ML061390413

From kanterella
Revision as of 17:45, 13 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ltr 05/17/06 Point Beach NRC Physical Security Baseline Inspection Report No. 05000266-06-008(DRS); 05000301-06-008(DRS)
ML061390413
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/17/2006
From: Kenneth Riemer
Division of Nuclear Materials Safety III
To: Koehl D
Nuclear Management Co
References
IR-06-008
Download: ML061390413 (7)


See also: IR 05000266/2006008

Text

OFFICIAL USE ONLYOFFICIAL USE ONLYMay 17, 2006Mr. Dennis L. KoehlSite Vice President

Point Beach Nuclear Plant

Nuclear Management Company, LLC

6590 Nuclear Road

Two Rivers, WI 54241-9516SUBJECT:POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2NRC PHYSICAL SECURITY BASELINE INSPECTION REPORTNO. 05000266/2006008(DRS); 05000301/2006008(DRS)Dear Mr. Koehl:

On April 28, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection at your Point Beach Nuclear Plant. The inspection covered one or more of

the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. Theenclosed inspection report documents the inspection results, which were discussed on April 28,

2006, with you and other members of your staff.This inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observations of activities, and

interviewed personnel.Based on the results of this inspection no findings of significance were identified.EXEMPT FROM PUBLIC DISCLOSUREMay be exempt from public release under the Freedom ofInformation Act (5 U.S.C. 552)Exemption number: 5 Nuclear Regulatory Commission review required before publicrelease.T. Madeda, RIII/DRS/PSB Name and organization of person making determination.

Date of determination: 05/15/06 Enclosure Contains Sensitive UnclassifiedNon-Safeguards Information. Upon

Separation This Page is Decontrolled.

OFFICIAL USE ONLYOFFICIAL USE ONLYD. Koehl-2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMSis accessible from the NRC Website at http

//www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related information contained in

the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not beavailable for public inspection.Should you have any questions concerning this inspection, we will be pleased to discuss themwith you.Sincerely,/RA/Kenneth Riemer, ChiefPlant Support Branch

Division of Reactor SafetyDocket Nos. 50-266; 50-301License Nos. DPR-24; DPR-27Nonpublic Enclosure: Inspection Report 05000266/2006008(DRS); 05000301/2006008(DRS)

w/Attachment: Supplemental Informationcc w/encl: B. Westreich (NSIR/DNS) NSIR/DNS/RSS/Licensing AssistantDOCUMENT NAME: E:\Filenet\ML061390413.wpd

G Publicly Availablex

G Non-Publicly Available

G Sensitive

G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIIRIIINAMETMadeda:coPLoudenKRiemerDATE05/09/0605/10/0605/17/06OFFICIAL RECORD COPYEnclosure Contains Sensitive UnclassifiedNon-Safeguards Information. Upon

Separation This Page is Decontrolled.

OFFICIAL USE ONLYOFFICIAL USE ONLYD. Koehl-2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMSis accessible from the NRC Website at http

//www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related information contained in

the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not beavailable for public inspection.Should you have any questions concerning this inspection, we will be pleased to discuss themwith you.Sincerely,/RA/Kenneth Riemer, ChiefPlant Support Branch

Division of Reactor SafetyDocket Nos. 50-266; 50-301License Nos. DPR-24; DPR-27Nonpublic Enclosure: Inspection Report 05000266/2006008(DRS); 05000301/2006008(DRS)

w/Attachment: Supplemental Informationcc w/encl: B. Westreich (NSIR/DNS) NSIR/DNS/RSS/Licensing AssistantEnclosure Contains Sensitive UnclassifiedNon-Safeguards Information. Upon

Separation This Page is Decontrolled.

OFFICIAL USE ONLYOFFICIAL USE ONLYD. Koehl-3-cc w/o encl:F. Kuester, President and Chief Executive Officer, We Generation

D. Cooper, Senior Vice President, Group Operations

J. McCarthy, Site Director of Operations

D. Weaver, Nuclear Asset Manager

Plant Manager

Regulatory Affairs Manager

Training Manager

Site Assessment Manager

Site Engineering Director

Emergency Planning Manager

J. Rogoff, Vice President, Counsel & Secretary

K. Duveneck, Town Chairman

Town of Two Creeks

Chairperson

Public Service Commission of Wisconsin

J. Kitsembel, Electric Division

Public Service Commission of Wisconsin

State Liaison OfficerEnclosure Contains Sensitive UnclassifiedNon-Safeguards Information. Upon

Separation This Page is Decontrolled.

OFFICIAL USE ONLYD. Koehl-4-ADAMS Distribution

JLD

CFL

EMH1

LXR1

RidsNrrDirsIrib

GEG

KGO

CAA1

RGK

LSL (electronic IR's only)

C. Pederson, DRS (hard copy - IR's only)

DRPIII

DRSIII

PLB1

JRK1

ROPreports@nrc.gov OFFICIAL USE ONLYEnclosure Contains Sensitive UnclassifiedNon-Safeguards Information. Upon

Separation This Page is Decontrolled.