| | Start date | Site | Title |
|---|
| ML25182A059 | 1 July 2025 | Palisades | RFI for Fire Protection Inspection |
| ML25094A183 | 22 May 2025 | 05200050 | SDAA - FSER Appendix C - Abbreviations |
| LR-N25-0005, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 31 January 2025 | Salem | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors |
| ML24319A091 | 8 November 2024 | Fermi 07200071 | 5 to the Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
| ML24158A069 | 19 August 2024 | 05200050 | SDAA Chapter 9, Auxiliary Systems, SE with No Open Items |
| IR 05000338/2024010 | 24 May 2024 | North Anna | NRC Fire Protection Team Inspection (FPTI) Report 05000338/2024010 and 05000339/2024010 |
| ML24122C611 | 1 May 2024 | Grand Gulf | Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. |
| ML24114A174 | 15 April 2024 | Wolf Creek | Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Drawing E-1F9900, Rev. 10, Post-Fire Safe Shutdown Operator Manual Actions |
| ML24058A344 | 12 April 2024 | 99902049 | Enclosure 3 - 2-26-23 Public Meeting Summary - SMR Holtec Fire Protection |
| ML23214A287 | 31 October 2023 | | Regulatory Guide RG-1.189, Rev. 5, Fire Protection for Nuclear Power Plants |