IR 05000293/2006008
| ML062070396 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 07/26/2006 |
| From: | Ray Lorson Plant Support Branch 1 |
| To: | Balduzzi M Entergy Nuclear Operations |
| References | |
| IR-06-008 | |
| Download: ML062070396 (4) | |
Text
July 26, 2006 Enclosure Contains Safeguards Information.When Separated from enclosure, this
document is not Safeguards Information.
Mr. Michael Balduzzi Site Vice President
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station
600 Rocky Hill Road
Plymouth, MA 02360-5508SUBJECT:PILGRIM NUCLEAR POWER STATION - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NO. 05000293/2006008
Dear Mr. Balduzzi:
On June 16, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Pilgrim Nuclear Power Station. The inspection covered one or more
of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The
enclosed report documents the inspection results, which were discussed on June 16, 2006, with
Mr. Fred Marcussen, Security Manager, and other members of your staff.
The inspection examined activities conducted under y our license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed
personnel.Warning: Violation of section 147 of the AtomicEnergy Act, "Safeguards Information" is subject to civil and criminal penalties DETERMINATION MADE BY:
NAME/TITLE: Raymond K. Lorson, ChiefORGANIZATION: RI/DRS/PSB1BASIS: DG-SG-1:_(300) Physical Protection ProgramSIGNATURE____/RA/___________ DATE:_07/26/06
_ M. Balduzzi2 No findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the
enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be
available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's
document system, ADAMS. If Safeguards Inform ation is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
Sincerely,
/RA/Raymond K. Lorson, Chief Plant Support Branch 1
Division of Reactor SafetyDocket Nos.50-293License Nos.DPR-35Enclosure:NRC Inspection Report No. 05000293/2006008 (CONTAINS (SGI)
cc w/encl; w/SGI F. Marcussen, Manager - Nuclear Security C. McCombs, Director, Massachusetts Emergency Management Agency cc w/o encl w/o SGI
- G. J. Taylor, Chief Executive Officer, Entergy Operations
M. Kansler, President, Entergy Nuclear Operations, Inc.
J. T. Herron, Senior Vice President and Chief Operating Officer
C. Schwarz, Vice-President, Operations Support
S. J. Bethay, Director, Nuclear Safety Assurance
O. Limpias, Vice President, Engineering
J. F. McCann, Director, Licensing
C. D. Faison, Manager, Licensing
M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.
B. S. Ford, Manager, Licensing, Entergy Nuclear Operations, In