IR 05000261/2017201
| ML17355A021 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 12/28/2017 |
| From: | Rachel Johnson Security Performance Evaluation Branch |
| To: | Remick J Duke Energy Corp |
| Cliff Roundtree | |
| References | |
| IR 2017201 | |
| Download: ML17355A021 (3) | |
Text
ber 28, 2017
SUBJECT:
H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - NRC SECURITY INSPECTION REPORT 05000261/2017201
Dear Mr. Remick:
On November 30, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the H.B. Robinson Steam Electric Plant, Unit 2. NRC inspectors discussed results of this inspection with Mr. Ernest Kapopoulos, Site Vice President, H.B. Robinson Steam Electric Plant, Unit 2, and other members of your staff. The results of this inspection are documented in the enclosed inspection report.
The NRC inspectors did not identify any findings or violations of more than minor significance.
This letter will be available for public inspection at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Request for Withholding.
The enclosed report contains Safeguards Information as defined by 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the material in the enclosed report will not be made publicly available. If you choose to provide a response that contains Safeguards Information, please provide the level of protection described in 10 CFR 73.21. Otherwise, if you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No. 50-261 License No. DPR-23 Nonpublic Enclosure: Inspection Report 05000261/2017201 w/Attachment: Supplemental Information cc w/ enclosure: Edward ONeil, General Manager, Nuclear Protective Services ML17355A021 Entire Report: Non-Sensitive Publicly Available Keyword:
SUNSI Review Complete Sensitive Non-Publicly Available MD 3.4 Non-Public By: A.3 Cover Letter Only: Non-Sensitive Publicly Available Keyword:
SUNSI Review Complete Sensitive Non-Publicly Available SUNSI Review By: Complete OFFICE NSIR/DSO/SPEB NSIR/DSO/SPEB NSIR/DSO/SPEB RII NSIR/DSO/SPEB NAME C. Roundtree J. Clark E. Byre B. Desai C. Johnson SIGNATURE E-mail DATE 12/19/17 12/20/17 12/20/17 12/27/17 12/28/17