ML14251A240

From kanterella
Revision as of 00:38, 4 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Operator Licensing Retake Operating Examination Approval-Indian Point Unit 2
ML14251A240
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 09/08/2014
From: James Trapp
Division of Reactor Safety I
To: Ventosa J
Entergy Nuclear Operations
Jackson D
Shared Package
ML14190B006 List:
References
Download: ML14251A240 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 September 8, 2014 Mr. John Ventosa, Site Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

OPERATOR LICENSING RETAKE OPERATING EXAMINATION APPROVAL -

INDIAN POINT UNIT 2

Dear Mr. Ventosa:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing retake operating test at Indian Point, Unit 2.

The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided an approved applicant list to Mr. F. Inzirillo, Training Manager. Note that any examination waivers and application denials, if submitted, have been addressed in separate correspondence.

The NRC has approved the subject operating test. The NRC staff will administer the operating test during the week of September 15, 2014. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact Don Jackson, Operations Branch Chief, at (610) 337-5306.

Please contact your Chief Examiner, Mr. Chris Lally, at (610) 337-5124, if you have any questions or identify any errors or changes in the examination specified for the applicant.

Sincerely,

/RA/

James M. Trapp, Acting Director Division of Reactor Safety Docket No. 50-247 License No. DPR-26

cc: Distribution via ListServ Mr. John Ventosa, Site Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

OPERATOR LICENSING RETAKE OPERATING EXAMINATION APPROVAL -

INDIAN POINT UNIT 2

Dear Mr. Ventosa:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing retake operating test at Indian Point, Unit 2.

The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided an approved applicant list to Mr. F. Inzirillo, Training Manager. Note that any examination waivers and application denials, if submitted, have been addressed in separate correspondence.

The NRC has approved the subject operating test. The NRC staff will administer the operating test during the week of September 15, 2014. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact Don Jackson, Operations Branch Chief, at (610) 337-5306.

Please contact your Chief Examiner, Mr. Chris Lally, at (610) 337-5124, if you have any questions or identify any errors or changes in the examination specified for the applicant.

Sincerely,

/RA/

James M. Trapp, Acting Director Division of Reactor Safety Docket No. 50-247 License No. DPR-26 cc: Distribution via ListServ Distribution (via email): See next page SUNSI Review Complete: JMT (Reviewers Initials)

ADAMS PKG: ML14190B006 ADAMS NO. ML14251A240 DOCUMENT NAME: G:\DRS\Operations Branch\Lally\FY14-IP2 Retake Exam Sept (U01921)\ExamApprovalLtr.doc SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS/OB RI/DRS/OPS RI/DRS NAME CLally/CL CBixler/CB JTrapp/JT DATE 09/08/2014 09/08/2014 09/08/2014 OFFICIAL RECORD COPY

J. Ventosa 2 Distribution w/encl: (via E-mail)

W. Dean, RA (R1ORAMAIL RESOURCE)

D. Lew, DRA (R1ORAMAIL RESOURCE)

H. Nieh, DRP (R1DRPMAIL RESOURCE)

M. Scott, DRP (R1DRPMAIL RESOURCE)

J. Trapp, DRS (R1DRSMAIL RESOURCE)

B. Welling, DRS (R1DRSMAIL RESOURCE)

A. Burritt, DRP D. Jackson, DRS T. Setzer, DRP C. Lally, DRS L. McKown, DRP C. Bixler, DRS J. Petch, DRP K. Heater, DRS S. Stewart, DRP, SRI B. Bollinger, DRP, RI (Actg)

G. Newman, DRP, RI D. Hochmuth, DRP, AA J. Jandovitz, RI OEDO RidsNrrPMIndianPoint Resource RidsNrrDorlLpl1-1 Resource ROPReports Resources Distribution:

DRS Master Exam File (C. Bixler) (w/concurrences)