IR 05000373/2019012

From kanterella
Revision as of 01:48, 8 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Design Basis Assurance Inspection (Teams) Inspection Report 05000373/201912 and 05000374/2019012 (DRS-J.Benjamin)
ML19253D023
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 09/10/2019
From: Karla Stoedter
Division of Reactor Safety III
To: Bryan Hanson
Exelon Nuclear, Exelon Nuclear Generation Corp
References
IR 2019012
Download: ML19253D023 (14)


Text