ML19224C362

From kanterella
Revision as of 06:36, 5 September 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Submits Supplemental Response to IE Bulletin 79-08.No Tech Spec Changes Required as Result of Implementing Items 1-10
ML19224C362
Person / Time
Site: Pilgrim
Issue date: 05/15/1979
From: Andognini G
BOSTON EDISON CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
FOIA-79-98 79-93, NUDOCS 7907020221
Download: ML19224C362 (1)


Text

/. . . _ _ . . _ . _ . . _

.,-..BOSTON EDISON CO M PANY ornce omets aco scytamm stucrr sostem. Mas sacwus trTo o2199

a. cas .v.oon=w.

ac=NWCLEAS OPCRATIOMs DEPAAT,eCNT May 15, 1979 BECo. Ltr. #79- 93 Mr. Boyce H. Grier Office of Sspection and Enforce =ent Region I U.S. Nuclear Regulatory Co= mission 631 Park Avenue King of Prussia, PA.

19406 License No. DPR-35 Docket No. 50-293 Surelenentarv Resconse to IE Bulletin No. 79-08 Ref. a) Boston Edison Cc=pany letter to Mr. Boyce Grier dated April 25, 1979 titled " Response to II Sulletin 79-08"

Dear Sir:

Boston Edison Co=pany's initial response to II Eulletin 79-08 (Ref. a) included Ite=s 1-10.

Ite= 11 was to be addressed in a subsequent letter within 30 days of the date of the Sulletin and is as follows:

Item 11 Propose changes, as required, to those Technical Specifications which cast be = edified as a result of your implementing Ite=s 1-10.

Response No Technical Specificatien changes were required as a result of imple=enting te=s 1-10.

However, certain Station Procedures required modificatica and have been changed accord.ingly.

Should you have any further questions or concerns please do not hesitate to Contact US.

7ery : uly yours, 2 h h[l ['g_e'K/Gh cc: Director

.1K/0'5 #Office of Inspection and Enforc.enen:

.'Division of Reactor Operatiens Inspection Washington, D. C.

20555 7907020 #,, , A? ?&~