IR 05000352/2014001

From kanterella
Revision as of 14:33, 14 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
ROP 15 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2014001 and 05000353/2014001)
ML15062A213
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/04/2015
From: Ho Nieh
Division Reactor Projects I
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
BOWER, FL
Shared Package
ML15049A476 List:
References
IR 2014001
Download: ML15062A213 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 4, 2015 Mr. Bryan Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd. Warrenville, IL 60555 SUBJECT: ANNUAL ASSESSMENT LETTER FOR LIMERICK GENERATING STATION, UNITS 1 AND 2 (REPORT 05000352/2014001 AND 05000353/2014001)

Dear Mr. Hanson:

On February 9, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of the Limerick Generating Station (Limerick) Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of inspections at your facility. The NRC determined the performance at Limerick Generating Station, Units 1 and 2 during the most recent quarter was within the Regulatory ReOversight Process (ROP) Action Matrix because of one or more greater-than-green Security Cornerstone inputs as described in the NRC Inspection Report Nos. 05000352/2014405 and 05000353/2014405, sent on October 23, 2014. Therefore, the NRC plans to conduct a By a letter (ML15028A450) dated January 27, 2015, your staff notified the NRC of your readiness for the 95001 supplemental inspection and this onsite inspection has been scheduled for the week of March 16, 2015. The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to ROP baseline inspections, the NRC The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulationsof PracticPublic Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5262 with any questions you have regarding this letter.

Sincerely,

/RA/ Ho K. Nieh Director Division of Reactor Projects Docket Nos.: 50-352, 50-353 License Nos.: NPF-39, NPF-85 Enclosure: Limerick Generating Station Inspection/Activity Plan cc: Distribution via ListServ

ML15062A213 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME SBarber/ GSB FBower/ FLB HNieh/ HKN DATE 02/19/15 02/19 /15 02/25/15 Page 1 of 2 01/26/2015 09:40:28 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site LimerickInspection / Activity Plan 01/01/2015-06/30/201610/6EXAM-INITIAL OL EXAM 4 1 FY15-LIMERICK INITIAL OPERATOR LICENSING EXAM U01892 01/12/2015 01/21/201571124-RADIATION PROTECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/16/2015 03/20/2015 1, 2 IP Occupational ALARA Planning and Controls71124.02 03/16/2015 03/20/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/16/2015 03/20/2015 1, 2 IP Occupational Dose Assessment71124.04 03/16/2015 03/20/2015 1, 2 IP Radiation Monitoring Instrumentation71124.05 03/16/2015 03/20/201571124-RADIATION PROTECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/13/2015 04/17/2015 1, 2 IP Occupational ALARA Planning and Controls71124.02 04/13/2015 04/17/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 04/13/2015 04/17/2015 1, 2 IP Occupational Dose Assessment71124.04 04/13/2015 04/17/2015 1, 2 IP Radiation Monitoring Instrumentation71124.05 04/13/2015 04/17/20157111108G-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - BWR7111108G 04/20/2015 04/24/2015 CDBI-COMPONENT DESIGN BASIS INSPECTION 6 1, 2 IP Component Design Bases Inspection7111121 06/08/2015 06/12/2015 1, 2 IP Component Design Bases Inspection7111121 06/22/2015 06/26/2015 1, 2 IP Component Design Bases Inspection7111121 07/06/2015 07/10/201571124-REMP 1 1, 2 IP Radiological Environmental Monitoring Program71124.07 07/13/2015 07/17/2015 ISFSI-ISFSI LOADING INSPECTION 1 1, 2 IP Operation Of An ISFSI 60855 07/13/2015 07/17/2015 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 07/13/2015 07/17/201512/7EXAM-INITIAL OL EXAM 4 1 FY16 - LIMERICK INITIAL OPERATOR LICENSING EXAM U01912 12/07/201512/11/2015 1 FY16 - LIMERICK INITIAL OPERATOR LICENSING EXAM U01912 01/18/2016 01/22/201671124-RADIATION PROTECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/14/2015 09/18/2015 1, 2 IP Occupational ALARA Planning and Controls71124.02 09/14/2015 09/18/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/14/2015 09/18/2015 1, 2 IP Occupational Dose Assessment71124.04 09/14/2015 09/18/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 01/26/2015 09:40:28 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site LimerickInspection / Activity Plan 01/01/2015-06/30/201671124-RADIATION PROTECTION 1 1, 2 IP Radiation Monitoring Instrumentation71124.05 09/14/2015 09/18/2015 1, 2 IP Performance Indicator Verification71151 09/14/2015 09/18/20157111111B-REQUAL INSP W/ P/F RESULTS 2 1, 2 IP Licensed Operator Requalification Program7111111B11/16/201511/20/2015 EP-EP EXERCISE 6 1, 2 IP Exercise Evaluation711140111/16/201511/20/2015 1, 2 IP Exercise Evaluation - Scenario Review711140811/16/201511/20/201571124.08-RADWASTE 1 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0801/11/2016 01/15/201671124-RADIATION PROTECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 02/22/2016 02/26/2016 1 IP Occupational ALARA Planning and Controls71124.02 02/22/2016 02/26/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 02/22/2016 02/26/2016 1, 2 IP Occupational Dose Assessment71124.04 02/22/2016 02/26/2016 1, 2 IP Radiation Monitoring Instrumentation71124.05 02/22/2016 02/26/2016 ISI-U1 INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - BWR7111108G 03/28/2016 04/01/201671124-RADIATION PROTECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/28/2016 04/01/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 03/28/2016 04/01/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/28/2016 04/01/2016 1, 2 IP Occupational Dose Assessment71124.04 03/28/2016 04/01/2016 1, 2 IP Radiation Monitoring Instrumentation71124.05 03/28/2016 04/01/2016 TRI FI-TRIENNIAL FIRE PROTECTION 4 1, 2 IP Fire Protection [Triennial]7111105T 06/06/2016 06/10/2016 1, 2 IP Fire Protection [Triennial]7111105T 06/20/2016 06/24/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.