IR 05000255-13-402, 01/07/2013 - 01/11/2013, Palisades Nuclear Plant, Routine Security Baseline Inspection (Cover Letter Only)
ML13045A865
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/14/2013
From: Funk D
Plant Support Branch II
To: Vitale A
Entergy Nuclear Operations
References
IR-13-402
Download: ML13045A865 (4)


Text

ary 14, 2013

SUBJECT:

PALISADES NUCLEAR PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000255/2013402

Dear Mr. Vitale:

On January 11, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Palisades Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results which were discussed on January 11, 2013, with you and other members of your staff. The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. One NRC-identified finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process) was identified during this inspection. The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. This finding was determined to involve a violation of NRC requirements. The NRC is treating this violation as a Non-Cited Violation (NCV) consistent with Section 2.3.2 of the NRC Enforcement Policy. If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. copies to the Regional Administrator, Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Palisades Nuclear Plant. One cross-cuttring aspect was assigned to a finding in the area of Human Performance, Work Practices (H.4(c)), because the licensee failed to ensure supervisory and management oversight of work activities such that nuclear safety is supported. If you disagree with the cross-cutting aspect assigned in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region III, and the NRC Resident Inspector at Palisades Nuclear Plant. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a re sponse and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/ Donald Funk, Acting Chief Plant Support Branch Division of Reactor Safety

Docket No. 50-255 License No. DPR-20

Nonpublic Enclosure: Inspection Report 05000255/2013402 w/Attachment: Supplemental Information

cc w/encl: S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR T. Dimitriadis, RI B. Desai, RII M. Haire, RIV K. Yale, State Liaison Officer, State of Michigan

cc w/o encl: Distribution via ListServŽ