ML17018A123
| ML17018A123 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/17/2017 |
| From: | Geoffrey Miller NRC/RGN-IV/DRP/RPB-D |
| To: | Kennedy K Region 4 Administrator |
| Miller G | |
| References | |
| MD 8.3 | |
| Download: ML17018A123 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 January 17, 2017 MEMORANDUM TO: Kriss M. Kennedy, Regional Administrator THRU: Troy W. Pruett, Director /RA/
Division of Reactor Projects FROM: Geoffrey B. Miller, Chief /RA/
Project Branch D
SUBJECT:
MANAGEMENT DIRECTIVE 8.3 EVALUATION FOR PALO VERDE UNIT 3 EMERGENCY DIESEL GENERATOR FAILURE Pursuant to Regional Office Policy Guide 0801, Management Directive 8.3 and Inspection Manual Chapter 0309 Reactive Team Inspection Decisions, Implementation, and Documentation for Power Reactors, the enclosed table provides the Management Directive 8.3 evaluation for determining that a Special Inspection Team inspection will be conducted at Palo Verde for the catastrophic failure of the Unit 3 emergency diesel generator.
Concur with Recommendation: /RA/ 1/17/17 Kriss M. Kennedy Date Regional Administrator
Enclosures:
MD 8.3 Decision Documentation Form (Deterministic and Risk Criteria Analyzed)
CONTACT: Geoffrey B. Miller 817-200-1173
ML17018A123 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: JLD Yes Non-Publicly Available Sensitive MD 3.4/A.7 No OFFICE RIV:SPE:DRP SRA:DRS/PSB2 C:DRP/D D:DRS D:DRP NAME JDixon DLoveless GMiller AVegel TPruett SIGNATURE /RA Geoff /RA/ /RA/ /RA/ /RA/
Miller for/
DATE 12/27/16 1/5/17 1/9/17 1/9/17 1/10/17