -'
...::.....--
James R. Becker A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- San Onofre
- South Texas Project
- Wolf Creek
Docu ment Control Desk PG&E Letter DCL-11-028 April 1, 2011 PG&E Letter HBL-11 -007 Page 2 swh/64018356 cc: Elmo E. Collins, NRC Region IV Robert J. Evans, NRC Region IV Inspector John B. Hickman, NRC Project Manager Michael S. Peck, NRC Senior Resident Inspector Jennifer Post Alan B. Wang, NRC Project Manager Diablo Distribution PG Fossil Gen HBPP Humboldt Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- San Onofre
- South Texas Project
- Wolf Creek
Text
Pacific Gas and Electric Company James R. Becker Diablo Canyon Power Plant Site Vice President Mail Code 104/5/601
- p. O. Box 56 Avila Beach, CA 93424 April 1, 2011 805.545.3462 Internal: 691.3462 Fax: 805.545.6445 PG&E Letter DCL-11-028 PG&E Letter HBL-11-007 U.S. Nuclear Regulatory Commission 10 CFR 50.54 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Docket No. 50-133, OL-DPR-7 Humboldt Bay Power Plant, Unit 3 2011 Annual Statement of Insurance for Pacific Gas and Electric Company's Diablo Canyon Power Plant and Humboldt Bay Power Plant
Dear Commissioners and Staff:
As required by 10 CFR 50.54(w)(3), listed below is the annual reporting of nuclear property insurance coverage for the Diablo Canyon Power Plant (DCPP) and Humboldt Bay Power Plant (HBPP):
Policy Policy Policy Limits Number Period DCPP NEIL Primary $ 500,000,000 P11-027 04/01/11 to 4/01/12 NEIL II Excess $1,250,000,000 X11-042 04/01/11 to 4/01/12 NEIL Blanket Excess $1,000,000,000 BX11-007 04/01/11 to 4/01/12 TOTAL $2,750,000,000 HBPP NEIL Primary $ 131,100,000 P11-028 04/01/11 to 4/01/12 Pacific Gas and Electric Company makes no regulatory commitments in this letter.
If you have any questions regarding this information, please contact Mr. George Page at (415) 267-7244.
Sin cerely, '--~-" _'
~\ . ":'_-.. """ ' d '
./ i
~ ....,\ /~~
-.". ", '"~ c....-- ~ \ - \. ~
.-(
- \'" / -----
, -'
...::.....--
James R. Becker A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- San Onofre
- South Texas Project
- Wolf Creek
Docu ment Control Desk PG&E Letter DCL-11-028 April 1, 2011 PG&E Letter HBL-11 -007 Page 2 swh/64018356 cc: Elmo E. Collins, NRC Region IV Robert J. Evans, NRC Region IV Inspector John B. Hickman, NRC Project Manager Michael S. Peck, NRC Senior Resident Inspector Jennifer Post Alan B. Wang, NRC Project Manager Diablo Distribution PG Fossil Gen HBPP Humboldt Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- San Onofre
- South Texas Project
- Wolf Creek